Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

BIDWELL CREEK NEAR FORT BIDWELL STREAM GAGE INSTALLATION PROJECT

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Modoc Resource Conservation District

NAICS

N/A

Place of Performance

County Road 224, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Modoc Resource Conservation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Modoc Resource Conservation District
Office AddressN/A
Contacts
Michael ColbertProjects Manager

Full Description

Show more
The County of Modoc, through funding provided by the California Department of Water Resources Stream Gage Improvement Program (CalSIP), proposes installation of a stream gage and associated monitoring equipment to reestablish streamflow monitoring capabilities on Bidwell Creek near Fort Bidwell. Project improvements include installation of a bubbler pressure-sensor stream gage and associated monitoring equipment. The Project includes installation of a solar-powered datalogger/control box with telemetry within an existing roadside turnout, supported by two posts installed in approximately six-inch-diameter holes approximately two feet deep; installation of conduit between the control box and the stream gage; installation of associated anchoring; and installation of low- and high-flow staff plates along the streambank. The Project will use hand tools and small equipment and will result in minimal ground disturbance, primarily associated with the two control-box postholes. The Project does not include grading, dredging, stream channel modification, substantial vegetation removal, alteration of the streambank or streambed, diversion or obstruction of streamflow, or placement of fill within the stream channel. The Project was originally proposed at a different location along Bidwell Creek. The original location was subsequently determined to be unsuitable for installation and operation of the stream gage, and the Project was relocated to the existing roadside turnout along County Road 224 described above. The environmental review and CEQA exemption determination are based on the revised Project location and Project description.

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS