Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Big Piney Office Interior Sewer Line Replacement

Closed
1240LT26Q0154Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in Belmont, North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and utilizes EJCDC standard forms for its contracting requirements. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide a bid bond, evidence of authority to do business in North Carolina, and documentation of good faith efforts to meet MBE and WBE participation goals, which are set at 10 percent combined for the state and approximately 10.9 percent for MBE and 10.4 percent for WBE per EPA goals. Performance and payment bonds, as well as proof of insurance, are required. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Technical requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, and the operation of a temporary 11 MGD pumped bypass. Additional tasks encompass electrical and instrumentation upgrades, rehabilitation of reactor mixers and aerators, motor control center component replacement, sluice and slide gate modifications, and general excavation and surveying. This solicitation is open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities, with a specific emphasis on DBE, MBE, WBE, and SBE subcontractors. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Quotes for services and supplies, including lead abatement, metals fabrication, and trucking, are due by November 17, 2026, with the final bid date set for November 18, 2026. Any exceptions to standard subcontract forms must be submitted as redlines alongside the quote.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

Solicitation 1240LT26Q0154 is a firm fixed price request for quotes for the interior sewer line replacement and related repair work at the Big Piney Ranger Station on the Bridger-Teton National Forest in Wyoming. The project scope includes the demolition of finished flooring and a concrete slab along 81 feet of sewer line, the disconnection and reconnection of 17 plumbing fixtures, the installation of a new sewer line, and the subsequent restoration of the concrete slab, aggregate, and flooring. The mandatory period of performance is scheduled from November 1, 2026, to January 29, 2027, with a total contract duration of 90 days. This acquisition is a total small business set-aside under NAICS code 237110. Award will be granted to the lowest technically rated offeror, provided the price is fair and reasonable and past performance is acceptable or neutral. Technical evaluations are based on an experience questionnaire and a detailed technical approach. The contract is subject to the Davis-Bacon Act for prevailing wage rates and requires the provision of performance and payment bonds. Contractors must adhere to strict material labeling standards, including NSF-dww and NSF-sewer markings for piping, and comply with ADA accessibility guidelines. All quotes must be submitted to Terri Tucker by the specified deadline.

General Info

Sewer line replacement at Big Piney Ranger Station; Small Business Set Aside; deadline 9/14/2026.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Big Piney, WY, 83113, USA

Set-Aside

SBA

Documents

8

1240LT26Q0154 Amendment 0001 Q&A

PDF, High priority: read this first2 pages · amendment
High

Big Piney Ranger Station Sewer Line Replacement - General Specifications

PDF, High priority: read this first143 pages · sow
High

C04a Schedule of Items - Big Piney Ranger Station Sewer Line Replacement

PDF, High priority: read this first1 page · schedule-of-items
High

C04b Drawings Big Piney Sewer Office Repairs 2026-07-30

PDF, High priority: read this first6 pages · drawings
High

Solicitation 1240LT26Q0154 - Big Piney Office Interior Sewer Line Replacement IFB

PDF, High priority: read this first27 pages · ifb
High

Wage Determination WY20260041 Building Construction 06/18/2026

PDF, High priority: read this firstwage-determination
High

Past Performance Data Sheet

DOCX, Low priority1 page · past-performance
Low

USDA Forest Service Experience Questionnaire

DOCX, Low priority3 pages · experience-questionnaire
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline time changed from 11:00 AM UTC to 11:00 PM UTC on Sep 14, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Bridger-Teton National Forest
Contacts1 person available
OfficeJACKSON, WY, 83001, USA
Office AddressJACKSON, WY, 83001, USA
Contacts

Full Description

Show more

This project consists of replacement of the sewer line and related repair work on the Big
1.2
Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is
operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney,
Wyoming. Work will include demolition of finished flooring as needed, demolition of
concrete slab along 81’ of sewer line, disconnection of 17 plumbing fixtures,
replacement of sewer line, patching of concrete slab and replacement of aggregate,
reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work
includes the removal and proper disposal of all demolished materials. The contractor
shall provide all required materials. Quotes should describe the method that will be
used to replace the sewer line, and what areas will be effected by related demolition
work.

More opportunities from Department Of Agriculture → Bridger-Teton National Forest

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS