Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Benicia Marina Breakwater Repairs

Closed
23-14State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 9 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Benicia Marina Breakwater Repairs project involves comprehensive structural rehabilitation of the breakwater located at the main entrance to the Benicia Marina Basin from the Carquinez Strait. The scope includes replacement of the northwest section of the breakwater wall, repair and replacement of vertical and batter concrete piles, sheet piling, timber dolphin piles, steel channel and pile caps, steel wale components, and associated hardware. The tidal gate will be modified with replacement of the steel door and cleaning and epoxy coating of the frame, while all signage will be replaced. The work must adhere to industry standards including ACI 301, ACI 318, ACI 347R, APA PS-1, and WCLIB No. 17, and all materials and workmanship must meet the highest grade for durability and performance. Substitutions for specified materials require formal approval using the Substitution Request Form and must match or exceed the original performance, dimensions, and durability. The contract operates on a Lowest Price Technically Acceptable basis, with award going to the lowest responsive and responsible bidder who meets all technical and compliance requirements. The project is under the jurisdiction of the City of Benicia, with performance occurring at the Benicia Marina, and requires full compliance with strict site-specific safety and security protocols including a certified safety program, prohibition of weapons and intoxicants, mandatory site access logs, and enforced conduct rules regarding workplace behavior and vehicle signage. Packaging and preservation standards mandate export packing suitable for damp storage, separate containerization of spare parts with full labeling, climate-controlled storage for sensitive equipment, and lubrication maintenance for moving parts. All submissions must include both hard copy and electronic versions in PDF format with chapter bookmarks, delivered via the City’s procurement portal with required certifications including DIR registration, worker’s compensation compliance, prevailing wage adherence, non-collusion, and non-disqualification. No federal entity identifiers such as UEI or CAGE codes are required, reflecting a state-level procurement process. The contract time begins 60 days after Notice of Award or as specified in the Notice to Proceed, with performance milestones tied to submittal approvals, testing, punch list resolution, and submission of as-built documentation. The City retains full authority for inspection and final acceptance at the site.

General Info

Repair Benicia Breakwater: replace wall, steel door, clean epoxy tide gate, repair piles, replace signage.

Documents

10

BCDC Permit Amendment No. 1977.005.36 for Benicia Breakwater Rehabilitation Project

PDF, High priority: read this firstamendment
High

Benicia Breakwater Rehabilitation Project Water Quality Certification Notice

PDF, High priority: read this firstpermit-notice
High

Benicia Marina Breakwater Condition Assessment Dec 2021

PDF, High priority: read this firstcondition-assessment
High

Benicia Marina Breakwater Rehabilitation Project Plans

PDF, High priority: read this firstspecifications
High

Benicia Marina Breakwater Repairs Project Manual 23-14

PDF, High priority: read this firstrfp
High

Benicia Marina Breakwater Repairs RFP

PDF, High priority: read this firstrfp
High

Benicia Marina Breakwater Repairs RFP May 2026

PDF, High priority: read this firstrfp
High

Geotechnical Investigation Report for Benicia Breakwater Repair

PDF, High priority: read this firstsow
High

Project Labor Agreement for City of Benicia FY 24/25-29/30

PDF, High priority: read this first23 pages · project-labor-agreement
High

USACE Permit SPN-2022-00286 for Benicia Marina Breakwater Project

PDF, Low prioritypermit
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jun 4, 2026 to May 26, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts2 people available
OfficeBenicia, CA, 94510, USA
Organization / AgencyCalifornia → Public Works
Office AddressBenicia, CA, 94510, USA
Contacts
Derek LinsleySenior Civil Engineer
Lindsay WestSenior Financial Analyst

Interested Companies (35)

Manson ConstructionSeattle, WA
California Engineering ContractorsPleasanton, CA
MCW Traffic ControlFrench Gulch, CA

See All 35 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Benicia Breakwater Structure is located at the main entrance channel from the Carquinez Strait to the Benicia Marina Basin. The existing breakwater is comprised of East and West sheet piling and steel cap, steel wale, concrete pile caps, concrete vertical and batter piles, dolphin piles and a tidal gate. The repair scope includes the following: Replacement of the northwest section of the breakwater wall. Replacement of the steel door at the tidal gate and cleaning/epoxy-coat of tide gate frame. Repair and replacement of select vertical and battered concrete piles, sheet pile walls, and timber dolphin piles. Repair of steel channel and concrete pile caps, replacement of portions of steel wale and associated hardware. Replacement of signage.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT
Solicitation # IFB No. PW-0332
The HSIP Cycle 11 and 12 Unsignalized Crossing Improvement Project, managed by the City of Santa Cruz Public Works Department, involves comprehensive roadway and pedestrian safety enhancements across five specific locations. The scope of work includes the installation of concrete curbs, gutters, curb ramps, roadway signs, pedestrian activated beacons, and thermoplastic striping and pavement markings. Work must be performed in accordance with the 2025 State of California Department of Transportation Standard Specifications, City Standard Specifications, and ADA standards. The project is divided into Cycle 11, covering Laurel Street at Blackburn Street, Broadway at Pennsylvania Avenue, and Seabright Avenue at Logan Street, and Cycle 12, covering High Street at Cardiff Place and Soquel Avenue at Poplar Avenue. This solicitation is an Invitation for Bids with a response deadline of November 5, 2026. The contract will be awarded to the lowest responsible and licensed bidder based on the City's estimated quantities of work. The successful contractor must complete the project within 50 working days and provide Faithful Performance and Labor and Material bonds each equal to 100 percent of the contract price within 10 calendar days of the award. Key administrative requirements include compliance with Department of Industrial Relations prevailing wage laws, the submission of a DIR Compliance Affidavit, and adherence to the City of Santa Cruz Quality Assurance Program. Payment terms include a 10 percent retention on the estimated value of work performed and a 20 percent retention on unused materials delivered.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 562111
New
SLED
Request for Proposals for Services Related to the City of Tustin's Solid Waste Management Franchise Agreement
Solicitation # Requests for Proposals
The City of Tustin is seeking proposals for an exclusive ten-year Solid Waste Management Franchise Agreement to provide collection services for garbage, recyclable materials, organic waste, and construction and demolition debris. The selected contractor will be responsible for the collection, transportation, and delivery of materials to city-approved facilities, ensuring strict compliance with flow-control requirements and state mandates, including SB 1383 for organic waste diversion. The contract requires the contractor to provide specific color-coded and labeled containers, with new carts manufactured from at least twenty percent recycled material. Performance is monitored through strict reliability and quality standards, including a requirement to commence new customer service within seven business days. Proposals are evaluated on a 100-point scale based on service rates, financial ability, qualifications, and customer service reliability, though the city is not obligated to select the lowest bidder. Financial requirements include a one million dollar performance bond, a twenty-five thousand dollar security check, and proof of assets covering start-up and three months of operating costs. The agreement includes a structured pricing model for residential, multi-family, and commercial services, alongside specific fees for solicitation and annual administration. Awardees must adhere to ADA compliance for on-premises collection and maintain rigorous safety and regulatory standards as overseen by the Director of Public Works.
Solid Waste Collection

POSTED

6 days ago

DEADLINE

in 3 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS