This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BK27 IPC Base Life Support (BLS) Service in Philippines (Amendment 1)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The solicitation M68450-26-Q-H006 seeks Base Life Support services at Camp Aguinaldo, Philippines, with performance scheduled from August 17 to August 23, 2026, under a Firm Fixed Price contract. The requirements have been amended to reduce the lead time from seven to five days, eliminate the rental of room dividers, and replace the originally specified 5-ton forklift with a 1-ton forklift due to operational constraints around trees on the gravel terrain; the 1-ton forklift is the only technically acceptable size, and the contractor must provide all fuel for its operation. Services include delivery of two 50-gallon drums of diesel fuel, collection and disposal of 20 gallons of hazardous waste (10 gallons oil and 10 gallons coolant), and material handling during the performance window. All equipment must be emplaced by 1200 on the first day and removed no later than 1600 the day after performance ends. Submission requires a completed solicitation form with all yellow-highlighted fields filled, a one-page PDF quotation, a 1–2 page service plan detailing technical capability and execution strategy, and a completed Foreign Vendor Information Form. Responses must be emailed by 11:59 PM Philippines Standard Time on August 9, 2026, to the designated points of contact, and all submissions must include the required representations and certifications including compliance with cybersecurity, contractor disclosure, and anti-trafficking provisions. Award will be made on a best value trade-off basis, with Technical Acceptability being the most critical factor, followed by Past Performance and then Price. Technical acceptability is determined by the offeror’s ability to meet performance timelines, demonstrate service plan alignment with the PWS, and show operational readiness including equipment suitability and site access planning. Offerors must have a registered UEI or CAGE code and comply with all Federal Acquisition Regulation clauses including those prohibiting involvement with inverted domestic corporations, debarred entities, and foreign adversary-controlled subsidiaries. Security requirements are stringent: all personnel must obtain base access through U.S. and Philippine military channels, provide photo identification, complete antiterrorism training, and adhere to OPSEC and force protection policies. Foreign vendors are subject to enhanced screening. Payment will be made via Electronic Funds Transfer in Philippine Pesos at the daily exchange rate, and the contractor assumes full responsibility for transportation, setup, maintenance, compliance with U.S. OSHA and Philippine
General Info
Place of Performance
CA, PHLSet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Amendment 1:
See attached “D1. Performance Work Statement (PWS) (Amendment 1)” and “D1. Solicitation M68450-26-Q-H006 BK27 IPC BLS (Amendment 1)” for detail.
Required lead time: changed from “equal or shorter than 7 days” to “equal or shorter than 5 days”.
The rental requirement of “room dividers” has been removed, and the 5-ton forklift has been replaced by 1-ton forklift.
After careful consideration, the contracting officer shortened the required lead time to ensure enough time for quotes evaluation. Thank you very much for your understanding.
Questions and Answers:
Question 1: Room dividers - what is the preferred height and acceptable minimum/maximum height range?
Answer: removed “room dividers” from the BLS requirement.
Question 2: For Material handling equipment (5 Ton forklift), is flight line access needed inside the airport?
Answer: Will not be used on flight line. However, the area the forklift will be used in has some trees that cannot be removed, therefore requires 1-ton forklift to work around the trees. Forklift larger than 1-ton forklift will not be technically acceptable. Contractor must provide the fuel necessary for the forklift to operate.
Question 3: Forklift hours – Does the Operators and equipment need to be available 24 hours on Call?
Answer: Operation hours will be limited to 0800-1800. “24-hours on call” is not required.
Question 4: Hazardous waste – what is the Hazardous Waste Generator (HWG) ID?
Answer: Unable to provide. The Government Technical Point of Contact (TPOC) currently does not have the answer.
Question 5: MHE operations – what are the necessary lifting accessories?
Answer: Only lifting accessories necessary will be fork extenders, which the government TPOC will provide.
Question 6: Summary of the Requirements –
• Generator Fuel - 2 drums x 50gallons
• 1-ton Forklift
• Hazmat Collection
Room Dividers are removed from the requirement. They are no longer needed.
RFQ/Solicitation Number: M68450-26-Q-H006
RFQ Date: 4 Aug 2026 (California time), Amendment 1 date: 7 August 2026 (California time)
PROJECT: Base Life Support Service for BK27 IPC (Generator Fuel, Room Divider rental, HAZMAT collection & MHE)
QUESTION CLOSE: 7 Aug 2026 at 11:59 pm [Philippines standard time]
RFQ CLOSE: 9 Aug 2026 at 11:59pm [Philippines standard time]
Period of Performance: see attached Performance Work Statement (PWS) (Amendment 1).
Location: Philippines, see attached PWS (Amednment 1).
This is a Request for Quote. This is NOT an order. This document is not legally binding and does not commit the US Government in anyway.
Upon completion of this quote, please email your response to both Capt Annie A. Berg at annie.berg@usmc.mil and SSgt Liu, Jacie at jacie.liu@usmc.mil. All quotes are due to the Contracting Officer no later than 9 Aug 2026 at 11:59pm [Philippines standard time]. Quotes may not be accepted past the RFQ close date & time specified unless determined to be in the best interest of the Government by the Contracting Officer.
General Requirements. Quotes shall consist of, at a minimum:
1.Completed this Solicitation document with all required information filled. All yellow highlighted ares needs to be completed by quoters. RFQ with required information and applicable representations and certifications.
• Contractor information on the first page.
• Total amount, lead time, signature and date on the first page.
• Check “[ ] does or [ ] does not” in provision 52.204-26
• Check “[ ] does or [ ] does not” in provision 252.204-7016
• Check “[ ] will or [ ] will not” in provision 252.204-7017
2. One page quotation in PDF form.
3. Provide a 1-2 page service plan/technical capability statement, providing specifications of all BLS services outlined within the PWS throughout the period of performance.
4. Completed FORIEGN VENDOR INFORMATION FORM.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS