Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Wisconsin was posted on June 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Boiler Removal and Disposal

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project, necessitated by a sprinkler system failure, requires the remediation of mold throughout the entire building and the cleaning or replacement of damaged theater seating cushions. All work must be performed in accordance with ANSI/IICRC S520 standards, EPA and OSHA regulations, and the Micro Air Inc. Mold Testing report dated April 11, 2024. Key requirements include the provision of a Certified Industrial Hygienist to verify materials and conduct final clearance, the implementation of a detailed remediation plan featuring HEPA filtration and negative air pressure, and strict adherence to Davis Bacon Act wage determinations. The contract will be awarded based on best value, evaluating price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must submit a single lump sum proposal on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Required insurance includes automobile liability and workers compensation meeting state statutory limits. Performance must commence within 14 days of the Notice to Proceed. Final payment is subject to Net 30 terms and requires the submission of a completed SF 1413, certified payroll records, and a release of liens from all subcontractors and suppliers.
Atterbury Job Corps Center

POSTED

about 4 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The City of Madison is seeking a subcontractor to safely disconnect, remove, and dispose of existing boilers, with strict adherence to environmental and safety standards. This work requires the proper handling of residual fluids and the potential removal of asbestos, all in full compliance with EPA and OSHA regulations. The contractor must ensure that all procedures are conducted with due diligence to protect workers and the environment, including appropriate containment, labeling, and disposal methods for hazardous materials. The solicitation is open for bids with a response deadline of July 17, 2026, and is categorized under NAICS code 562910 for other remediation services. The contract is designated as a subcontract opportunity and is posted on the Wisconsin VendorNet portal. There is no set-aside classification specified, and all performance is expected to occur within the jurisdiction of the City of Madison, Wisconsin. Interested parties must review the official posting for detailed requirements and submission guidelines.

General Info

Subcontractor needed to remove and dispose of boilers in Madison, WI, complying with EPA and OSHA standards.

Place of Performance

WI, USA

Set-Aside

NONE

Documents

This scope was carved out of 15052-0-2026.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Straubel Wright Apartments Boiler Replacement

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → City of Madison
ContactsNo contacts available
OfficeN/A
Organization / AgencyWisconsin → City of Madison
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Safely disconnect, remove, and dispose of existing boilers, including handling of residual fluids and potential asbestos abatement in compliance with EPA and OSHA regulations.

More opportunities from Wisconsin → City of Madison

Same awarding agency

NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for contract 9585, project 13863, to perform the Castle Creek Channel Improvements at Warner Park in Dane County, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening the channel from Sherman Avenue to Warner Lagoon, implementing storm sewer improvements, and performing native plant restoration. The project includes the potential removal, salvage, and reinstallation of existing bridges following final grading and riprap placement. Contractors must adhere to various environmental permits, including authorizations from the US Army Corps of Engineers, the WDNR for hydrologic restoration and storm water construction, and the City of Madison for erosion control. Bidders must be prequalified, specifically in category 246 for Ecological Restoration, or utilize a prequalified subcontractor for related work items. The contract is designated as a Best Value Contract for multi-trade bids equal to or greater than 386,500 dollars. A 5 percent bid bond is required, and the project carries a Small Business Enterprise goal of 12 percent. Awardees must provide payment and performance bonds and comply with the City of Madison Affirmative Action Ordinance. Performance is subject to strict quality standards, including a one-year guarantee on seeded areas and compliance with Wind Sock Standards for erosion control. Failure to comply with specific contract articles may result in liquidated damages of 0.5 percent of the award price per week, capped at 5 percent or 10,000 dollars. Grant funds for the project are administered on a reimbursement basis.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 8 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS