This Solicitation opportunity from Department Of Defense was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
BOLT, MACHINE
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Solicitation SPE4A6-26-T-37QJ is a fixed-price request for quotations issued by the DLA Aviation ASC Commodities Division for the procurement of 162 self-locking machine bolts (NSN 5306-01-301-7793). The items are designated as Army Identified Critical Safety Items, requiring source inspection and strict adherence to quality standards, including SAE AS9100 compliance and CMMC Level 2 cybersecurity certification. Delivery is required within 732 days after order, with an original required delivery date of March 8, 2029, and is established as FOB Origin. The contract mandates a rigorous testing regime, beginning with First Article Testing (FAT) of one unit, for which a test report must be submitted within 45 calendar days of the contract date. Following FAT approval, Production Lot Testing (PLT) is required to validate quality conformance, with samples shipped to the Redstone Technical Test Center. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, and all payment requests must be processed electronically via the Wide Area WorkFlow system. Offerors must also comply with the Buy American Act and the Berry Amendment regarding domestic material sourcing.
General Info
Place of Performance
2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
‘OTHER EQUIVALENT' AND PROVIDE DETAILS OF CURRENT DEALER/DISTRIBUTOR
CERTIFICATION AND/OR ACCREDITATION.
Fast Pay does not apply to this solicitation
FIRST ARTICLE APPROVAL – CONTRACTOR TESTING REQUIRED (FAR 52.209-3 and ALT I)
THE CONTRACTOR SHALL TEST 1 UNIT(S) OF LOT/ITEM 5306 / 13017793 AS SPECIFIED IN THIS CONTRACT. PROVIDE WRITTEN NOTICE TO THE CONTRACTING OFFICER AND THE QAR AT LEAST FOURTEEN (14) CALENDAR DAYS PRIOR TO SHIPMENT TO GOVERNMENT FOR FAT, TO ACCOMODATE IN-PROCESS VERIFICATION AND/OR FINAL INSPECTION BY THE QAR. THE CONTRACTOR SHALL SUBMIT THE FIRST ARTICLE TEST REPORT WITHIN 45 CALENDAR DAYS FROM THE DATE OF THIS CONTRACT. NOTIFICATION AND SUBMITTAL ADDRESSES ARE IAW PROCUREMENT NOTE H03. WITHIN 60 CALENDAR DAYS AFTER THE GOVERNMENT RECEIVES THE TEST REPORT, THE CONTRACTING OFFICER SHALL NOTIFY THE CONTRACTOR, IN WRITING, OF THE CONDITIONAL APPROVAL, APPROVAL, OR DISAPPROVAL OF THE FIRST ARTICLE. SEE PROCUREMENT NOTE H03: SUPPLEMENTAL FIRST ARTICLE TESTTING REQUIREMENTS (SEP 2016) FOR ADDITIONAL FAT REQUIREMENTS.
DISPOSITION OF FAT UNITS IAW PARAGRAPH (e) OF FAR 52.209-3 OR 52.209-4.
Procurement Note E04: Production Lot Testing – Government (MAY 2020)
(1) The purpose of production lot testing (PLT) is to validate quality conformance of products. PLT is to be completed on the production lot(s) after First Article approval, when a first article is required. The contractor shall price the PLT CLIN to cover the cost of the approved samples that are consumed, destroyed or otherwise rendered unusable during testing.
(2) The contractor shall provide written notice to the contracting officer and the QAR at least fourteen (14) calendar days (or as otherwise specified in the contract) prior to the date when the contractor will present the production lot to the QAR for selection of PLT samples.
(3) The QAR will select 1 samples, at random from the production lot(s) produced. If the quantity stated in the previous sentence equals "ZZ", the contractor should use the appropriate sample size identified within the Technical Data Package or applicable Sample Plan provided by the Government. The contractor will seek approval of the sample size with the QAR.
(4) The contractor shall ship the PLT samples by traceable means to:
RTTC REDSTONE
SPE4A6-26-T-37QJ
SECTION A
W31P0W
REDSTONE ARSENAL
REDSTONE TECHNICAL TEST CENTER
ATTN: CHARLES EAKES
BLDG 4500
REDSTONE ARSENAL
AL
35898
Shipment shall be marked “Production lot samples – do not post to stock”, contract and lot number. A copy of the DD250/IRAPT Receiving Report shall be placed on the exterior of the shipping container in accordance with MIL STD 129. Include the following interior documentation: DD Form 1222 and DD250/IRAPT receiving report signed by the QAR, copy of contract/order, copies of test reports showing actual results and tolerances specified in the technical data package, material and process certifications, process operations and inspection method sheets, copies of drawings used to manufacture the PLT sample (proper marking to assert proprietary or other rights to restrict public disclosure is the contractor’s responsibility), documents required under contract deliverables requirements list, a prepaid shipping label or document with the information required to return the PLT samples to the contractor at no cost to the Government.
(5) At time of shipment, copies of the signed DD Form 1222, DD250/IRAPT Receiving Report, transportation tracking information and information for return of the PLT samples shall be provided to the contracting officer. The Government testing time will be 90 test plus 90 NSN/Part Number: 5306-01-301-7793 Quantity: 162 EA Purchase Request: 7018169301QTY: 162 Delivery: 732 days ADO
More opportunities from Department Of Defense → ASC COMMODITIES DIVISION
Same awarding agency
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
