Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

BEAM ASSEMBLY, ROTOR

Open
SPE4A7-27-T-4409Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Solicitation SPE4A7-27-T-4409 is a fixed-price procurement by the Defense Logistics Agency for 164 rotor beam assemblies, identified as a Navy Critical Safety Item. The contract requires the delivery of two units for first article testing at the Fleet Readiness Center East in Cherry Point, North Carolina, within 30 calendar days of the contract date. Following first article approval, the contractor must perform production lot testing to validate quality conformance, with samples shipped to the same facility. The final delivery of the 164 units is expected by August 22, 2027, with a total delivery period of 506 days, shipping FOB Origin to the DLA Distribution New Cumberland facility. The contractor must maintain a quality management system compliant with SAE AS9100 or an equivalent standard and adhere to strict packaging and marking requirements per MIL-STD-2073-1E and MIL-STD-129. Key regulatory compliance includes the Buy American Act, Berry Amendment, and DFARS 252.204-7012 for safeguarding covered defense information, alongside CMMC Level 2 requirements. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system. Inspection and acceptance are conducted at the point of origin per FAR 52.246-2.

General Info

DLA fixed-price contract for 164 rotor beam assemblies delivered by August 2027.

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this first24 pages · rfq
High

Read the document

Due in 8 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 8 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseSolicitation
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV
Contacts1 person available
OfficeUSA

Full Description

Show more
OF THE SOLICITATION, SELECT
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – GOVERNMENT TESTING REQUIRED (FAR 52.209-4 AND
ALT I)
THE CONTRACTOR SHALL DELIVER 2 UNIT(S) OF
LOT/ITEM 1615 / 11898765
WITHIN 30 CALENDAR DAYS FROM THE DATE OF
THIS CONTRACT TO THE GOVERNMENT AT THE LOCATION SPECIFIED BELOW FOR
FIRST ARTICLE TESTS.
N65923
FLEET READINESS CENTER EAST
RECEIVING OFFICER
BLDG 148, BAY C
BEACHEY ROAD
CHERRY POINT
NC
28533-5040
WITHIN 90 CALENDAR DAYS AFTER THE GOVERNMENT
RECEIVES THE FIRST ARTICLE, THE CONTRACTING OFFICER SHALL NOTIFY THE
CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR
DISAPPROVAL OF THE FIRST ARTICLE.
DISPOSITION OF FIRST ARTICLES:
Procurement Note E01: Supplemental First Article Exhibit Disposition Contractor Maintained (MAY 2020)
The first article units will be maintained or returned to the contractor to be used as a manufacturing standard. The contractor shall hold the approved first article units at the production facility until all production quantities have been produced and accepted. In the case of indefinite delivery contracts, the contractor shall hold the first article units until final production run has been approved and accepted on the first delivery order. The unit shall be considered a production guide or manufacturing standard if defects are reported on delivered material or problems are encountered during production. When disposing the units, the contractor shall follow DFARS 252.245-7004(d).
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the
SPE4A7-27-T-4409
SECTION A
approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
MCAS CHERRY POINT, NC N65923 FLEET READINESS CENTER EAST RECEIVING OFFICER
BLDG 148, BAY C BEACHEY ROAD CHERRY POINT NC 28533-5040
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 60 test plus 90 NSN/Part Number: 1615-01-189-8765 Quantity: 164 EA Purchase Request: 7017409885QTY: 164 Delivery: 506 days ADO

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS