Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on September 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Breakpoint Nutrient Reduction Wetland Construction Project

Closed
24-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
Federal
Replace Operating Room 5 Flooring
Solicitation # 36C26327Q0019
Solicitation 36C26327Q0019 is a Service-Disabled Veteran-Owned Small Business set-aside for the Department of Veterans Affairs, Network Contracting Office 23. The project involves providing all labor, materials, tools, and supervision to remove and replace the flooring and subflooring in Operating Room 5 (Room 4211, Building 1W) at the Des Moines VA Medical Center in Iowa. The work must be completed within 120 calendar days following the Notice to Proceed. Award will be granted to the responsible, eligible quoter who submits the lowest-priced acceptable quotation that meets all solicitation requirements, provided the price is determined to be fair and reasonable. Key technical requirements include conducting asbestos survey testing, adhering to the Architectural Design Manual, and utilizing certified installers through INSTALL or a comparable four-year apprenticeship program. The contractor must provide a floor tile mockup of 100 square feet to establish quality standards and comply with strict packaging and marking regulations for asbestos waste and HEPA filters. Administrative requirements include the submission of an Accident Prevention Plan and Site-specific Safety Plan for COR approval, as well as the provision of payment bonds or irrevocable letters of credit for contracts exceeding 35,000 dollars. The contract is subject to the Davis-Bacon Act and Buy American requirements, with specific limitations on subcontracting to ensure a minimum of 15 percent of the work is performed by the prime SDVOSB contractor.
Network Contract Office 23 (36C263)

POSTED

about 15 hours ago

DEADLINE

in 7 days
NAICS: 238330
New
SLED
Green ES Multi Purpose Floor, Wall Replacement/Repair and Paint - Open to contracted pre-qualified pool for VARIOUS TRADES ONLY
Solicitation # 26-1471
Chicago Public Schools is soliciting bids for the Green ES Multi Purpose Floor, Wall Replacement/Repair and Paint project, which is open to their contracted pre-qualified pool for various trades. The scope of work includes providing all labor and materials for flooring and wall repairs, specifically the installation of VCT tile flooring followed by the application of six coats of high solid vinyl wax coating. Contractors must ensure that resilient flooring remains free of traffic for 48 hours post-installation and must provide written certification from both the flooring and adhesive manufacturers confirming the subfloor is acceptable before installation begins. Bids must be submitted electronically via EUNA/Bonfire by November 5, 2026, at 8:00 PM. Public bid readings will be conducted via Google Meet. Depending on the bid price, specific requirements apply: a 5% bid bond and union signatory status are required for bids of $25,000 or more, payment and performance bond premiums must be included for bids of $50,000 or more, and MBE/WBE documentation is mandatory for bids of $75,000 or more. All work must comply with 2010 ADA Standards for Accessible Design and the Chicago Building Code. Onsite coordination is managed by Stationary Engineer Michael Bliss and Zone Chief Michael Berry. Materials must be delivered in sealed, labeled containers and stored between 45 and 90 degrees Fahrenheit to prevent freezing.
Chicago Public Schools

POSTED

1 day ago

DEADLINE

in 9 days

General Info

Place of Performance

IA, USA

Set-Aside

NONE

Documents

9

Bid 24-06: Buc871015D Nutrient Reduction Wetland Pre-Bid Minutes

PDF, High priority: read this firstq-and-a
High

Bid No. 24-06: Buc871015D Nutrient Reduction Wetland Project

PDF, High priority: read this firstifb
High

Buc871015D Nutrient Reduction Wetland Project Notice-to-Bidders

PDF, High priority: read this firstitb
High

Buc871015D Nutrient Reduction Wetland Project - Proposal and Schedule of Prices

PDF, High priority: read this firstrfb
High

BUC871015D Nutrient Reduction Wetland - Sheet List

PDF, High priority: read this firstspecifications
High

BUC871015D Wetland Construction Specifications - Buchanan County, Iowa

PDF, High priority: read this firstspecifications
High

Dick Sloan Wetland BUC871015D - Storm Water Calculations

PDF, High priority: read this firstspecifications
High

EX01 Existing Tile Map - Buchanan County, Iowa

PDF, High priority: read this first1 page · specifications
High

Sloan Pond and Wetland (BUC 871015D) Geotechnical Engineering Report

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa Agriculture and Land Stewardship
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
This project is for a traditional breakpoint nutrient reduction wetland. In general, the work involves, but is not limited to, selective clearing, excavation, grading, steel sheet pile weir construction, tile installation, water control structures and seeding. This project includes around 40,920 cubic yards of earthwork, 1,094 square feet of steel sheet pile, 5,500 linear feet of tile installation, 1,098 tons of riprap, 198 cubic yards of concrete grout, 14.7 acres of seeding and a water control structure. The estimated construction cost range for this project is $500,000 to $600,000. Completion Dates: Construction-June 1, 2025; Structure seeding-May 15, 2025; Buffer seeding June 30, 2025.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS