Big Piney Office Interior Sewer Line Replacement

Active
1240LT26Q0154Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Big Piney Office Interior Sewer Line Replacement project involves the replacement of a sewer line and associated repairs at the Big Piney Ranger Station on the Bridger-Teton National Forest in Big Piney, Wyoming. The scope of work includes the demolition of finished flooring and a concrete slab along 81 feet of the sewer line, the disconnection and reconnection of 17 plumbing fixtures, and the subsequent patching of the concrete slab and replacement of aggregate and flooring. The contractor is responsible for providing all necessary materials and ensuring the proper disposal of all demolished debris. This solicitation, numbered 1240LT26Q0154, is designated as a total Small Business Set Aside under NAICS code 237110. Managed by the Department of Agriculture, the response deadline is September 14, 2026. Interested contractors must submit quotes that detail the specific methods used for the sewer line replacement and identify the areas affected by the demolition work.

General Info

Sewer line replacement at Big Piney Ranger Station; Small Business Set Aside; deadline 9/14/2026.

Agency

Department Of Agriculture → Bridger-Teton National ForestView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Big Piney, WY, 83113, USA

Set-Aside

SBA

Documents

(7)

Past Performance Data Sheet

DOCXpast-performance

C04a Schedule of Items - Big Piney Ranger Station Sewer Line Replacement

PDFschedule-of-items

C04b Drawings Big Piney Sewer Office Repairs 2026-07-30

PDFdrawings

Big Piney Ranger Station Sewer Line Replacement - General Specifications

PDFsow

USDA Forest Service Experience Questionnaire

DOCXexperience-questionnaire

Wage Determination WY20260041 Building Construction 06/18/2026

PDFwage-determination

Solicitation 1240LT26Q0154 - Big Piney Office Interior Sewer Line Replacement IFB

PDFifb

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Bridger-Teton National Forest
Contacts1 person available
OfficeJACKSON, WY, 83001, USA
Organization / Agency
Department Of Agriculture → Bridger-Teton National Forest
View Agency Profile
Office AddressJACKSON, WY, 83001, USA
Contacts

Full Description

Show more

This project consists of replacement of the sewer line and related repair work on the Big
1.2
Piney Ranger Station on the Bridger-Teton National Forest (NF). The facility is
operated by the Bridger-Teton NF on the Big Piney Ranger District in Big Piney,
Wyoming. Work will include demolition of finished flooring as needed, demolition of
concrete slab along 81’ of sewer line, disconnection of 17 plumbing fixtures,
replacement of sewer line, patching of concrete slab and replacement of aggregate,
reconnection of 17 plumbing fixtures, and replacement of finished flooring. Work
includes the removal and proper disposal of all demolished materials. The contractor
shall provide all required materials. Quotes should describe the method that will be
used to replace the sewer line, and what areas will be effected by related demolition
work.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 is a solicitation issued by Carl Belt, Inc. for a project located in Maryland. The primary objective is to address aging infrastructure to ensure compliance with nitrogen, phosphorous, and NPDES thermal requirements, thereby improving the water quality of receiving streams and increasing plant reliability. The scope of work includes the replacement of influent screens, washer compactors, in-plant pumps, RAS pumps, and the Operations Building Sanitary Grinder Pump Station. Additionally, the project requires the installation of a headworks enclosure building, a dedicated chemical storage building for ferric chloride or alum, and the replacement of Motor Control Centers, PLCs, and switchgear. Structural repairs to concrete at the headworks and miscellaneous building improvements to HVAC, roofing, and doors are also required. This project is wage rated and strongly encourages participation from small businesses, including veteran-owned, HUBZone, disadvantaged, and woman-owned concerns. Carl Belt, Inc. is specifically seeking MBE, DBE, and WBE participants for various subcontracting roles such as electrical, mechanical, masonry, and painting, as well as suppliers for wastewater pumps, sluice gates, and concrete materials. Bids are due by August 17, 2026, at 4:00 PM and should be submitted to the Cumberland, Maryland office or via the designated online portal. Detailed plans and specifications are available through the company website, and Jared Burkett serves as the primary administrative contact.
Carl Belt, Inc.

POSTED

about 6 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise (DBE) subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida. This project, owned by the Central Florida Water Cooperative, has an estimated value of 270 million dollars. The scope of work is extensive, encompassing the construction of raw water production wells with well heads and pumps, discharge piping, surge bladder tanks, and site civil works. It also includes the construction of an electrical building, standby generator, wellhead cages, and specialized facilities such as Operations and Reverse Osmosis buildings, a pretreatment chemical building, a post-treatment chemical building, a post-treatment degasification system, and an odor control air exhaust dispersion stack system. Additionally, the contractor must provide production well disinfection and primary and secondary water quality analytical laboratory testing to achieve regulatory certification. The deadline for bid submissions is August 19, 2026, at 2:00 PM EST. Interested parties must submit their proposed scope of work at least 24 hours before the bid date and provide firm pricing by 10:00 AM on the day of the bid. Proposals should be emailed to Nichole Voitel at watergmpbids@whartonsmith.com. Bidding documents, including plans, specifications, and addenda, are available for free download via ConstructConnect. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

about 6 hours ago

DEADLINE

in 4 days
View Details