Bella Vista Highline Water Main Repair Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bella Vista Highline Water Main Repair Project, managed by the Montecito Water District, involves the removal and replacement of two damaged water pipeline segments in Santa Barbara County, California. These segments were displaced by landslides during a January 2023 storm event. The scope of work includes replacing approximately 355 linear feet of pipeline at two specific locations along 2500 East Valley Road, installing a temporary bypass pipeline to maintain water service, and implementing slope stabilization measures such as geocells for erosion control and blowoff piping. Construction activities, including trenching, grading, and limited vegetation removal, are scheduled to occur over approximately three months between October 1, 2026, and December 29, 2026, during daytime weekday hours. The project is subject to strict environmental and regulatory compliance, as detailed in a Mitigated Negative Declaration. Key requirements include the disinfection of replaced segments and the dechlorination of testing water in accordance with Central Coast Regional Water Quality Control Board standards. Contractors must adhere to specific habitat protection protocols, including the use of temporary fencing near sensitive areas and the salvage of topsoil during excavation. Additionally, the contract mandates strict protocols for the discovery of archaeological resources and requires all personnel to undergo environmental training via a Workers Environmental Awareness Program. Access to the sites will be managed through temporary routes via Cima Del Mundo Road or neighboring private properties.

General Info

Bella Vista Highline water main repair in 93108, three-month daytime work, managed by Montecito Water District.

Agency

California → Montecito Water District

Place of Performance

2500 East Valley Road, CA, 93108

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Montecito Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Montecito Water District
Office AddressN/A
Contacts
Adam KanoldEngineering Manager/Assistant General Manager

Full Description

Show more
The project would remove and replace two damaged water pipeline segments within two ravines that were exposed and displaced by landslides during a January 2023 storm event. Construction access would utilize one or more temporary routes via Cima Del Mundo Road or neighboring private properties. Work activities would occur over an approximately three-month period during daytime weekday hours.

Similar Contracts

Same NAICS industry code

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS