Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Utah was posted on July 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BD27-4 Wasatch Watershed Restoration Project: Big Cottonwood Canyon Hand Cut & Pile

Closed
BD27-4State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The State of Utah Division of Purchasing, in coordination with the Division of Wildlife Resources, is soliciting bids for hand-cut and pile wildfire fuels reduction services across 749 acres in Big Cottonwood Canyon, with all work required to be completed by November 30, 2026. Participation is restricted exclusively to contractors prequalified on the current Vendor list; submissions from non-prequalified entities will be rejected. A mandatory in-person site visit at the Days Fork Trailhead on August 5, 2026, at 10:00 a.m. is required for all bidders, with attendance by an authorized representative being non-negotiable—failure to attend or leaving early will result in disqualification, and phone use is limited to taking photographs only. Contractors must arrive in a four-wheel-drive vehicle due to terrain conditions. The solicitation follows an Invitation for Bids (IFB) structure on a Firm-Fixed-Price basis and anticipates award to the lowest responsive and responsible bidder based on a Lowest Price Technically Acceptable (LPTA) evaluation method. Evaluation is weighted heavily toward Quality of Product or Service and Timeliness of Performance, each multiplied by eight, with Contract Management weighted at four, assessed using a five-point adjectival rating scale. Performance must meet state and federal standards including FedRAMP/GovRAMP authorization timelines, with the vendor required to achieve Core, Ready, or Authorized status within 12, 18, or 24 months respectively and provision continuous monitoring access within two weeks of intent to award. Vendor personnel must pass background checks, and no subcontractor or employee may access sensitive areas without authorization. All cloud services must be hosted exclusively within State of Utah DTS-managed environments (AWS, GCP, Azure), and vendors must exclude hosting costs from their pricing. Bids must include both redacted and non-redacted versions, comply with anti-boycott provisions under UCA 63G-27, and certify no use of forced labor or products from restricted foreign entities under UCA 63G-6a-121. The contract is governed solely by state procurement rules, and any vendor-added terms are void. Proposals must be submitted electronically via U3P by the August 13, 2026 deadline, and pricing must remain guaranteed through project completion. Inspection and acceptance occur at the project site upon final work completion, with no specified invoicing system or payment office details provided. All

General Info

Hand-cut wildfire fuel reduction on 769 acres in Big Cottonwood Canyon, Utah, due Nov 30, 2026; prequalified vendors only, mandatory site visit Aug 5, 2026.

Agency

NAICS

N/A

Place of Performance

UT, USA

Set-Aside

NONE

Documents

11

Agency Terms and Conditions GS Attachment A

PDF, High priority: read this first6 pages · contract-document
High

Big Cottonwood Canyon 26 Wasatch Front Watershed Restoration IGE

XLSX, High priority: read this first7 pages · independent-government-estimate
High

Big Cottonwood Canyon Thinning Diagrams Final Draft

PDF, High priority: read this first13 pages · specifications
High

Scope of Work BD27-4 Wasatch Watershed Restoration Project

PDF, High priority: read this first28 pages · sow
High

Scope of Work BD27-4 Wasatch Watershed Restoration Project Rev1

PDF, High priority: read this first28 pages · sow
High

BigCottonwood CutPile2026 Overview Map

PDF, Low priority1 page · other
Low

Project Maps and Unit Area Diagrams

PDF, Low prioritymaps
Low

Rangeland Contract Performance Evaluation

PDF, Low priority2 pages · contract-performance-evaluation
Low

Vendor Prerequisites for IFB Agency Solicitation

PDF, Low priority7 pages · other
Low

BCC CP FY26 Final ContractAreas.zip

ZIP

Revised Unit Maps ZIP.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyUtah
Contacts1 person available
OfficeUT, USA
Organization / AgencyUtah
Office AddressUT, USA
Contacts

Full Description

Show more
Issuing Procurement Unit: State of Utah Division of Purchasing Conducting Procurement Unit: Division of Wildlife Resources
**Participation in this solicitation is limited to prequalified contractors only. Do NOT submit if you are not on the current Pre-approved/Pre-qualified Vendor list.**
The purpose of this IFB is to enter into a contract to provide: Hand cut & Pile wildfire fuels reduction services on 769 acres of the Big Cottonwood Canyon area by November 30th, 2026.
A MANDATORY SITE VISIT will be held on August 5, 2026 at 10:00am. We will meet at Days Fork Trail head. A sign-in sheet will be provided for all attendees to sign in with the company name, contact person, phone number, and email. Per Utah Procurement Rule R33-6-I 03 Pre-Bid Conferences and Site Visits. Mandato1y site visits must be attended in person by an authorized representative of the person or vendor submitting a bid. The meeting will begin promptly at the above time. Any prospective bidders who arrive after the stated time of the meeting will not be allowed to submit a bid. Failure to attend the site visit shall result in the disqualification of any bidder who docs not have an authorized representative attend the entire duration of the mandatory site visit. This includes not taking calls/texts during the site visit. Phones may be used to take pictures. All discussions not related to the site visit must be done after the site visit to not be a distraction during the site visit. An attendance log will be maintained including the name of each attendee, the entity the attendee represents, and the attendee's contact information, minutes of the site visit, and copies of any documents distributed by the conducting procurement unit to the attendees and shall be published as an addendum to the solicitation. Any verbal modifications made to any of the solicitation documents during the mandatory site visit shall be reduced to writing and will be published as an addendum to the solicitation.
A four-wheel-drive vehicle is recommended.
From 1-215 take Exit 6 (6200 S). Tum east onto 6200 S/Big Cottonwood Rd. Turn east onto UT-190/Big Cottonwood Cyn Rd. travel 7.7 miles to Mineral Fork Trailhead, 11 miles to Mill D Trailhead and Cardiff, and 12 miles to Days Fork. See Figure l an area map from the Salt Lake to Mineral, Mill D, Cardiff and Days Fork Project Sites.
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive and responsible vendor.
Project Performance Time: From time of award - November 30th, 2026.
Vendor must guarantee its pricing through completion of the project.

More opportunities from Utah

Same awarding agency

NAICS: 541310
New
SLED
Sandy City - Architectural Design for City Hall Stairs, Ramp, and Landscape
Solicitation # GJ27-124
Sandy City is soliciting proposals for professional architectural design services under solicitation GJ27-124 to improve Sandy City Hall, located at 10000 South Centennial Parkway, Utah. The scope of work involves the replacement of the west stairs, the construction of an ADA-compliant pedestrian ramp, and a comprehensive landscape redesign of the north hillside and southwest corner. Key technical requirements include the design of a complete hydronic snowmelt system with a new boiler integrated into the City's Alerton building automation system, as well as landscaping that adheres to Waterwise design principles and Sandy City's Division 7 Landscaping and Irrigation standards. The selected architect will be responsible for providing preliminary concepts, 60% and 90% design submissions, and final bid-ready construction documents, along with cost estimates at each milestone. The project operates on a strict timeline, with 100% complete construction documents due by February 1, 2027, and a final project completion goal of June 30, 2027. The architect is also required to participate in a warranty walk approximately 10 months after substantial completion. Proposals must be submitted as a fixed, lump-sum fee via the sandycity.ionwave.net portal. The deadline for submitting written questions is November 4, 2026, at 11:30 AM MT, and the final closing date for bid submissions is November 6, 2026, at 11:30 AM MT. Evaluation will be based on a 100-point criteria system, and the design must ensure continued safe public access and building egress as City Hall will remain operational throughout the construction process.
Architectural Services

POSTED

3 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS