Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on April 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BBVC Lakefront Trail and Outhouse Replacement

Awarded
1240BJ26Q0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Construction Services for Confined Aquatic Disposal Cell Construction and Maintenance Dredging of the Providence River Federal Navigation Project, Providence, Rhode Island.
Solicitation # W912WJ27X1CUP
The U.S. Army Corps of Engineers, New England District, is seeking information from small and large businesses for a dredging project in Providence, Rhode Island, under NAICS code 237990. The project is estimated to cost between $80,000,000 and $100,000,000, with a solicitation expected around March 15, 2027. Construction is scheduled to begin in September 2027 and last approximately two years, spanning two dredging seasons from September 1, 2027, to August 31, 2029. The work is divided into two primary sequences: the construction of a new Confined Aquatic Disposal (CAD) cell at Edgewood Shoals North, including an access channel, and the subsequent maintenance dredging of the Providence River and Harbor Federal Navigation Project to a depth of -40 feet MLLW plus two feet of allowable overdepth. The total scope involves mechanically dredging approximately 5,500,000 cubic yards of material using closed clamshell buckets. Specifically, 3,200,000 cubic yards will be removed to create the CAD cell, with material placed at Port Edgewood Basin, Fox Point Reach CAD cells, Prudence Island, and the Rhode Island Sound Disposal Site. The remaining 2,300,000 cubic yards of maintenance material will be placed within the newly constructed Edgewood Shoals North CAD cell. To meet strict environmental windows and project timelines, the contractor must maintain a production rate of at least 300,000 cubic yards every 30 calendar days, operating 24 hours a day, 7 days a week. Interested firms must submit a capabilities package by November 26, 2026, demonstrating experience with these production rates and open water placement in New England during winter months.
W2SD Endist New England

POSTED

about 2 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This contract involves the removal of an existing concrete trail along the Portage Lake lakefront and the construction of a new trail that will connect the Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC) in Portage Valley, Alaska. The scope also includes decommissioning two existing outhouses and constructing a new double vault outhouse at a different location. The work encompasses demolition, earthwork, clearing and grubbing, installation of small concrete structures and retaining walls, drainage systems, trail switchbacks and surfacing, outhouse installation, erosion control, and re-seeding. The project carries an option to build a scenic outlook platform with interpretive panels by the lakefront, as well as an additional option to construct a trail linking the beach access near the building to the parking lot. The period of performance for this project is from June 1, 2026, through October 31, 2027. It is a total small business set-aside contract under NAICS code 237990, overseen by the USDA Forest Service within the Department of Agriculture. The solicitation was posted on March 3, 2026, with a response deadline of April 22, 2026. The work is to be performed in Alaska at the BBVC location, with project coordination accessible through the primary contact, Eric Oldenkamp. The overall effort aims to enhance visitor access and facilities while ensuring environmental preservation along the lakefront.

General Info

Remove and rebuild trail, decommission outhouses, construct facilities, improve erosion control in Alaska.

Agency

Department Of Agriculture → USDA Forest Service

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

AK, USA

Set-Aside

SBA

Documents

9

RFQ 1240BJ26Q0004 BBVC Lakefront Trail and Outhouse Replacement

PDF, High priority: read this first21 pages · rfq
High

RFQ 1240BJ26Q0004 BBVC Lakefront Trail and Outhouse Replacement

PDF, High priority: read this firstrfq
High

Solicitation 1240BJ26Q0004 Attachment - Quote for BBVC Lakefront Trail and Outhouse Replacement

DOCX, High priority: read this firstquote
High

Solicitation 1240BJ26Q0004 Attachment - Quote for BBVC Lakefront Trail and Outhouse Replacement

DOCX, High priority: read this first4 pages · quote
High

C-2+Attachment+1+SOW.pdf

PDF

C-2+Attachment+2+Specifications.pdf

PDF

C-2+Attachment+3+Plans+and+Drawings.pdf

PDF

C-2+Attachment+4+Wage+Determination.pdf

PDF

C-2+Attachment+6+Bid+Bond+SF24.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Apr 22, 2026 to Apr 24, 2026. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service
Contacts1 person available
OfficeKLAMATH FALLS, OR, 97601, USA
Organization / Agency
Department Of Agriculture → USDA Forest Service
Office AddressKLAMATH FALLS, OR, 97601, USA
Contacts
Eric Oldenkamp

Full Description

Show more

Amendment 1 (posted 4/20/2026): The purpose of this amendment is to make the following changes:


1. Disregard the custom sheltered entrances on sheet G-02 of the plans.


2. The quantity for item 2 subitem 55202-B2 has been increased to 2300.


3. The quantity for item 3 subitem 55202-O1 has been increased to 450.


4. There will not be a charge for on-site borrow.


5. The due date for quotes is extended to 4/23/2026 at 1700 (5 pm) Alaska time.


Statement of Requirement


This project involves the removal of an existing concrete trail along the Portage Lake lakefront, and construction of a new trail that connects the existing Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC). Additionally, two (2) existing outhouses will be decommissioned, and one (1) new double vault outhouse will be built in a new location.


  1. Option item: Work consists of constructing a scenic outlook platform with interpretive panels by the lakefront.
  2. Option item: Construction of a trail connecting the beach access near the building to the parking lot.

Project work will include demolition, earthwork, clearing and grubbing, small concrete structures, retaining wall installation, drainage, trail switchbacks, trail surfacing, outhouse installation, erosion control measures and re-seeding.


Period of performance: 6/1/2026 to 10/31/2027.


The project is located at the Begich Boggs Visitor Center in Portage Valley, Alaska. Latitude: 60°47'4.52"N, Longitude: 148°50'28.47"W.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS