Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on November 12, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BL004-26 - Middle Yellow River Interceptor Phase 2

Closed
PE-77023-NONST-2026-000000464State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The Gwinnett County Board of Commissioners is soliciting bids for the Middle Yellow River Interceptor Phase 2 project (Project No. F01635.01), a construction effort managed by the Gwinnett County Department of Water Resources. The scope of work includes the installation of approximately 6,000 linear feet of 24-inch diameter ductile iron pipe gravity sewer and 19 precast concrete manholes. Additional requirements involve sewer service connections, multiple stream crossings, the abandonment of private septic systems, erosion and sediment control, site restoration, and the delivery of as-built drawings with GIS data. The project is governed by O.C.G.A. §36-91-20, and all bidders must be pre-qualified for gravity sanitary sewer construction. The project timeline requires substantial completion within 420 days, with final payment eligibility occurring 450 days thereafter. Sealed bids must be submitted to the Gwinnett County Department of Financial Services by 2:50 P.M. on January 20, 2026, as updated by Addendum 01. Bidders are required to acknowledge all addenda to avoid disqualification. While the bid opening is conducted virtually via Webex, physical submissions are mandatory. The contract is expected to be a firm fixed price award, likely based on a lowest price technically acceptable approach, though specific evaluation weights and contract values were not disclosed in the provided documentation.

Documents

2
PDF, High priority: read this first3 pages · amendment
High
PDF, High priority: read this first4 pages · itb
High

Read all 2 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 15 days
  • Lift Station No. 85 ReplacementOpen now, due in 26 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Jan 20, 2026 to Jan 15, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Gwinnett County Government
Contacts1 person available
OfficeN/A

Full Description

Show more
The Gwinnett County Board of Commissioners (Owner) is requesting Bids for the construction of the following Project pursuant to O.C.G.A. §36-91-20: Middle Yellow River Interceptor Phase 2 F01635.01

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS