Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Beal Mountain Mine Barren Pond Removal

Active
AG-0343-S-14-0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

MT

Set-Aside

SBA

Documents

10

Beal Mountain Mine Barren Pond Pre-Bid Meeting Q&A (Aug 16, 2014)

PDF, High priority: read this first2 pages · q-and-a
High

General Decision Number MT140076 - Montana Heavy Construction

PDF, High priority: read this first5 pages · wage-determination
High

Project 114-560420: Barren Pond Removal - Drawings

PDF, High priority: read this firstspecifications
High

RFP AG0343 S14 0007 - Beal Mountain Mine Barren Pond Removal

PDF, High priority: read this first78 pages · rfp
High

Testing Special Specification - Subsection 3.04

PDF, High priority: read this first1 page · specifications
High

Amendment_1.pdf

PDF

Amendment_2_pkg.pdf

PDF

HDPE_Spec.pdf

PDF

Signed_Drawing_Cover_Page.pdf

PDF

Underdrain_Design_Spec.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseSolicitation
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → R1 Regional Office
Contacts1 person available
OfficeMISSOULA, MT, 59804, USA
Office AddressMISSOULA, MT, 59804, USA
Contacts
Dale R. ReckleyContracting Officer

Full Description

Show more
The Beaverhead-Deerlodge National Forest of the US Forest Service anticipates awarding a construction contract for removal of a barren pond at the Beal Mountain Mine site. The project is located at the Beal Mountain Mine located in the headwaters of German Gulch in the Pioneer Mountains, Silver Bow County, Montana, about 16 miles west southwest of Butte and 10 miles southwest of Fairmont (Gregson) Hot Springs. The Beal Mountain Mine is a former open pit gold mine. This project consists of the removal of the cyanide barren pond which was used in the processing of gold at the site. During reclamation, this pond was used as part of a biological water treatment process and contains residual bio solids. The purpose of this project is to remove the barren pond and perform exploratory exploration work in an effort to locate and dispose of pipelines, underdrains and any contaminated material beneath and adjacent to the pond. The following are the major work items: ? Burial of existing HDPE pipes near the Water Treatment Plant; Removal and disposal of concrete pads and miscellaneous debris; ? Removal, drying and placement of biosolids from the Barren Pond; ? Removal, drying and placement of underlying clay soil and excess soil; ? Exploratory excavation; ? Construction of a lined temporary drying pad; ? Construction of a temporary repository; and ? Transfer of runoff to the leach pad; This is a presolicitation notice only. A detailed solicitation will be posted in approximately 15 days.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Alligator Creek Weir Structure Repairs
Solicitation # FWC 26/27-33C
The Florida Fish and Wildlife Conservation Commission issued solicitation FWC 26/27-33C for the concrete rehabilitation of a 70-year-old water control weir structure located at the north prong of Alligator Creek in the Babcock Webb WMA. The scope of work includes short-term repairs such as spall and crack repairs, as well as the restoration of a significantly eroding cold joint, all performed according to specifications by GM Hill Engineering and Chapter 255 of the Florida Statutes. While the agency's estimated budget for the project was 45,000 dollars, the contract was awarded to A Thomas Construction Inc. following a competitive bidding process that included a mandatory pre-bid conference on September 29, 2026, and a bid opening on October 13, 2026. The awarded contract is a lump sum agreement with a total value of 29,890 dollars. Key requirements for the contractor include the provision of 100 percent performance and labor and material payment bonds regardless of the contract value, adherence to Build America, Buy America domestic material preferences, and compliance with Davis-Bacon Act prevailing wage standards for federally funded construction. The agency decision to award the contract was posted on October 15, 2026, initiating a 72-hour protest period pursuant to Chapter 120, Florida Statutes. Final acceptance of the project is contingent upon a Certificate of Substantial Completion and a final inspection approved by the owner.
Florida Fish and Wildlife Conservation Commission

POSTED

about 23 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
Federal
Sources Sought Wood River Relief Wells Construction
Solicitation # W912P926Z9215
The Department of Defense, through the U.S. Army Corps of Engineers St. Louis District, has issued a Sources Sought Notice under solicitation W912P926Z9215 for the Wood River Relief Wells No. 2 construction project. This notice is intended for market research and informational purposes to identify capable contractors and does not constitute a formal Request for Proposal. The project is located within the Lower Wood River Flood Protection Project in Madison County, Illinois, specifically covering Reach II and Reach III between river miles 195 and 203 on the east bank of the Mississippi River. The scope of work involves the construction of 42 surface discharging Type D relief wells, 13 Type T relief wells placed in manholes with lateral discharge pipes, and six piezometers consisting of three sets of crown and toe piezometers. Additionally, the project requires the installation of a relief well manhole collector system with associated culverts, as well as localized fill placement and channel improvements within Old Wood River Creek. Interested businesses must be registered in the System for Award Management under NAICS Code 237990. To be considered, respondents must submit a capability and experience statement to Logan Kohrmann by 10:00 a.m. CDT on October 28, 2026. Submissions must include the business name, point of contact, business size and category, CAGE or UEI code, and descriptions of up to three similar projects performed as a prime contractor, detailing the percentage of work self-performed versus subcontracted.
W07V Endist St Louis

POSTED

about 23 hours ago

DEADLINE

in 12 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS