Bloomfield Pumping Plant Force Main Upgrades

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bloomfield Pumping Plant Force Main Upgrades project entails the construction of a new 24-inch diameter HDPE force main to replace the existing 15-inch diameter Joint Outfall F Unit 7C Force Main No. 1, which will be abandoned in place upon completion. The existing Force Main No. 2 will be maintained as the redundant system to ensure operational continuity. The scope includes full replacement of all yard piping and appurtenances downstream of the pump discharge header wall spool, installation of automated valve actuators and a flow meter for enhanced system control, and various exterior improvements to the plant grounds. The project is located along a 2,875-foot alignment extending from 166th Street through Norwalk Boulevard to Breaker Manhole F178 at Alondra Boulevard within the cities of Norwalk and Cerritos, California. Environmental compliance is addressed through categorical and statutory exemptions under the California Environmental Quality Act, specifically Sections 15302 and 21080.21, which permit the replacement and emergency mitigation of the existing infrastructure without full environmental review. The Los Angeles County Sanitation District is the responsible public agency overseeing the project, with Marvin Holmes serving as the primary point of contact for engineering inquiries. No federal acquisition regulation clauses, contract values, payment details, evaluation factors, or subcontracting requirements are specified in the documentation, indicating this is a public agency-led infrastructure project governed by state environmental and procurement procedures rather than federal contracting standards. The project does not include identified contract types, delivery schedules, invoicing protocols, or designated contracting officers, and there is no indication of competitive solicitation or offeror requirements beyond the posted environmental notice.

General Info

Replace 15-inch force main with 24-inch HDPE, maintain redundant system, install valves and meter, Norwalk to Cerritos, CA.

Agency

California → Los Angeles County Sanitation District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(3)

Memorandum for Bloomfield Pumping Plant Force Main Upgrades

PDFmemorandum

Memorandum and Notice of Exemption for Bloomfield Pumping Plant Force Main Upgrades

PDFmemorandum

Bloomfield Pumping Plant Force Main Upgrades Notice of Exemption

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Los Angeles County Sanitation District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Los Angeles County Sanitation District
Office AddressN/A
Contacts
Marvin HolmesEngineer Associate III

Full Description

Show more
This project consists of constructing a new 24-inch diameter HDPE Force Main (FM) No.1 to replace existing 15-inch diameter Joint Outfall F Unit 7C FM No. 1. Upon completion, existing Joint Outfall F Unit FM No. 2 will be operated as the redundant force main. The existing Joint Outfall F Unit 7C FM No. 1 will be abandoned in place. The project will also include the replacement of all existing yard piping and appurtenances downstream of the pump discharge header wall spool. Automated valve actuation and flow meter will be provided along with various plant exterior improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 project, managed by Carl Belt, Inc., focuses on upgrading aging infrastructure in Maryland to ensure compliance with nitrogen and phosphorous limits and NPDES thermal requirements. The scope of work includes the replacement of influent screens, washer compactors, in-plant pumps, and RAS pumps, as well as the addition of a WAS pump to Final Clarifier No. 1. Key structural and electrical improvements involve installing a building to enclose the headworks, constructing a dedicated building for a new chemical storage tank, replacing motor control centers, PLCs, and switchgear, and repairing concrete at the headworks. Additional tasks include modifying primary sludge pump discharge piping, adding a nitrate probe to BNR basins, and performing various building repairs to the roof, HVAC, and windows. This is a wage-rated solicitation with a response deadline of August 17, 2026, at 4:00 PM. The project strongly encourages participation from small businesses, including SDB, WOSB, HUBZone, and veteran-owned concerns, and specifically seeks MBE, DBE, and WBE participants for various electrical, mechanical, and masonry subcontracts, as well as specialized suppliers for wastewater pumps and sluice gates. Bids and detailed plans are managed through the Carl Belt, Inc. website, with primary administrative contact provided by Jared Burkett.
Carl Belt, Inc.

POSTED

about 6 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise (DBE) subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida. This project, owned by the Central Florida Water Cooperative, has an estimated value of 270 million dollars. The scope of work is extensive, involving the construction of raw water production wells, well heads, well pumps, discharge piping, and a surge bladder tank. Additional requirements include site civil work, a wellhead cage, an electrical building, a standby generator, and the construction of several specialized facilities, including Operations and Reverse Osmosis buildings, a Pretreatment Chemical Building, a Post-Treatment Chemical Building, a Post-Treatment Degasification System, and an Odor Control Air Exhaust Dispersion Stack System. The project also requires production well disinfection and primary and secondary water quality analytical laboratory testing to achieve regulatory certification. Bidding documents are available for free download via ConstructConnect. Interested parties must submit their proposed scope of work at least 24 hours before the bid date, with firm pricing due by 10:00 AM on the day of the bid. The final bid deadline is August 19, 2026, at 2:00 PM EST. Proposals should be emailed to Nichole Voitel at watergmpbids@whartonsmith.com. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

about 6 hours ago

DEADLINE

in 5 days
View Details