Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Big Canyon Coastal Habitat Restoration and Resiliency Project: Phase 3 (Streambed Alteration Agreement, No. EPIMS-ORA-36265-R5)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife, Region 5 – South Coast, has authorized the Newport Bay Conservancy under Streambed Alteration Agreement EPIMS-ORA-36265-R5 to execute the final phase of the Big Canyon Coastal Habitat Restoration and Resiliency Project in Newport Beach, California. This regulatory action, issued pursuant to Section 1602 of the Fish and Game Code, permits habitat modification activities including dredging, earthmoving, and streambed alteration using heavy equipment such as bulldozers, backhoes, amphibious dredging machinery, excavators with hydraulic concrete breakers and thumb attachments, front-end loaders, and graders. The project aims to restore natural hydrology and improve ecological resiliency at Big Canyon Creek and its confluence with Upper Newport Bay, qualifying for a statutory exemption under Public Resources Code Section 21080.56 with concurrence from CDFW as of May 4, 2022. The work is to be performed entirely on-site in Newport Beach, with acceptance and oversight responsibilities held by CDFW as the permitting authority and the Newport Bay Conservancy as the implementing entity. No federal acquisition regulation clauses, pricing data, payment instructions, evaluation factors, or formal contracting structure apply, as this is a state-level environmental authorization rather than a competitive federal procurement. The agreement was issued on July 30, 2025, with no specified period of performance, contract value, or delivery schedule, and no required representations, certifications, or socioeconomic filings were included in the documentation. Point of contact information is provided for both CDFW staff and the conservancy representative, but formal designations as contracting officers or representatives are not stated, and no packaging, inspection standards, invoicing methods, or accounting codes beyond the agency reference number are detailed.

General Info

Newport Bay Conservancy authorized to restore Big Canyon Creek habitat with dredging and earthmoving under state environmental permit.

Agency

California → Fish and Wildlife, Region 5 - South Coast, San Diego

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Newport Beach, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Big Canyon Coastal Habitat Restoration Phase 3

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 5 - South Coast, San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 5 - South Coast, San Diego
Office AddressN/A
Contacts
Joleena De La FeEnvironmental Scientist
Heather CieslakOperations Manager

Full Description

Show more
The California Department of Fish and Wildlife has executed Streambed Alteration Agreement, No. EPIMS-ORA-36265-R5, pursuant to Section 1602 of the Fish and Game Code to the Newport Bay Conservancy, as represented by Heather Cieslak. The project is the final phase of this multi-phase habitat restoration project in the Big Canyon Nature Park. Project activities include the use of a bulldozer, backhoe, steeltracked excavator mounted with a hydraulic concrete breaker and thumb attachments, front end loader, grader, and amphibious equipment for dredging.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Healy Tibbitts Builders, Inc. is seeking small business subcontractors and suppliers for the Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project in Hawaii. This firm-fixed-price contract, issued as an Invitation for Bid under NAICS code 237990, has an estimated value between 1 million and 5 million dollars. The scope of work includes mobilization and demobilization, the dredging and ocean disposal of 4,260 cubic yards of material, and revetted mole repairs involving stone rework, CRM wall repair, and vegetation removal. The period of performance is 200 calendar days from the date of the Notice to Proceed. The project requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. The contract includes a liquidated damages clause of 2,297 dollars per calendar day of delay. Award is based on a lowest responsive and responsible bidder selection process, with specific set-asides for various small business categories, including HUBZone, WOSB, and SDVOSB. Invoicing is conducted monthly, and the contractor must provide a detailed breakdown of pay items within 30 days of the Notice to Proceed.
Healy Tibbitts Builders, Inc.

POSTED

about 7 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
SBWRP Reverse Osmosis System
Solicitation # K-26-2469-DBB-3
Garney Pacific, Inc. is acting as the general contractor for the SBWRP Reverse Osmosis System project in San Diego, California, for the City of San Diego. With an estimated bid value of 19.3 million dollars, the project scope involves designing the removal of existing trailer-mounted Electrodialysis Reversal, slab-mounted Membrane Filtration, and Reverse Osmosis units. These will be replaced with new slab-mounted Membrane Filtration and Reverse Osmosis units to create a demineralization facility aimed at reducing total dissolved solids in reclaimed water. The solicitation, identified by bid number K-26-2469-DBB-3 and NAICS code 237990, seeks quotes for various trade services including HVAC, plumbing, electrical, concrete, pumping, crane services, aggregate, landscaping, painting, piping insulation, and demolition. The project emphasizes socioeconomic participation, specifically seeking SLBE and ELBE firms with DBE, MBE, WBE, or SBE certifications, and is open to various small business set-asides. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, though Garney will reimburse the bond premium. Contracting will be based on Garney Standard PO and Subcontract Forms, and any exceptions must be submitted as redlines with the quote. Proposals are due by August 27, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details