Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 30, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Bluff Top Slope Repair

Closed
CC-1815State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26ITB0921226K-CRB Abatement & Demolition Services for Fulton County Jail Project
Solicitation # 26ITB0921226K-CRB
Fulton County, Georgia, is soliciting bids for solicitation number 26ITB0921226K-CRB to provide abatement and demolition services for the Fulton County Jail project. The scope of work involves the demolition of three specific locations: the Fulton County Accountability Court, Jefferson Place Transition Housing, and the Bellwood Annex. The project covers approximately 32.86 acres, with 3.30 acres of disturbed area, and requires the removal of buildings, foundations, utilities, and pavement. A critical component of the contract is the identification, abatement, and lawful disposal of hazardous materials, including asbestos-containing materials and lead-based coatings, in compliance with NESHAP, OSHA, and GA EPD regulations. The final objective is to create a proposed green space for a future facility, which includes grading and restoring disturbed areas with topsoil and grass seed. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of price, technical experience, and financial capacity. Bidders must attend a mandatory guided site visit on November 10, 2026, and submit their sealed bids by November 20, 2026. Required submissions include a bid bond for five percent of the bid amount, as well as various certifications and disclosure forms. The successful contractor must provide performance and payment bonds for 100 percent of the bid and utilize the B2GNow software for payment reporting. Work is to commence within ten days of a notice to proceed, which may be issued within 120 days of contract execution. All work is subject to inspection by the Construction Manager to determine substantial and final completion.
Fulton County Purchasing Department

POSTED

about 10 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The project involves unclassified excavation work including saw cutting, removal, and disposal of asphalt, vegetation, and debris, with existing soil being excavated and stockpiled on site for reinstallation, while additional soil will be imported as needed. The slope will be reconstructed using slope benches reinforced with Geogrid, and the entire slope face will be covered with geojute erosion control fabric, complemented by drought-resistant landscaping. A new 4-zone irrigation system will be installed by connecting to the existing water line, utilizing a temporary solar-powered controller, with all necessary conduits, valves, and appurtenances provided by the contractor. The paving of a 4-inch asphalt overlay over a compacted subgrade will be completed, featuring a redwood header along the edge. The contractor is responsible for implementing and maintaining erosion control measures and best management practices in accordance with the Water Pollution Control Program (WPCP). Staging will be confined to a designated area north of the lower beach path, enclosed with temporary fencing and a wind screen. Throughout construction, the contractor must ensure continuous pedestrian access of at least 12 feet on the upper beach path, providing traffic control plans and personnel such as flaggers when vehicles move along the paths. All equipment and materials used for maintaining access must be removed upon completion. The contractor is also tasked with providing and managing all traffic control measures during the project, ensuring access to both the lower and upper beach paths at all times. The project is solicited under the title "Bluff Top Slope Repair," with a response deadline of October 21, 2025, and a contract value estimated between $500,000 and $1,500,000. The primary contact for the project is Joe Fuentes, reachable via email or phone.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Huntington Beach
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The project will consist of unclassified excavation, including saw cutting, removal, and disposal of asphalt, vegetation, and miscellaneous debris. The existing soil shall be removed and stockpiled on site for reinstallation. Additional soil will need to be imported. The slope shall be reconstructed using slope benches and reinforced with Geogrid. Installation of geojute erosion control fabric over the entire slope face and installation of drought-resistant landscaping. Provide a point of connection and tap into the existing water line to install a 4-zone irrigation system with a temporary solar irrigation controller with no cabinet, all conduits, valves, and appurtenances to be furnished and installed. Pave new 4” asphalt over compacted subgrade with a new redwood header along the edge. The Contractor shall install and maintain all project erosion control and BMPs per the WPCP. The Contractor shall set up and maintain the staging area north of the lower beach path only, the staging area to be enclosed with temporary fencing with a wind screen. The Contractor shall provide a traffic control plan to maintain a minimum of 12’ of pedestrian access in the upper beach path during all phases of construction. The Contractor shall furnish, install, and maintain all traffic control during construction. The Contractor shall remove and dispose of any and all equipment and material used to maintain pedestrian access. The Contractor shall make sure that there is access to both the lower and upper beach path at all times. The Contractor shall provide flaggers when their vehicles are traveling on either of the beach paths.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS