Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Texas was posted on July 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bearings and Long-Life Mechanical Components Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract calls for the supply of industrial bearings and rotating components engineered to achieve a minimum L10 life of 876,000 hours under continuous 24/7 operation in high-torque environments, necessitating exceptional durability and reliability. These components must sustain full operational loads without failure over a projected 100-year lifespan, demanding advanced materials, precision manufacturing, and rigorous quality control to meet exceptionally high performance standards. The requirement applies to applications where downtime is not feasible and operational continuity is critical. Subcontractors must respond to this solicitation by July 30, 2026, with all deliverables intended for performance under the North Texas Municipal Water District, though specific location details are not provided. The NAICS code 332996 indicates this relates to other fabricated metal product manufacturing, and the opportunity is open to qualified vendors capable of meeting the extreme endurance criteria without specified set-asides or eligibility restrictions. Interested parties can access further details via the provided Bonfire portal link.

General Info

Supply industrial bearings with 876,000-hour L10 life for 100-year continuous operation under high torque.

Agency

North Texas Municipal Water DistrictView Agency

NAICS

332996 - Fabricated Pipe and Pipe Fitting ManufacturingView NAICS

Place of Performance

TX, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-165-B.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

SPIRAL TYPE CLARIFIER DRIVE

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Texas Municipal Water District
ContactsNo contacts available
OfficeN/A
Organization / Agency
North Texas Municipal Water District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of industrial bearings and rotating components with minimum L10 life of 876,000 hours (100 years) under continuous 24/7 operation in high-torque applications.

More opportunities from North Texas Municipal Water District

Same awarding agency

NAICS: 237110
SLED
WYLIE WTP COMPLEX VALVE IMPROVEMENTS
Solicitation # 26-184-CSP
The North Texas Municipal Water District is soliciting bids for the Wylie WTP Complex Valve Improvements project, which focuses on the repair and replacement of existing valves and associated infrastructure at the Wylie Water Treatment Plant. This construction project, identified by solicitation number 26-184-CSP, has an estimated opinion of probable construction cost between 10 and 15 million dollars. Bids were posted on August 13, 2026, with a response deadline of September 24, 2026. The scope of work includes extensive site operations, traffic management in compliance with TXDOT standards, and the installation of new valves as detailed in the project's proposed plans and sections. The contractor is responsible for all site restoration, including topsoil replacement, grading to prevent storm water ponding, and the reseeding of disturbed areas within easements and rights-of-way. Technical requirements mandate adherence to various ASTM, ACI, and AISC standards for materials such as Portland cement, structural steel, and stainless steel bolts. Special requirements include the mandatory verification of underground utilities prior to excavation, the submission of laying plans 14 days in advance of utility activities, and the coordination and funding of overhead power pole relocations. Inspection and acceptance will occur at the project site, with the contractor bearing full responsibility for ensuring all work matches pre-construction lines and grades.
Water and Sewer Line and Related Structures Construction

POSTED

18 days ago

DEADLINE

in 24 days
View Details