This Solicitation opportunity from Pennsylvania was posted on April 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Montgomery County Community College is soliciting sealed proposals for the Montco Cultural Center Theater Roof Replacement Project (Bid #9 – FY25/26) in Blue Bell, Pennsylvania. The project involves the removal of an existing standing seam metal roof and the installation of a new insulated standing seam metal roof system covering approximately 13,000 square feet. Additional scope includes the installation of new sheet metal work, replacement of roof drains, painting of a 1,700 square foot screen wall, and the installation of 250 square feet of TPO roofing on a low slope area. Contractors are required to perform comprehensive interior cleanup of the auditorium and must adhere to strict safety and structural guidelines, including a prohibition on operating roll former machines on the roof.
Bids must be submitted via PennBid by 12 p.m. EDT on April 21, 2026, and require a mandatory pre-bid conference and site tour held on April 10, 2026. Submission requirements include a bid security deposit of 10 percent of the bid, a Non-Collusion Affidavit, an Owner’s Certification of Responsible Contractor Status, and contractor resumes and references. The project is subject to the Pennsylvania Prevailing Wage Law and the Public Works Employment Verification Act. Upon the notice of intent to award, the selected contractor must provide performance and payment bonds each totaling 100 percent of the contract sum.
General Info
Roof replacement project for Montco Cultural Center Theater in Blue Bell, Pennsylvania.
HighAI Summary for Addendum II Montco Cultural Center Theater Roof Replacement: This document is Addendum II for the Montco Cultural Center Theater Roof Replacement project, providing detailed summary and specifications for the roofing work. It includes project information, scope of work covering steep sloped and low sloped roof replacements, contractor responsibilities, site access, and coordination requirements. The addendum outlines contractor obligations such as OSHA compliance, site cleanup, material provisions, and warranty requirements. It also specifies the type of contract as a single prime contract and details logistical and operational constraints on site use. The document serves as a critical update to the contract documents, ensuring clarity on work coverage and execution.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum II Montco Cultural Center Theater Roof Replacement: This document is Addendum II dated April 16, 2026, for the Montco Cultural Center Theater Roof Replacement project. It serves as an amendment to the original bid documents, clarifying and modifying the fabrication and installation requirements for the standing seam metal roofing system. Specifically, it prohibits the placement, operation, or storage of the roll former machine on the roof due to safety and structural concerns. Bidders must plan fabrication off the roof with no additional compensation or time extensions allowed for compliance. All other contract terms remain unchanged.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Addendum II Montco Cultural Center Theater Roof Replacement Prevailing Wages: This document is Addendum II for the Montco Cultural Center Theater Roof Replacement project, detailing prevailing wage rates for various labor classifications. It includes hourly rates, fringe benefits, and total compensation effective as of various dates, primarily in 2024 and 2025. The project is located in Montgomery County, PA, awarded by Montgomery County Community College, with a contract award date of 5/12/2026. The wage determination covers classifications such as asbestos workers, boilermakers, carpenters, electricians, laborers, and others relevant to building construction. The document is issued by the Bureau of Labor Law Compliance and is critical for compliance with labor standards on this construction project.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum I Montco Cultural Center Theater Roof Replacement: This document is Addendum I for the Montco Cultural Center Theater Roof Replacement project. It includes Exhibit F, which is a Contractor Reference Form requiring the submission of up to three references with details such as reference name, organization, project name, construction cost, year completed, phone number, and email address. Resumes are also to be attached, limited to 2 pages maximum. The addendum serves to provide additional submission requirements for contractors.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum I Montco Cultural Center Theater Roof Replacement: This document is Addendum I for the Montco Cultural Center Theater Roof Replacement project. It includes Exhibit E, which is a Subcontractor Disclosure Form requiring subcontractors to provide their company name, address, and project task along with attached resumes (maximum 2 pages). The addendum serves to update or clarify subcontractor information requirements for the solicitation.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for ADDENDUM I Montco Cultural Center Theater Roof Replacement: This document is Addendum I dated April 13, 2026, for the Montco Cultural Center Theater Roof Replacement project. It serves as an amendment to the original bid documents, incorporating supplementary data that takes precedence over previous provisions. Key modifications include a scheduled site visit on April 14, 2026, and requirements for comprehensive interior cleanup of the auditorium after roofing activities, ensuring restoration to pre-construction conditions with removal of dust, debris, and fireproofing materials.
PDF
PDF, High priority: read this firstbid-bond-form
HighAI Summary for Exhibit A - Bid Bond Form for Montco Cultural Center Theater Roof Replacement: This document is Exhibit A, the Bid Bond Form, for the Montco Cultural Center Theater Roof Replacement project at Montgomery County Community College. It outlines the bid security requirements, specifying that the bid must be accompanied by a bid bond executed by the Principal and Surety. The bond guarantees that if the Principal's bid is accepted, they will enter into a contract and provide performance bonds and insurance as required. Failure to do so will result in the Surety paying the difference between the accepted bid and any higher contract amount, plus related costs. The form includes spaces for signatures and attestations for individuals, partnerships, corporations, and limited liability companies, along with requirements for corporate seals and powers of attorney.
PDF
PDF, High priority: read this firstbid-bond-form
HighAI Summary for Exhibit A - Bid Bond Form Montco Cultural Center Theater Roof Replacement: This document is Exhibit A - Bid Bond Form related to the Montco Cultural Center Theater Roof Replacement Project. It includes detailed bid pricing from multiple contractors for labor, materials, equipment, and services necessary to complete the project. The form lists base bid pricing, allowances for metal deck replacement, fireproofing repair, wood blocking replacement, and unit prices for additional work. The document compares total costs and unit prices from four contractors: D.A. Not, Inc., Eastern Roofing Systems Inc., Munn Roofing Corp, and Union Roofing Contractors, Inc. It serves as a critical component for evaluating bids and ensuring compliance with project specifications.
PDF
PDF, High priority: read this firstnon-collusion-affidavit
HighAI Summary for Exhibit B - Non-Collusion Affidavit: This document is Exhibit B, a Non-Collusion Affidavit required for bid submissions to Montgomery County Community College. It affirms that the bid prices were independently determined without collusion or consultation with other bidders, and that no attempts were made to restrain competition. The affidavit must be signed by an authorized representative of the bidding firm and notarized. It includes instructions emphasizing the legal importance of truthful statements, the consequences of bid rigging, and the requirement for joint ventures to submit separate affidavits. The affidavit is material to contract awards and non-compliance may lead to bid disqualification.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit F - Specifications and Drawings for Montco Cultural Center Theater Roof Replacement: This document, titled Exhibit F - Specifications and Drawings, provides detailed project specifications for the roof replacement at Montco Cultural Center Theater, Blue Bell, PA. It includes a summary of the work covered by the contract, site access and use restrictions, coordination requirements, and detailed scope of work for steep sloped and low sloped roof replacements. The document outlines contractor responsibilities such as OSHA compliance, site coordination, material and labor provisions, and warranty requirements. It specifies removal and disposal of existing roofing systems, inspection and replacement of damaged decking, installation of insulation layers, metal roof panels, and associated accessories. The document also covers logistical and safety requirements, staging, and site cleanup. This version appears to be part of the contract documents governing the project execution.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Exhibit G - Prevailing Wage Rates for Montco Cultural Center Theater Roof Replacement Project: This document is Exhibit G, a prevailing wage determination for the Montco Cultural Center Theater Roof Replacement Project at Montgomery County Community College. It includes detailed prevailing wage rates effective as of various dates, listing hourly rates, fringe benefits, and total compensation for multiple labor classifications such as electricians, carpenters, laborers, and others. The document is issued by the Bureau of Labor Law Compliance with a contract award date of 5/12/2026 and determination date of 4/2/2026. It covers wage rates applicable to Montgomery County, PA, and is essential for compliance with labor standards on this building project.
PDF
PDF, High priority: read this firstperformance-payment-bond
HighAI Summary for Montco Cultural Center Theater Roof Replacement Project Bonds: This document contains the Performance Bond and Payment Bond requirements for the Montco Cultural Center Theater Roof Replacement Project at Montgomery County Community College. It includes instructions for bond execution, the Agreement of Surety, and the bond forms themselves. The bonds must be furnished within ten days of the Notice of Intent to Award, each in the amount of 100% of the contract sum, executed by a licensed surety authorized in Pennsylvania. The document outlines the obligations of the surety and the principal, ensuring payment to claimants supplying labor or materials under the contract. The bonds protect the obligee and comply with Pennsylvania's Public Works Contractors' Bond Law of 1967.
PDF
PDF, High priority: read this firstitb
HighAI Summary for Montco Cultural Center Theater Roof Replacement Project Invitation for Bids BID #9 – FY25/26: This document is the Invitation to Bid (ITB) for the Montco Cultural Center Theater Roof Replacement Project, BID #9 – FY25/26, issued on April 6, 2026. It outlines the bid schedule including mandatory walkthrough, question deadline, and bid due date. The project involves replacing approximately 13,000 square feet of roofing with a new insulated standing seam metal roof system, including sheet metal work, roof drains replacement, painting a screen wall, and installing TPO roofing on a low slope area. The document details submission instructions via PennBid, mandatory forms such as Bid Security, Non-Collusion Affidavit, and others, and specifies compliance with Pennsylvania Prevailing Wage Law. It also includes instructions to bidders on bid delivery, signatories, bid form pricing, and bid security requirements.
PDF
PDF, Low priorityaward
LowAI Summary for Bid Results for Montco Cultural Center Theater Roof Replacement Project: This document presents the bid results for the Montco Cultural Center Theater Roof Replacement Project. It includes a detailed table comparing bids from multiple contractors for various items such as base bid pricing, allowances, and unit prices. The table lists costs from contractors including ARK Contracting LLC, D.A. Nolt, Inc., Tern Roofing Systems, Greenstar Group LLC, Munn Roofing Corp, and O'Donnell Roofing Co. The bids cover labor, materials, equipment, and services necessary for the project, with specific allowances for metal deck replacement, fireproofing repair, and wood blocking replacement. The document serves as a record of the bid amounts and selected lowest bids for the project.
PDF
PDF, Low priorityemployment-verification-form
LowAI Summary for Commonwealth of Pennsylvania Public Works Employment Verification Form: This document is the Commonwealth of Pennsylvania Public Works Employment Verification Form. It is to be completed and returned to the contracting Public Body prior to contract award. The form requires company information, contract/project details, and affirmation of compliance with the Public Works Employment Verification Act through the federal E-Verify Program. The authorized representative attests to the truthfulness of the information and agrees to maintain documentation for audits or investigations.
PDF
PDF, Low priorityother
LowAI Summary for Exhibit C - Owner's Certification of Responsible Contractor Status: This document titled 'Exhibit C - Owner's Certification of Responsible Contractor Status' appears to be a form or template related to contractor certification. The content includes a table with headers such as NAME, RSS STYLE, Institution Name, MISSION, Mission Statement, and questions about the purpose and mission of the organization. However, the table fields are empty, indicating no specific data is provided. The document does not contain solicitation, contract, or technical details.
PDF
PDF, Low prioritycertification
LowAI Summary for Exhibit D - Owner's Certification of Responsible Contractor Status: This document is Exhibit D, titled Owner's Certification of Responsible Contractor Status. It collects general company information and requires the contractor to certify compliance with responsible contractor requirements for bids of $250,000 or greater. The requirements include compliance with labor laws, a bona fide apprenticeship program, and comprehensive health benefits. The contractor must certify the truthfulness of the information and agree to provide proof of compliance upon request. The form must be signed before any work is performed under the contract.
PDF
PDF, Low prioritysubcontractor-disclosure-form
LowAI Summary for Exhibit E - Subcontractor Disclosure Form: This document is Exhibit E, a Subcontractor Disclosure Form intended for listing subcontractors involved in a project. It includes sections to provide company names, addresses, project tasks, and attach resumes (limited to 2 pages) for up to three subcontractors. The form is used to disclose subcontractor information as part of a procurement or contract process.
PDF
PDF, Low prioritycontractor-reference-form
LowAI Summary for Exhibit F - Contractor Reference Form with Resumes: This document is Exhibit F, a Contractor Reference Form intended for contractors to provide references and attach resumes (maximum 2 pages). It includes fields for company name and details for up to three references, including reference name, organization, project name, construction cost, year completed, phone number, and email address. The form is used to document contractor qualifications and past project experience.
Ref. #: Montgomery County Community College, Pa Notice is hereby given that the Montgomery County Community College will accept sealed proposals online for the Montco Cultural Center Theater Roof Replacement Project (Bid #9 – FY25/26). Bids will be accepted until 12 p.m. EDT, April 21, 2026, via PennBid (pennbid.net). Questions must be submitted via PennBid by 5:00 p.m. EDT on April 14, 2026. Plans and specifications are available online at no charge via PennBid. The project includes the replacement of approximately 13,000 square feet of roofing at Montco Cultural Center Theater on the campus of the Montgomery County Community College. The existing standing seam metal roof is to be removed to the deck with a new insulated standing seam metal roof system to be installed. A new sheet metal work shall be installed, and the existing roof drains are to be removed and replaced. A 1,700 square foot screen wall is to be painted and 250 square feet of TPO roofing is to be installed on small low slope area. A mandatory bidder’s Pre-bid Conference and tour of the work area will take place on April 10th, 2026 at 10:00 a.m. EDT at the atrium of the Science Center building, located at 340 Dekalb Pike, Blue Bell, PA 19422. Failure to attend walk-through may be reason for Owner to reject bid.
The College reserves the right to waive any informalities or to refuse any or all of the bids. This project is subject to the Pennsylvania Prevailing Wage Law. Bid responses must be accompanied with Bid Security in the amount of 10% of the bid, and the following forms in accordance with the Instructions to Bidders: Non-Collusion Affidavit, Owner’s Certification of Responsible Contractor Status form and resume and references. Owner exercises their right for in-person interviews upon review of resume and references prior to awarding Bids.
After the Bid opening, Bids may be withdrawn only by complying with the “Modifications and Withdrawal” article of the Instructions to Bidders. The Owner reserves the right to reject any or all bids or any part thereof or items therein and to waive informalities and/or technicalities, as it deems best to protect its interest.
More opportunities from Pennsylvania → Montgomery County