Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on October 15, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Berm Restoration North of Ponce de Leon Inlet USACE 2024 Ponce Inlet and ICWW Maintenance Dredging Material Beneficial Use

Closed
25-B-06IFState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 9 hours ago

DEADLINE

in 5 days

AI Contract Overview

Show more

This contract involves a beach restoration project in Volusia County, Florida, aimed at repairing damage caused by Hurricanes Ian and Nicole. The project is a collaborative effort between the Volusia County Coastal Division and the US Army Corps of Engineers, utilizing dredged sand from USACE's channel and inlet maintenance dredging to restore a section of beachfront dunes. The selected contractor will be responsible for tasks including loading, hauling, placing, and grading between 480,000 and 900,000 cubic yards of dredge spoil stockpiled on the beach. Additional project activities encompass removing existing erosion control materials, conducting on-beach surveying, environmental monitoring, and planting beach vegetation. The project's success hinges on the contractor’s ability to operate effectively under dynamic conditions influenced by surf, weather, and tides. The solicitation, posted on October 15, 2024, with a deadline for responses on November 21, 2024, is managed by the Volusia Coastal Department under the NAICS code 237990, which pertains to other heavy and civil engineering construction. The project budget ranges from 15 to 30 million dollars. Interested parties can contact Inga Fegley via email or phone for further details and access additional project information through the provided online portal.

General Info

Agency

Florida → Volusia Coastal Department

Place of Performance

FL, USA

Set-Aside

NONE

Documents

12

25-B-06IF - Berm Restoration North of Ponce de Leon Inlet

PDF, High priority: read this firstifb
High

25-B-06IF Berm Restoration North of Ponce de Leon Inlet

PDF, High priority: read this firstifb
High

25-B-06IF Exhibit G - Bid Price Sheet

XLSX, High priority: read this firstspecifications
High

Berm Restoration North of Ponce de Leon Inlet - Technical Specifications

PDF, High priority: read this firstspecifications
High

Contract C-2006: Berm Restoration North of Ponce de Leon Inlet

PDF, High priority: read this firstcontract-document
High

Exhibit H - Federal Contract Provisions (25-B-06IF)

PDF, High priority: read this firstspecifications
High

Exhibit I - Sales Tax Exemption Procedures (25-B-06IF)

PDF, High priority: read this firstspecifications
High

Exhibit K - Special Conditions

PDF, High priority: read this firstspecifications
High

ITB 25-B-06IF Exhibit B - Prime/Subcontractor Form

XLS, High priority: read this firstspecifications
High

VOCTY.M001.DAYTONA_007 - Berman Restoration Construction Drawings

PDF, High priority: read this firstspecifications
High

C2006 - Payment and Performance Bond

PDF, Low prioritybond-form
Low

Exhibit C - Insurance Requirements Placeholder

PDF, Low priorityspecifications
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Volusia Coastal Department
Contacts1 person available
OfficeN/A
Organization / Agency
Florida → Volusia Coastal Department
Office AddressN/A

Full Description

Show more
As part of the recovery efforts from the impacts of Hurricanes Ian and Nicole the Volusia County Coastal Division (County) has coordinated with the US Army Corps of Engineers (USACE) to reuse the sand dredged during the USACE's channel and inlet dredging project to restore a section of beachfront dunes. The selected contractor will be responsible for loading, hauling, placing and grading between 480,000 and 900,000 cubic yards of dredge spoil stockpiled on the beach by an USACE contractor. Other project components include existing erosion control material removal, on-beach surveying, environmental monitoring and beach vegetation planting. The success of this project will be determined by the contractor's ability to work on the beach during constantly changing conditions caused by surf, weather and tides.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS