Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on January 1, 1970. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bexar County — CSJ 0073-02-092 — May 2026 Letting — State-Let Construction

Closed
0073-02-092State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 6 hours ago

DEADLINE

in about 20 hours
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 6 hours ago

DEADLINE

in about 20 hours

AI Contract Overview

Show more

Bexar County CSJ 0073-02-092 is a state-let construction solicitation issued by the Texas Department of Transportation for sanitary sewer infrastructure work scheduled for a May 2026 letting. The project involves the installation of sanitary sewer mains, force mains, fire hydrant assemblies, concrete encasements, and bypass pumping systems in accordance with project plans and Special Specification 7041, all within the right-of-way of a Federal-aid highway. Work must comply with multiple industry standards including ASTM, AWWA, ANSI, and applicable federal and Texas state regulations such as 23 CFR and 43 TAC, with strict adherence to Buy America requirements for materials. The scope includes rigorous inspection protocols requiring compliance with standards like ASTM D3350, ASTM F1055, and AWWA M55, along with hydrostatic testing at 1,600 psi HDS and adherence to SAWS Approved Products List. Contractors are responsible for conducting site inspections, notifying authorities prior to critical procedures, and ensuring environmental protection against UV damage to materials, particularly PVC C-909 pipe, which must be bundled on pallets and free of degradation. Contractors must satisfy workforce and compliance requirements including performing at least 30% of the work with their own employees, paying prevailing wages under the Davis-Bacon Act, submitting certified payrolls via Form WH-347, and maintaining records for three years. Affirmative outreach to minorities and women is required if union referrals are insufficient, and the Disadvantaged Business Enterprise program under 49 CFR Part 26 applies to subcontracting. Additional special provisions mandate attendance at a mandatory ADA curb ramp workshop by supervisory staff, compliance with the Cargo Preference Act requiring at least 50% of ocean freight on U.S.-flag vessels, and inclusion of special clauses in all subcontracts. Offerors must be registered in SAM.gov, hold a valid UEI and CAGE Code, and certify absence of debarment or suspension. While no formal contract value is provided, pricing is based on unit bids for line items such as pipe, fittings, and installations with estimated and final quantities subject to adjustment. No specific payment office, invoicing platform, or point of contact details are included, and no clause, attachment, or evaluation factor sections are structured in conventional FAR format, indicating reliance on Texas DOT-specific procurement procedures rather than federal contract clause templates.

General Info

Bexar County sanitary sewer project with Buy America compliance, prevailing wages, and strict material and inspection standards for May 2026 letting.

Documents

2

Control 0073-02-092: Surfacing/Roadway Restoration - Bexar County

PDF, High priority: read this firstrfb
High

CSJ 0073-02-092: SS 536 Highway Improvement

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Department of Transportation
ContactsNo contacts available
OfficeTX, USA
Office AddressTX, USA
ContactsNo contact information available

Full Description

Show more
Bexar County — CSJ 0073-02-092 — May 2026 Letting — State-Let Construction

More opportunities from Texas Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
BRIDGE REPAIR
Solicitation # 6510-75-001
Solicitation 6510-75-001 is a contract issued by the Texas Department of Transportation for callout bridge structure repair on IH 20 and other roadways within Ector, Crane, Ward, Loving, Winkler, Midland, Stanton, Andrews, and Upton Counties. The scope of work involves non-site-specific repairs, including concrete structure and beam repairs utilizing carbon fiber reinforced polymer and strand splicing. The project is to be completed within 365 calendar days, with work executed via individual emergency or routine work orders issued by the Engineer. The contract is awarded to the lowest bidder, provided the bid is not mathematically unbalanced and the bidder complies with DHS E-Verify and other state and federal certifications, including nondiscrimination laws under 49 CFR 21 and various Texas Government Code boycott and discrimination prohibitions. Technical requirements mandate adherence to the September 1, 2024, Standard Specifications for Construction of Highways, Streets and Bridges and the Texas Manual on Uniform Traffic Control Devices. Specific quality standards include AWS D1.1, D1.5, and ANSI/AWS D1.3 for welding, and AASHTO LRFD specifications for steel bridge fabrication. All work is subject to inspection by Maintenance Supervisors, with payment requests certified by the Odessa Maintenance Office. Safety protocols require personnel to wear ANSI 107-2004 Class 2 or 3 high-visibility apparel. Compensation includes mobilization paid per county, while specific repair costs are negotiated and agreed upon prior to the commencement of work.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 22 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS