Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on November 9, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BOLIVAR DAM, MUSKINGUM RIVER BASIN, OHIO - MAJOR REHABILITATION PROJECT

Closed
W91237-13-R-SS01Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 18 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 18 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 18 hours ago

DEADLINE

in about 12 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 18 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 23 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Bolivar Dam 11614 Glen Park Road N.E., BOLIVAR, OH, 44612-9521, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts1 person available
OfficeHUNTINGTON, WV, 25701-5000, USA
Office AddressHUNTINGTON, WV, 25701-5000, USA
Contacts
Richard D. HortonContract Specialist

Full Description

Show more
SOURCES SOUGHT. This is not a solicitation announcement. The U.S. Army Corps of Engineers, Huntington District, is seeking preliminary marketing information from capable and reliable sources. This includes potential qualified small business sources such as 8(a), HUBZone, small disadvantaged and service-disabled veteran-owned businesses relative to North American Industrial Classification System code 237990, which has a size standard of $33.5 million in average annual receipts. The magnitude of construction for this acquisition is between $25,000,000.00 and $100,000,000.00. The project construction includes a base contract plus one (1) option. The Base Contract consists of the construction of a partial-depth seepage barrier approximately 4,500 ft. in length and a maximum depth of 145 ft. through the upstream slope of the dam embankment terminating in the left abutment. Option 1 consists of the construction of a grout curtain approximately 329 ft. in length by 60 ft. average depth in the left abutment of the dam from the end of the seepage barrier to near the emergency spillway. Responses shall include a qualifications statement along with documentation to support Technical Capabilities and Specialized Experience for the following: 1. Seepage Barrier - The seepage barrier shall be a minimum of 24 inches wide through the entire length and depth, have an in-place permeability of less than 1 x 10-6 cm/sec at 28 days, and a minimum unconfined compressive strength of 750 pounds per square inch (psi) at 28 days. The completed seepage barrier shall be continuous and homogeneous, produced by either mix-in-place or excavation and replacement method. The seepage barrier will be installed through the dam embankment and into foundation materials of dense glacial outwash deposits consisting of sands, gravels, frequent presence of cobble zones and silt zones and small boulder instances, and high permeability open-work gravel/cobble zones. The seepage barrier will be partial-depth for a majority of its length, founded in fine to coarse grained silty sand with intermittent gravel zones, and terminate in the left abutment of the dam where the barrier will be constructed in hard sedimentary rock with unconfined compressive strengths ranging from under 1,000 to over 30,000 psi. The integrity of the existing dam must be maintained throughout the construction process and procedures developed for addressing emergency situations such as sudden slurry loss, excavation trench collapse, encountering boulders and open-work gravel/cobble zones. 2. Seepage Barrier Quality Control and Verification- A Quality Control (QC) program will be required for proving and documenting that the minimum dimensions, continuity, homogeneity, strength, permeability, and quality requirements of the seepage barrier have been achieved. Quality control methods will ensure conformance with specifications, assure full-depth barrier continuity, and include verification borings and video camera surveillance of the in-place barrier backfill of the seepage barrier. Three-dimensional digital drawings, clear QC data presentation methods, and a dedicated staff for data collection, reduction and transmission to the Government will be required. 3. Drilling and Grouting - An option for a double line grout curtain will consist of drilling, pressure testing and grouting of the bedrock located at the left dam abutment. Grout holes will be drilled at various orientations and inclinations. Temporary casing will be installed through soil materials and sealed with grout at the base of the casing. Grout holes will be drilled through casing and into bedrock, consisting of various sedimentary rocks types that have strengths ranging from under 1,000 to over 30,000 psi (unconfined compressive strength). The grout holes will be washed and pressure tested to determine if grouting is required. Balanced and stabilized grout mixes will be developed, mixed, delivered and injected into the grout holes, such as to seal all open features within the bedrock and significantly reduce groundwater seepage. Injected air and fluid pressures during drilling, pressure testing and grouting operations will be controlled to prevent damage by hydrofracturing of the bedrock and overlying soil. Pressure testing and grouting will be monitored using automated, real-time and computer-aided data acquisition systems. Additionally, contractors are requested to provide the following Past Performance information: A list of relevant projects, current and/or completed, in the past five years that best demonstrates competence with this type of work; include dates, locations, types of contracts, dollar amounts/values, description of the work and references. No basis for claim against the Government shall arise as a result of a response to this sources sought or Government use of any information provided. The Government will not pay for information or comments provided and will not recognize any costs associated with submission of comments. Responses to this sources sought announcement must include the contractor's small business status (if applicable) such as 8(a), HUBZone, etc. Contractors are hereby encouraged to make known their interest in this type of work. All responsible sources may respond to this notice and all responses will be considered. Telephonic responses will not be honored. This is only a Request for Information. No award will result from this Sources Sought. Please email or fax your qualification statement to richard.d.horton@usace.army.mil, fax: (304) 399-5281 by close of business of November 21, 2012.

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 237990
New
Federal
Winfield Locks and Dam Major Rehab Industry Day
Solicitation # W91237-27-SN-0001
The Winfield Locks and Dam Major Rehabilitation Project, managed by the U.S. Army Corps of Engineers Huntington District, is a comprehensive infrastructure modernization effort designed to extend the facility's operational life by 50 years. The scope of work includes the full replacement of five standard roller gates and one specialized flap gate, along with the rehabilitation of 1930s-era electro-mechanical drive systems. Critical structural repairs involve replacing the post-tensioned Tainter Gate anchorage system due to stress corrosion cracking and proactively replacing the Main Lock Miter Gate anchorages. Additionally, the project encompasses the replacement of the Dam Service Bridge, modernization of electrical service distribution and SCADA systems, and the replacement of worn components within the Main Lock Emergency Gate Machinery. To facilitate this effort, an Industry Day event is scheduled for November 02, 2026, featuring a presentation at the Winfield Community Center and a site walkthrough at the Winfield Locks and Dam. Interested prime contractors and subcontractors must register by November 01, 2026, at 12:00 PM Noon. The event includes opportunities for in-person one-on-one meetings for prime contractors on the day of the event, with virtual sessions available for all partners starting November 03, 2026. Technical requirements for the project include strict adherence to ASTM A578 for ultrasonic inspections of plates and AWS D1.5 for reinforcing fillet welds, with specific performance testing required for bar anchor installations.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in 11 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS