This Solicitation opportunity from Oklahoma was posted on December 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BF Switches - FY2026
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Western Technology Center is seeking proposals for a comprehensive network switch upgrade at its Burns Flat campus, covering the core, distribution, and access layers. The project requires a stacked core configuration in Rack 1 consisting of three 48-port multi-gig switches and one 24-port fiber switch, all featuring 10Gbps stacking and redundant hot-swappable power supplies. The distribution layer in Rack 2 requires one 48-port PoE+ switch and two smaller multi-gig switches with 10Gbps uplinks and support for a legacy 100Mbps fiber connection. The access layer consists of nineteen 48-port and six 24-port PoE+ switches distributed across various locations. All hardware must support L3 routing, full local management via CLI and browser, and a wide array of standard networking protocols. Equipment must include PoE+ and some PoE++ capabilities, along with a lifetime warranty and no recurring licensing fees. Bidders must be USAC registered with a valid SPIN and comply with FCC LCP rules to avoid disqualification. Proposals must be specific to the requested services, including switches, cabling, and maintenance, with a final submission deadline of January 9, 2026.
General Info
Place of Performance
Set-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- Supply of Infineon Power Transistors (NSN 5961-01-690-9206)Open now, due in 13 days
- Electrical Component SupplyOpen now, due in 21 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
Core (Rack 1):
3 x 48-port switches (multi-gig capable; at least one with full PoE+ and some PoE++ ports). 1 x 24-port fiber switch with 13 x 1000Base-SX multimode ports, 1 x 1000Base-LX single-mode port, and copper uplinks. All four switches must form a single stack with 10Gbps stack links. Include stacking modules and fiber transceivers etc.
Distribution (Rack 2):
1 x 48-port PoE+ switch with some multi-gig/PoE++ ports. 2 x additional switches (8 to 24 ports, multi-gig capable, PoE optional). Include fiber transceivers and patch cables (or 10gbe copper) for 10Gbps uplink to Rack 1 (approx. 12 to 15 ft). MUST ALSO INCLUDE SUPPORT FOR 1 LEGACY 100MBPS MULTIMODE FIBER CONNECTION.
Access Layer (Other Locations):
19 x 48-port PoE+ switches (some multi-gig/PoE++ ports). 6 x 24-port PoE+ switches (some multi-gig/PoE++ ports). Optional 10Gb uplink ports (up to four per switch). Include fiber transceivers per included location chart in RFP.
Fiber Transceiver Totals:
25 x 1000Base-SX multimode 2 x 1000Base-LX single-mode 1 x 100Base-FX multi-mode
General Requirements:
- Redundant hot-swappable power supplies on core switches (Rack 1) - Gigabit Ethernet ports (1000Base-T) with some multi-gig support on each switch - PoE+ on all ports; some ports with PoE++ (IEEE 802.3bt) on each switch (unless otherwise noted in RFP) - Optional 10GbE uplink ports (up to four per switch) - Full local management via CLI and browser; cloud management optional - L3 routing (static routes minimum) - Lifetime warranty and support; no recurring license required - Protocols: SSH, HTTPS, SNMPv3, IGMP snooping v3, LACP, Spanning Tree, BPDU guard, LLDP, NTP, DHCP relay, VLAN, ACL, SPAN, and RSPAN - Physical console port required
Bid Disqualification Criteria: - Must have USAC registration and SPIN - Must comply with FCC LCP rules - All costs included; non-E-Rate items listed separately - Bids must be specific to requested services; generic or laundry list bids will be disqualified - SPAM or robotic responses will be disqualified
Bid Submission Deadline: January 9, 2026
Requested services (5 line items): - Category 2 — Internal Connections — Switches And Necessary Software And Licenses - Category 2 — Internal Connections — Antennas, Connectors, And Related Components - Category 2 — Basic Maintenance Of Internal Connections — Switches - Category 2 — Internal Connections — Cabling - Category 2 — Basic Maintenance Of Internal Connections — Antennas, Connectors, And Related Components
Reference documents (Form 470 / RFP): https://publicdata.usac.org/EPC/Prd/Form470/260009455/139923/20713469-USAC_FCC_FORM_470_APPLICATION_260009455_CERTIFIED.pdf, https://publicdata.usac.org/EPC/Prd/Form470/260009455/139923/20713244-ERate_RFP_BF_Network_Switches.docx