IFB-128357State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bealeton Lift Station Wet Well Upgrade, solicitation number 27-C-04-0271, is a project issued by the Fauquier Water & Sanitation Authority in Virginia. The scope of work involves the replacement of lift station wet well equipment and appurtenances nearing the end of their service life, specifically including submersible pumps, wet well piping, slide rails, base 90-degree elbows, level sensors, floats, and pressure transducers. Additional requirements include recoating the wet well interior for corrosion protection and installing safety grates beneath access hatches. Construction is strictly limited to the wet well, with no improvements to the valve vault or metering chamber. The project is governed by NAICS code 237110 and requires compliance with all applicable OSHA and VOSH requirements. Following the Notice to Proceed, substantial completion must be achieved within 150 calendar days and within 30 consecutive calendar days after the start of bypass pumping operations, with final completion due 30 calendar days thereafter. Bids were requested by October 13, 2026, and could be submitted via eVA's electronic bidding system or delivered to the authority's office in Warrenton, Virginia. Key project management is led by Michael Edelen for the owner and Nate Nickerson and Meghan O'Brien for the engineering firm SEH.

General Info

Fauquier Water & Sanitation Authority project to upgrade Bealeton Lift Station wet well equipment.

Documents

4

Bealeton Pump Station Upgrades - Addendum No. 2

PDF, High priority: read this firstamendment
High

Bealeton Pump Station Upgrades - IFB (Contract No. 27-C-04-0271)

PDF, High priority: read this firstifb
High

FCWSA Contract No. 27-C-04-0271 Addendum No. 1 - Bealeton Pump Station Upgrades

PDF, High priority: read this firstamendment
High

Bealeton Pump Station Upgrades Pre-Bid Meeting Minutes

PDF, Low prioritypre-bid-minutes
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia → Fauquier Water & Sanitation Authority
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Tiffany Montacute

Full Description

Show more
Replacement of existing lift station wet well equipment and appurtenances nearing the end of their service life, including pumps, guide rails, base elbows, piping, and level instrumentation. Work includes recoating the wet well interior for corrosion protection and installation of safety grates beneath access hatches to enhance safety. Construction is limited to the wet well, with no improvements to the valve vault or metering chamber.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements Redesign Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening, a new influent eccentric manhole, a concrete flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and pump system, the construction of two soil cement lined sludge dewatering ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is set aside for small businesses, including certified DBE, MBE, and WBE firms, across a wide range of NAICS codes related to heavy and specialty construction. Interested parties must submit their responses by October 21, 2026. Primary coordination for this solicitation is handled by Christina Pauls at GSE Construction Co., Inc.
GSE Construction Co., Inc.

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237110
New
City of Lomita: Zone G Water Main Replacement Project
Solicitation # city-lomita-zone-g-water-main-replacement-project
The City of Lomita Zone G Water Main Replacement Project involves the installation of approximately 4,500 linear feet of new 8-inch DIP water mains, gate valves, fittings, water services, and fire hydrant assemblies on Walnut Street, Ebony Lane, and 247th Place. The scope of work includes the abandonment of existing water mains and requires the provision of all necessary materials, tools, and equipment. W.A. Rasic Construction Company, Inc. is soliciting subcontractor quotations for various trades, including waterworks, ready-mix concrete, PCC and AC paving, AC grind and cap, striping, traffic control, hot taps, trucking, and soil and material testing. The response deadline for quotations is October 19, 2026, at 1:00 PM. This opportunity is specifically set aside for DBE, MBE, WBE, and SBE firms, with the prime contractor encouraging maximum participation through economically feasible task breakdowns or consortia. Eligible subcontractors must possess a valid California Contractors License and be registered with the Department of Industrial Relations per Section 1725.5 of the Public Contract Code. Additionally, subcontractors may be required to provide payment and performance bonds totaling 100 percent of their bid, with bond premiums reimbursed up to 1.5 percent. All selected subcontractors must execute the standard subcontract agreement and meet general insurance requirements.
W.A. Rasic Construction Company

POSTED

about 6 hours ago

DEADLINE

in 16 days
View Details

More opportunities from Virginia → Fauquier Water & Sanitation Authority

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS