Bethel Church of Redding Collyer Drive Campus Planned Development (PD-2015-00304)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has authorized Bethel Church, represented by Jon Cook, to proceed with the extension of a 16-inch diameter water line along Twin Tower Drive in Redding under Lake and Streambed Alteration Agreement EPIMS SHA-65556-R1. The project will run 2,055 feet from the existing water main at Hollow Lane and Twin Tower Drive to a connection near Hendrika Way, crossing two intermittent streams via trenching. A 1,600-foot gravel access road will be constructed in three sections, and a 12-foot-wide rock slope protection corridor will be installed where the water line intersects the streams, matching their existing grade. Approximately 15 trees will be removed, and incidental vegetation trimming may occur to facilitate access. Permanent impacts to the streams are limited to 0.021 acres across 24 feet of stream length, mitigated through the purchase of credits from the Stillwater Plains Mitigation Bank. Temporary impacts of up to 0.014 acres across eight feet of stream length are anticipated during construction and will be offset by on-site revegetation using a native plant seed palette.

General Info

Bethel Church to extend 16-inch water line, cross two streams, remove 15 trees, mitigate impacts via mitigation bank and native revegetation.

Agency

California → City of Redding

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Redding, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Twin Tower Water Line Project EPIMS-SHA-65556-R1

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Redding
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Redding
Office AddressN/A
Contacts
Dyana JudnickEnvironmental Scientist
Amber KelleyEnvironmental Compliance Manager

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS SHA-65556-R1, pursuant to Fish and Game Code section 1602 to Bethel Church as represented by Jon Cook. The Project is limited to the extension of a water line along Twin Tower Drive in Redding. Beginning at the existing water main at the intersection of Hollow Lane and Twin Tower Drive, the 16-inch diameter water line would run in a northerly direction for 2,055 feet until it ties into the water main near Hendrika Way. The water line will intersect two intermittent streams, and will be trenched through the streams to connect to the water main. Additionally, a gravel access road would be installed in three sections totaling 1,600 feet in length. A 12-foot-wide corridor of rock slope protection (RSP) would be installed where the water line crosses two intermittent streams. The RSP would match the existing grade of these streams. Approximately 15 trees will be removed to accommodate project-related activities. Incidental vegetation trimming could occur to provide access. As part of the proposed mitigation, revegetation will occur to mitigate the impacts to riparian vegetation. Installation of the RSP would result in 0.021 acres (906 square feet across 24 feet of stream length) of permanent impacts to intermittent streams in the Project area. Mitigation credits have been purchased from Stillwater Plains Mitigation Bank to mitigate for the permanent impacts to the streams. Additionally, up to 0.014 acres (~610 square feet across eight feet of stream length) of the intermittent streams could be temporarily impacted during construction. To mitigate for temporary impacts revegetation will occur on site with a native seed palette.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 project, managed by Carl Belt, Inc., focuses on upgrading aging infrastructure in Maryland to ensure compliance with nitrogen and phosphorous limits and NPDES thermal requirements. The scope of work includes the replacement of influent screens, washer compactors, in-plant pumps, and RAS pumps, as well as the addition of a WAS pump to Final Clarifier No. 1. Key structural and technical improvements involve installing a building to enclose the headworks, constructing a dedicated building for a new ferric chloride/alum chemical storage tank, and replacing motor control centers, PLCs, and switchgear to enhance plant reliability and resiliency. Additional work includes repairing concrete at the headworks and performing miscellaneous building improvements to HVAC systems, roofing, and doors. This wage-rated solicitation is open to a wide range of socioeconomic categories, including small, disadvantaged, women-owned, and veteran-owned businesses, with a specific emphasis on recruiting MBE, DBE, and WBE subcontractors and suppliers for electrical, mechanical, masonry, and pump-related services. Bids must be submitted by August 17, 2026, at 4:00 PM to the Cumberland, Maryland office or via the designated online portal. Detailed plans and specifications are available through the company website, and the primary administrative contact for the project is Jared Burkett.
Carl Belt, Inc.

POSTED

about 12 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida, on behalf of the Central Florida Water Cooperative. The estimated project value is 270 million dollars. The scope of work is extensive, encompassing the construction of raw water production wells with associated well heads and pumps, discharge piping, surge bladder tanks, and site civil works. Additional requirements include the construction of an electrical building, standby generator, wellhead cages, and specialized facilities such as Operations and Reverse Osmosis buildings, a pretreatment chemical building, a post-treatment chemical building, a post-treatment degasification system, and an odor control air exhaust dispersion stack system. The project also requires primary and secondary water quality analytical laboratory testing and production well disinfection to achieve regulatory certification. Proposals must be submitted via email to Nichole Voitel. The submission process requires the proposed scope of work to be delivered at least 24 hours before the bid date, with firm pricing due by 10:00 AM on the day of the bid. The final bid deadline is August 19, 2026, at 2:00 PM EST. Bidding documents, including plans, specifications, and addenda, are available for free download through ConstructConnect. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

about 12 hours ago

DEADLINE

in 5 days
View Details