Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Boiler Replacement

Closed
FA480026Q0057Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The 633d Contracting Squadron at Langley Air Force Base is soliciting quotations under solicitation number FA480026Q0057 for the replacement of two obsolete Fulton PHW boilers with two new Lochinvar FTX 1000 fire-tube condensing boilers at Facility 1302, Joint Base Langley-Eustis, Virginia. This procurement is structured as a total small business set-aside under NAICS code 333618, with award to be made on a lowest-priced technically acceptable (LPTA) basis, meaning price is the primary determining factor so long as the offer meets minimum technical acceptability requirements. The scope includes complete removal and disposal of existing units, supply of the new boilers, and full installation with all associated labor, piping, electrical, controls, commissioning, and system testing to ensure operational readiness per manufacturer specifications and applicable local, state, and federal codes, including the National Electrical Code. A mandatory site visit at Facility 1308 on May 12, 2026, is required prior to submission, and all offerors must be registered in the System for Award Management (SAM.gov) with a valid Unique Entity ID. Proposals must be submitted as an itemized quotation on company letterhead with specification sheets and product images, and must be received by 7:00 PM EST on May 21, 2026, via the SAM.gov portal. Contract performance is limited to Facility 1302, with all work expected to be completed and the system fully operational by June 30, 2026, though delivery of equipment is targeted for June 15. Work must be conducted Monday through Friday, 8:00 AM to 4:00 PM local time, excluding federal holidays, and contractors must be licensed mechanical contractors with at least five years of experience in commercial boiler systems, and their technicians must be specifically certified for the Lochinvar FTX 1000 model. The contract incorporates numerous FAR and DFARS clauses addressing compliance with labor standards, trafficking in persons, sustainable products, Buy American and Trade Agreements requirements, electronic payment via WAWF, and operational security, including strict protocols for access control, incident reporting within 24 hours, and adherence to base-specific CIL guidelines. No formal contract administration team beyond the primary point of contact, Erika Allen, has been designated, and no COT

General Info

Boiler replacement contract at Langley AFB, small business set-aside, bids due May 19, 2026.

NAICS

333618 - Other Engine Equipment Manufacturing

Place of Performance

GRASSY CREEK, VA, 23665, USA

Set-Aside

SBA

Documents

7

Attachment 4 F1302 Boiler Blueprints

PDF, High priority: read this firstspecifications
High

RFQ FA480026Q0057 Boiler Replacement at Langley AFB

PDF, High priority: read this first4 pages · rfq
High

Solicitation FA480026Q0057 Boiler Replacement Q&A 5-19-26

PDF, High priority: read this first1 page · q-and-a
High

Statement of Requirement for Boiler Replacement at Joint Base Langley-Eustis Rev. 1

PDF, High priority: read this first4 pages · statement-of-requirement
High

FA480026Q0057 Boiler Replacement Q&A

PDF, Low priority1 page · q-and-a
Low

Meeting Point

PDF, Low priority1 page · other
Low

Attachment2_VC+to+588+Weyland.png

PNG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 19, 2026 to May 21, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4800 633 Cons Pkp
Contacts1 person available
OfficeLANGLEY AFB, VA, 23665, USA
Office AddressLANGLEY AFB, VA, 23665, USA

Full Description

Show more

The 633d Contracting Squadron, located at 14 Burrell Street, building 67, Langley AFB, VA, has a requirement for the procurement of Boiler Replacement. The attached Statement of Requirement (SOR) for this solicitation is incorporated by reference and outlines the specifications for this procurement.


Questions: Vendors may submit questions regarding clarification of solicitation requirements to Erika Allen by email to contact@example.gov by 12:00 PM EST on 13 May 2026. Any questions received after this date may not be answered.


Site Visit: A Site visit will be accomplished at 10:00 AM EST on 12 May 2026 at 588 Weyland Road, F. 1308, Langley AFB, VA 23665. Please see attached Request for Quotation (RFQ) document for details on obtaining access to Langely AFB for the site visit. To help with finding parking, please see attached maps.


Please see attachment Questions and Answers (Q&A) document dated 5/19/26.


Blue prints were attached to this posting. 

More opportunities from Department Of Defense → FA4800 633 Cons Pkp

Same awarding agency

NAICS: 238210
New
Federal
Airfield Lighting Computer System
Solicitation # FA480027Q00001
Solicitation FA480027Q0001, issued by the 633d Contracting Squadron, seeks a contractor to provide comprehensive preventive maintenance, diagnostics, calibration, and repair services for the Airfield Lighting Computer System (ALCS) at Joint Base Langley-Eustis, Langley AFB, Virginia. The scope of work includes semi-annual inspections of computer nodes, Constant Current Regulator output tuning, capacitor testing, and infrared imaging for hotspots. Additionally, the contractor is required to provide hands-on system and hardware training for customer maintenance personnel and deliver detailed, custom-tailored reports documenting all actions taken. The contract is structured as a Firm Fixed Price arrangement with a base period from November 30, 2026, to November 29, 2027, and multiple option periods extending through November 2031. Award will be based on the most advantageous offer, evaluating the three lowest-priced proposals for technical and past performance acceptability. Proposals must be submitted in three separate volumes—Price, Technical, and Past Performance—each limited to 10 pages. Invoicing is processed electronically via the Wide Area WorkFlow system, and the contractor must provide a Quality Control Plan within 10 working days of award. All personnel must meet specific base access and security requirements, including validation by a Facility Security Officer.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 20 hours ago

DEADLINE

in 7 days
View Details
NAICS: 532210
New
Federal
Langley AFB Washer/Dryer Lease and Maintenance
Solicitation # FA480027Q0004
Solicitation FA480027Q0004 is a Small Business Set Aside for the rental, installation, and maintenance of new washers and dryers at Langley AFB, VA. The contractor is responsible for providing all labor, supervision, tools, and transportation to supply commercial-grade, coinless equipment, including standard and industrial washers and dryers as well as stackable units. Key performance requirements include quarterly preventative maintenance, a 12-hour acknowledgment for service requests, a 24-hour on-site inspection window, a 72-hour repair ceiling, and a five-calendar-day turnaround for equipment replacement or relocation. The contract structure consists of a base period from December 4, 2026, to December 3, 2027, with multiple option periods extending through December 3, 2031. Award will be granted to the responsible offeror whose proposal is most advantageous to the Government, with price, technical capability, and past performance weighted equally. Technical eligibility requires an Acceptable rating, specifically regarding the ability to meet delivery dates and provide a transition schedule 30 days prior to the start date. Proposals must be submitted in three distinct volumes: Technical (20-page limit), Price, and Past Performance (8-page limit). Invoicing is managed electronically via the Wide Area WorkFlow system. Security requirements mandate that the contractor maintain a validated list of personnel and ensure all staff obtain necessary base access identification.
Consumer Electronics and Appliances Rental

POSTED

about 20 hours ago

DEADLINE

in 1 day
View Details
NAICS: 332312
New
Federal
Environmental Control Work Booth/ Sanding Booth.
Solicitation # FA480027Q0005
The 633rd Contracting Squadron at Langley Air Force Base is conducting market research via a Sources Sought notice to identify capable companies for the procurement of an Environmental Control Work Booth/Sanding Booth. This self-contained system will be used for sanding and preparing aircraft components at the 1st Fighter Wing's Low Observable Consolidated hangar at Joint Base Langley-Eustis. The booth must measure 22 feet wide, 8 feet deep, and 8 feet high, featuring two 15 hp motors rated at 20,000 cfm and a filtration system consisting of 24 flame retardant Nanofiber cartridge filters and HEPA afterfilters capable of collecting hexavalent chromium particulate. The system must integrate with 600V power, fire suppress water lines, and direct air lines provided by the MAC contractor. This is currently a Request for Information and not a formal solicitation. Interested small businesses under NAICS 332312 are invited to provide feedback on the Statement of Requirements and the feasibility of a 12 to 14 week delivery timeline. A site visit is scheduled for November 3, 2026, at 2:00 PM EST, requiring attendees to wear OSHA-approved hard hats and reflective vests. Responses must be submitted on company letterhead via email to Kelly Voigts by November 13, 2026. Final delivery of the equipment is expected on or before February 5, 2027.
Fabricated Structural Metal Manufacturing

POSTED

about 20 hours ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS