This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on April 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BBVC Lakefront Trail and Outhouse Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves the removal of an existing concrete trail along the Portage Lake lakefront and the construction of a new trail that will connect the Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC) in Portage Valley, Alaska. The scope also includes decommissioning two existing outhouses and constructing a new double vault outhouse at a different location. The work encompasses demolition, earthwork, clearing and grubbing, installation of small concrete structures and retaining walls, drainage systems, trail switchbacks and surfacing, outhouse installation, erosion control, and re-seeding. The project carries an option to build a scenic outlook platform with interpretive panels by the lakefront, as well as an additional option to construct a trail linking the beach access near the building to the parking lot. The period of performance for this project is from June 1, 2026, through October 31, 2027. It is a total small business set-aside contract under NAICS code 237990, overseen by the USDA Forest Service within the Department of Agriculture. The solicitation was posted on March 3, 2026, with a response deadline of April 22, 2026. The work is to be performed in Alaska at the BBVC location, with project coordination accessible through the primary contact, Eric Oldenkamp. The overall effort aims to enhance visitor access and facilities while ensuring environmental preservation along the lakefront.
General Info
Agency
NAICS
Place of Performance
AK, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Amendment 1 (posted 4/20/2026): The purpose of this amendment is to make the following changes:
1. Disregard the custom sheltered entrances on sheet G-02 of the plans.
2. The quantity for item 2 subitem 55202-B2 has been increased to 2300.
3. The quantity for item 3 subitem 55202-O1 has been increased to 450.
4. There will not be a charge for on-site borrow.
5. The due date for quotes is extended to 4/23/2026 at 1700 (5 pm) Alaska time.
Statement of Requirement
This project involves the removal of an existing concrete trail along the Portage Lake lakefront, and construction of a new trail that connects the existing Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC). Additionally, two (2) existing outhouses will be decommissioned, and one (1) new double vault outhouse will be built in a new location.
- Option item: Work consists of constructing a scenic outlook platform with interpretive panels by the lakefront.
- Option item: Construction of a trail connecting the beach access near the building to the parking lot.
Project work will include demolition, earthwork, clearing and grubbing, small concrete structures, retaining wall installation, drainage, trail switchbacks, trail surfacing, outhouse installation, erosion control measures and re-seeding.
Period of performance: 6/1/2026 to 10/31/2027.
The project is located at the Begich Boggs Visitor Center in Portage Valley, Alaska. Latitude: 60°47'4.52"N, Longitude: 148°50'28.47"W.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
