Berry Summit Bioswale Rehabilitation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Berry Summit Bioswale Rehabilitation project, managed by Caltrans District 1 in Eureka, involves the rehabilitation of stormwater treatment best management practices along Route 299 in Humboldt County, California. The scope of work includes modifying existing drainage inlets, grading, and revegetating biofiltration strips and swale areas. Additionally, rock slope protection will be installed within the biofiltration swales to provide necessary grade controls. These efforts are designed to prevent flooding and erosion while ensuring the effective filtration and treatment of stormwater for the benefit of the general public and receiving waters. This project is categorized as a forecast with a posted date of October 1, 2026. According to the Notice of Exemption signed by Senior Environmental Scientist James McIntosh, the project qualifies for a Categorical Exemption under Class 1, CCR title 14, section 15301, as it pertains to the maintenance of existing facilities. The primary objective is to restore the functionality of the bioswale system to maintain environmental safety and infrastructure integrity.

General Info

Agency

California → Caltrans, District 1 - Eureka

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 1 - Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 1 - Eureka
Office AddressN/A
Contacts
James McIntoshSenior Environmental Scientist

Full Description

Show more
Caltrans proposes a project that includes modifying existing drainage inlets, grading, and revegetating biofiltrations strip and swale areas at specific locations. Rock Slope Protection would be installed within biofiltration swale for grade controls. The purpose of the project is to rehabilitate stormwater treatment BMPs which are needed to prevent flooding and erosion and ensure effective filtration and treatment of stormwater. Caltrans, the general public, and receiving waters are the beneficiaries of this project.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional system. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes, concrete structures, and fabricated pipe and fittings. Additional requirements include traffic control, SWPPP implementation, construction surveys, and preconstruction video services. Norstar Plumbing and Engineering, Inc. is acting as the prime contractor and is actively seeking certified DBE, MBE, SBE, and WBE subcontractors and suppliers to support various specialty trades. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications for the project are available through the Inland Empire Utilities Agency bidding portal. Primary points of contact for this solicitation are Nathan Plummer and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 13 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves critical infrastructure work for the City of Belmont in North Carolina. The scope of work includes the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key station improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and ancillary site improvements such as stormwater facilities, fencing, and a generator. The estimated project value is 16,690,000 dollars. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a performance period of 560 calendar days following the Notice to Proceed. Bidders must meet specific socioeconomic goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Required submittals include a signed bid form, bid bond, and evidence of authority to sign. The successful contractor must provide performance and payment bonds per EJCDC standards and proof of insurance. Payments are processed monthly via applications for payment submitted to the engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 13 hours ago

DEADLINE

in 17 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the use of FRP reinforcing systems. Technical requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additional tasks encompass the rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. All subcontractors are strictly required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with Garney reimbursing the bond premium. Quotes, which must include the subcontractor's bond rate and any redlines to standard subcontract forms, are due by November 17, 2026, at 2:00 PM PT, ahead of the November 18, 2026, bid date. Requested supplies and services specifically include lead abatement, rebar, metals fabrication, painting and coatings, electrical and instrumentation, trucking and hauling, and access hatches.
Garney Pacific, Inc.

POSTED

about 13 hours ago

DEADLINE

in 25 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS