Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on February 1, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BEAR Water Distribution System

Awarded
FA8533-08-R-23231Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract solicitation is for a six-year firm-fixed-price requirements-type indefinite-delivery contract for the procurement of the Basic Expeditionary Airfield Resources (BEAR) Water Distribution System, designed to support forward-deployed bases in austere environments. The BEAR system is modular and capable of drawing water from natural sources, purifying, storing, and distributing it while ensuring adequate pressure, quantity, and quality. It also handles wastewater removal and storage. The system supports increments of 1,100 personnel and includes multiple subsystems such as Source Run, Water Production Units (1500 and 600 ROWPU), various 550 Initial and Follow-on Subsystems, and Industrial Operations and Flightline Extensions. The contract includes a basic 24-month period with four one-year options and detailed Best Estimated Quantities (BEQs) for multiple NSNs covering various system components, MRSP kits, and initial spares. The solicitation is a total small business set-aside, using FAR Part 15 procedures with first article testing required. Evaluations will be conducted via a Technically-Acceptable Performance Price Trade-Off method. Proposals were originally due by June 19, 2009, with amendments extending some dates to July 6, 2009. The anticipated award date was on or before September 14, 2009. Foreign participation is restricted at the prime contractor level, and any US contractors involved must be certified and registered with the Defense Logistics Supply Chain, demonstrating a legitimate business purpose related to military or space applications. Multiple USAF shipping locations are involved, with delivery scheduled at 180 days after receipt of order. The Government has provided detailed instructions and amendments clarifying quantities and answering questions related to the requirement. Contacts for this solicitation include contracting officers Jennifer T. Dugger and Christie H. Brown.

General Info

Six-year fixed-price contract for BEAR water systems supporting austere military bases, small business set-aside.

Agency

N/A

Contract Value

$0

NAICS

333911 - Pump and Pumping Equipment Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Response deadline added: Jun 19, 2009. The notice description changed.

Notice updated

Response deadline changed from Jun 19, 2009 to Jul 6, 2009. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Jennifer T. DuggerContract Specialist
Christie H.BrownContracting Officer

Full Description

Show more
**Posted 03 Sept 2009 -- The purpose of this posting is to upload Amendment 0002 to RFP FA8533-08-R-23231.** ** Posted 18 June 2009 -- The Government's response to questions received relative to the BEAR Water Distribution System requirement are attached. Also, please see RFP amendment FA8533-08-R-23231-0001, Purchase Description PD07WRGBGBLC48 Rev 01, and MRSP Kits spreadsheet. Interested parties should note that amendment 0001 changes the closing date for RFP FA8533-08-R-23231 to 6 July 2009 at 4:00 PM Eastern.** **The purpose of this posting is to upload the RFP and related Attachments. Proposals are due NLT 4:00pm Eastern on 19 June 2009.** **The purpose of this amendment is to decrease the Best Estimated Quantities (BEQs) for the 1500 ROWPU (NSN 4610-01-565-5686EJ). Revised BEQs are as follows -- Basic Qty: BEQ 10; Opt I: BEQ 5; Opt II: BEQ 4; Opt III: BEQ 3; Opt IV: BEQ 1** **Please be advised that this requirement was previously synopsized under solicitation # FA8533-09-R-23231. There have been no other changes.** This requirement is for a 6-year Firm-Fixed Price Requirements-type Indefinite-Delivery contract for the procurement of the Basic Expeditionary Airfield Resources (BEAR) Water Distribution System. The BEAR Water Distribution System is a system which draws water from a natural source, purifies, stores, and delivers the water while maintaining sufficient water pressure, quantity, and quality for an entire forward-deployed base in austere locations. The water system also has the capability to remove and store the base wastewater at a remote location. The water system is modular in design and consists of a series of pumping, piping, and storage equipment; applicable fittings; and other components such as manual and automatic fluid control mechanisms. The system is designed to provide service in increments of 1100 personnel and can theoretically be expanded upon indefinitely. One complete increment is comprised of one Source Run Subsystem, one Water Production Subsystem (1500 ROWPU OR 600 ROWPU), three 550 Initial Subsystems, three 550 Follow-on Subsystems, and one Industrial Operations and Flightline Extension. Material: Various The requirement will consist of one basic period of 24 months and 4 annual options. The best estimated quantities (BEQs) are as follows: NSN 4320-01-562-3858EJ (Source Run) - Basic Qty: BEQ 2; Opt I: BEQ 1; Opt II: BEQ 1; Opt III: N/A; Opt IV: N/A NSN 4320-01-562-6244EJ (550 Initial) - Basic Qty: BEQ 7; Opt I: BEQ 6; Opt II: BEQ 5; Opt III: BEQ 6; Opt IV: BEQ 1 NSN 4320-01-562-6245EJ (550 Follow-On) - Basic Qty: BEQ 3; Opt I: BEQ 2; Opt II: BEQ 2; Opt III: BEQ 1; Opt IV: BEQ 1 NSN 4320-01-562-6242EJ (IO Flightline Ext) - Basic Qty: BEQ 2; Opt I: BEQ 1; Opt II: BEQ 1; Opt III: N/A; Opt IV: N/A NSN 4610-01-562-6563EJ (ROWPU Water) - Basic Qty: BEQ 13; Opt I: BEQ 7; Opt II: BEQ 7; Opt III: BEQ 7; Opt IV: N/A NSN 4320-01-562-7415EJ (400 GPM Diesel Pump) - Basic Qty: BEQ 7; Opt I: BEQ 4; Opt II: BEQ 3; Opt III: BEQ 4; Opt IV: BEQ 1 NSN 4320-01-562-6564EJ (125 GPM Pump) - Basic Qty: BEQ 7; Opt I: BEQ 4; Opt II: BEQ 4: Opt III: BEQ 4; Opt IV: N/A NSN 4320-01-562-3856EJ (Dual Pumping Station) - Basic Qty: BEQ 3; Opt I: BEQ 2; Opt II: BEQ 1; Opt III: BEQ 1; Opt IV: BEQ 1 NSN 4610-01-565-5686EJ (1500 ROWPU) - Basic Qty: BEQ 34; Opt I: BEQ 17; Opt II: BEQ 17; Opt III: BEQ 16; Opt IV: BEQ 1 MRSP KITS NSN 4320-01-562-3858EJ (Source Run - MRSP) - Basic Qty: BEQ 2; Opt I: BEQ 1; Opt II: BEQ 1; Opt III: BEQ 1; Opt IV: N/A NSN 4320-01-562-6244EJ (550 Initial - MRSP) - Basic Qty: BEQ 30; Opt I: BEQ 15; Opt II: BEQ 13; Opt III: BEQ 14; Opt IV: BEQ 1 NSN 4320-01-562-6245EJ (550 Follow-On MRSP) - Basic Qty: BEQ 24; Opt I: BEQ 12; Opt II: BEQ 11; Opt III: BEQ 12; Opt IV: BEQ 1 NSN 4320-01-562-6242EJ (IO Flightline Extension - MRSP) - Basic Qty: BEQ 2; Opt I: BEQ 1; Opt II: BEQ 1; Opt III: BEQ 1; Opt IV: N/A NSN 4610-01-562-6563EJ (ROWPU - MRSP) Basic Qty: BEQ 30: Opt I: BEQ 15; Opt II: BEQ 15; Opt III: BEQ 5; Opt IV: N/A Initial Spares NSN 4320-01-562-3858EJ (Source Run - Initial Spares) - Basic Qty: BEQ 8; Opt I: BEQ 3; Opt II: BEQ 2; Opt III: 3; Opt IV: BEQ 1 NSN 4320-01-562-6244EJ (550 Initial - Initial Spares) - Basic Qty: BEQ 36; Opt I: BEQ 18; Opt II: BEQ 17; Opt III: BEQ 18; Opt IV: BEQ 1 NSN 4320-01-562-6245EJ (550 Follow-On - Initial Spares) - Basic Qty: BEQ 32; Opt I: BEQ 15; Opt II: BEQ 14; Opt III: BEQ 15; Opt IV: BEQ 1 NSN 4320-01-562-6242EJ (IO Flightline Extension - Initial Spares) - Basic Qty: BEQ 8; Opt I: BEQ 3; Opt II: BEQ 2; Opt III: BEQ 3; Opt IV: BEQ 1 NSN 4610-01-562-6563EJ (ROWPU Water - Initial Spares) - Basic Qty: BEQ 37: Opt I: BEQ 18; Opt II: 17; Opt III: BEQ 18; Opt IV: BEQ 1 There is no minimum or maximum order amount established. FAR Part 15 procedures will be utilized w/ first article testing required. Multiple USAF shipping locations are involved. Delivery schedule: 180 Days ARO Offerors shall prepare their proposals in accordance with the mandatory, explicit, and detailed instructions contained in the RFP. The Government will utilize the Technically-Acceptable Performance Price Trade-Off (TA-PPT) procedures, and will evaluate proposals and make award in accordance with the Evaluation Basis for Award provision in the RFP. It is anticipated that the RFP will be released on or around 22 April 2009 and anticipated award on or before 14 September 2009. Electronic procedures will be used for this solicitation. To request a copy of this solicitation, go to http://www.fedbizopps.gov. All responsible sources may submit a proposal which shall be considered by the agency. Note: This is a total small business set-aside. In Accordance With AFFARS 5305.204, prospective offerors are advised that foreign participation is not permitted at the prime contractor level. IAW IG5305.207(c)(91)(3) Note F: This acquisition may/does involve technology that has a military or space application. The only US contractors who may participate are those that are certified and registered with DLSC (1-800-352-3572) and have a legitimate business purpose. US contractors must submit a copy of their current, approved DD Form 2345 with their request for solicitation. The form, including instructions for completing the form, is available at http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html . The solicitation/data package will be mailed to the data custodian identified in block 3 of the DD Form 2345. The extent of foreign participation has not yet been determined. MOU country sources must contact the Contracting Officer within 15 calendar days of the date of this synopsis notice to receive a copy of the solicitation at the time it is initially issued. Issuance of the RFP will not be delayed to review requests from MOU country sources received after 15 days or from non-MOU country sources. Nothing in this notice contradicts other restrictions, identified in the synopsis notice or solicitation, regarding eligible sources (e.g., if this is a small-business set-aside, foreign sources may not participate as potential prime contractors but could, if otherwise eligible, participate as subcontractors).

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS