Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 1, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bellota Weir Modifications Project

Closed
202503State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 16 days
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Bellota Weir Modifications Project, issued by the Stockton East Water District in California under solicitation number 202503, involves extensive infrastructure upgrades to Mormon Slough and the Old Calaveras River. The scope of work includes the complete replacement of the Bellota Weir with a 150-foot-wide slab featuring three bays with Obermeyer gates, supported by deep foundation piles and sheet piles, along with the construction of a control building and associated conduits. Additionally, the project requires the installation of a new North Bank Diversion Intake and Conveyance system, which includes a manifold, a sloped screen channel with rotating tee fish screens, and multiple 54-inch diameter steel and reinforced concrete pipelines. To improve environmental connectivity, the project mandates the construction of comprehensive fish passage features, including a 400-foot-long roughened channel fishway and a 120-foot-long gated concrete fish ladder with vertical slots and lamprey ramps. The work also includes the installation of an earthen embankment with a low-permeability core in the Old Calaveras River to serve as a fish exclusion feature. Supporting infrastructure such as permanent access roads on both banks of Mormon Slough and rock slope protection will be implemented to ensure long-term maintenance and stability. Responses for this solicitation are due by June 12, 2025.

General Info

Stockton East Water District weir modifications and fish passage project due June 12, 2025.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Stockton East Water District
Contacts1 person available
OfficeN/A

Full Description

Show more
The Project includes but is not limited to the following Work:1. Bellota Weir Replacementa. Remove the existing weir, fish ladders, and riprap.b. Install a 150-foot-wide slab with three 50-foot-wide bays with Obermeyer gates across Mormon Slough. Each bay will be separated by pier walls. Install deep foundation pile and sheet piles underneath and adjacent to the weir slab.c. Construct associated conduits and control building.2. North Bank Diversion Intake and Conveyancea. Install a new intake structure with manifold and distribution structure on the north bank. The manifold will contain screen channel, pipes for Bellota Conveyance Pipeline, and pipes for the Old Calaveras Conveyance Pipeline.b. Install a sloped scree channel containing four cylindrical rotating tee fish screens and floating debris barrier. Twoscreen sizes will be installed: two 7-foot-diameter by 27.5- foot-long and two 4-foot-diameter by 18-foot-long retractable tees.c. Install the Old Calaveras Conveyance pipeline from the intake structure to the south bank under the weir sill. Thepipeline will consist of three 54-inch diameter steel pipes and include a tie-in to the exiting pipeline with a 54-inchreinforced concrete pipe.d. Install the Old Calaveras Conveyance Pipeline from the intake structure to the north into the Old Calaveras River. The pipeline will consist of two 54-inch diameter reinforced concrete pipes and an armored outlet structure.e. Install a 54-inch diameter, 550-foot-long reinforced concrete sluice pipeline on the north bank, with a rock slope protection apron at the outlet and sluice gates and sediment pump at the distribution structure and screen channel.3. Fish Passagea. Install a 150-foot wide, 400-foot long, 3 percent slope roughened channel fishway with concrete apron for year-round passage. The fishway will consist of a channel spanning crest with one main channel and an overbank area. The fishway will be lined with various layers of riverbed materials, embedded boulder weirs, and rock clusters.b. Stabilize and armor the banks along the roughened channel fishway with Class V rock riprap.c. Construct permanent gated concrete fish ladder on the north bank for dual passage during the irrigation season. The 120-foot-long fish ladder will consist of seven vertical slots with 10-foot-long pools, a 20-foot long turning pool, and two 10-foot-long downstream pools with weirs and lamprey ramps.d. Construct permanent access roads on the north an south banks of Mormon Slough for fishway and laddermaintenance.4. Old Calaveras River Fish Exclusion Featurea. Install an earthen embankment in the Old Calaveras River channel close to its divergence from the CalaverasRiver/Mormon Slough. The embankment will consist of a low-permeability core cutoff wall, an earthen embankment and rock slope protection on both side of the embankment.

More opportunities from California → Stockton East Water District

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS