Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on September 24, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BID 2025-17 Frank Satterfield WPCP Expansion to 3.6 MGD

Closed
PE-66243-NONST-2025-000000045State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 325180
New
DIBBS
CARTRIDGE, TONER
Solicitation # SPE7M2-27-T-0557
Solicitation SPE7M2-27-T-0557 is a request for quotations issued by the DLA Weapons Support Nuclear Reactor Program for the procurement of 500 toner cartridges, identified as commercial off the shelf items with NSN 3610-01-725-1180 and Xerox Corporation part number 006R04686. The contract is not a small business set-aside, though it utilizes a HUBZone price evaluation preference. Delivery is required within 105 days after receipt of order, with a need ship date of October 6, 2026, and an original required delivery date of June 25, 2027. Shipping is designated as FOB Origin and will be managed under the First Destination Transportation program, with the final delivery point located at the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contractor must adhere to strict packaging and marking standards, including MIL-STD-2073-1E and MIL-STD-129, and comply with DLA packaging requirements for procurement. Technical and quality standards are governed by the DLA Master List, and specific restrictions prohibit the intentional addition of mercury or the use of additive manufacturing in the production of the items. Administrative requirements include electronic invoicing via the Wide Area WorkFlow system and compliance with various FAR and DFARS clauses regarding the Buy American Act, Berry Amendment, and cybersecurity reporting for covered defense information. Inspection and acceptance will occur at the destination.
DLA WEAPONS SUPPORT NUCLEAR REACTOR PROGRAM

POSTED

about 5 hours ago

DEADLINE

in 11 days
NAICS: 325180
New
SLED
SUPPLY CONTRACT FOR THE PURCHASE AND DELIVERY OF WATER CLARIFICATION CHEMICAL
Solicitation # 11-26-SP01-129
The McAllen Public Utility is soliciting electronic bids for a supply contract for the purchase and delivery of water clarification chemicals to serve its North and South Water Plants. The utility requires approximately 4,000,000 pounds of coagulant annually, specifically an Aluminum Sulfate/Polymer blend or an equivalent that is EPA sanctioned and NSF approved. The contract will be awarded to the lowest responsive responsible bidder, though the City may consider best value based on product performance and cost per pound. Key performance requirements include the ability to treat river water turbidity variations of 5-200 NTUs while maintaining specific effluent turbidity and pH levels, as well as the capacity to reduce Total Organic Carbons within state limits. The initial contract term is two years, with the City reserving the right to extend the agreement for up to two additional one-year increments and a final interim extension of up to six months. Bidders must undergo mandatory product pre-qualification via jar testing by January 15, 2027, and provide a users list from other Texas municipalities to prove effectiveness. Deliveries are FOB Destination to the Northwest and Southwest Water Plants, with bulk shipments of 500 to 4,500 gallons required within two calendar days of an order. Additionally, the vendor must provide technical support with emergency response times within 24 hours. All bids must be submitted electronically through the City of McAllen bidding portal by January 21, 2027, at 3:00 p.m. CST. Required documentation includes a signed bid form, a notarized Non-Collusion Affidavit, a Non-Resident Bidder form, and a Conflict of Interest Questionnaire. Successful contractors must provide a Certificate of Insurance and adhere to all federal and state safety and non-discrimination laws. Invoicing must occur within three days of delivery and include the purchase order number and department details, with payments executed by mail per Texas Government Code.
City of McAllen

POSTED

1 day ago

DEADLINE

in 3 months

AI Contract Overview

Show more

The contract pertains to the construction and expansion of the Frank Satterfield Water Pollution Control Plant (WPCP) in Perry, Georgia, increasing its capacity to 3.6 million gallons per day. Bids for this project are due by October 31, 2024, with the work to be awarded following a sealed bid process. The scope includes comprehensive installation and upgrades such as adding a cover to the screenings conveyor, installing a lime pump, setting up a chemical phosphorus removal system, expanding filtration capacity with additional disks, constructing a UV disinfection basin, converting an existing chlorine contact basin into a post aeration basin, extending the outfall, and updating the SCADA system. The contractor is responsible for providing all necessary materials, labor, and equipment, with a project timeline of 390 days for substantial completion and 450 days for final completion from the Notice to Proceed. Coordination with the City of Perry and other utility providers within the project corridor is required, and the project will be managed by GWES, LLC. The contract value is estimated between five and ten million dollars. The project emphasizes safety, permitting, and environmental controls, and requires the contractor to ensure timely execution while adhering to all specified requirements. The primary contact for inquiries is Joni Ary, reachable via email or phone, and the project is part of a broader effort to enhance wastewater treatment infrastructure in Perry, Georgia.

General Info

Agency

Georgia → City of Perry

Place of Performance

GA, USA

Set-Aside

NONE

Documents

1

Bid 2025-17: Frank Satterfield WPCP Expansion

PDF, High priority: read this firstitb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Solicitation number changed from 66243 PERRY, PE-66243-NONST-2025-000000045 to PE-66243-NONST-2025-000000045.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Perry
Contacts1 person available
OfficeN/A
Organization / Agency
Georgia → City of Perry
Office AddressN/A

Full Description

Show more
PART 1: GENERAL 1.1 Competitive Cost Sealed Bids Separate sealed Bids for construction of Frank Satterfield WPCP Expansion to 3.6 MGD for the City of Perry (Bid Number 2025-17) will be received until Thursday, October 31, 2024 at 2:00 PM in Perry City Hall, 1211 Washington Street, Perry, GA 31069. Bids will then be publicly opened and read aloud at said office. Any bid received after Thursday, October 31, 2024 at 2:00 PM will not be considered by the Owner. Following the closing time for the receipt of bids, no bid may be withdrawn for a period of sixty (60) days. 1.2 Scope of Work The work to be performed and provided under this Contract shall consist of furnishing all labor, materials, tools, equipment, safety equipment, permitting, erosion and sedimentation control measures, taxes, profit, overhead, testing, startup, and other costs and effort required to complete the following: Installation of a cover on the screenings conveyor Installation of a lime pump Installation of a tank and skid system for chemical phosphorus removal Installation of four additional disks to each of the two filters Installation of UV disinfection basin Converting the existing chlorine contact basin into a post aeration basin with surface aerators. Extension of the existing outfall Updates to the SCADA system All other materials will be provided by the Contractor. The time allotted for substantial completion of the work is 390 consecutive calendar days from the Notice to Proceed, and the time allotted for final completion of work is 450 consecutive calendar days from the Notice to Proceed. Contractor will be required to coordinate all work with the City of Perry and other utility owners who have facilities within the project corridor. The project will be managed by GWES, LLC., located at 733 Carroll Street, Perry, GA 31069, telephone number +1 (555) 000-0000.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS