This Government Contract opportunity from Department Of Defense was posted on September 20, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BREVARD COUNTY, FLORIDA - SHORE PROTECTION PROJECT

Awarded
GROUP1-18-R-J003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Pennsauken Community Pool Improvements
Solicitation # 2026-BID-15
The Township of Pennsauken, New Jersey, is soliciting bids for the complete rehabilitation and improvement of the Pennsauken Community Pool under solicitation number 2026-BID-15. The scope of work includes significant structural improvements to the pool, the demolition and construction of the pool mechanical room, electrical upgrades, and the installation of plumbing and other general complex upgrades. Specific deliverables include reinforced concrete flooring and walls, sandblasting the pool interior, and the installation of two 25 by 25 foot shade structures. All work must adhere to the 2019 NJDOT Standard Specifications for Road and Bridge Construction, the Americans with Disabilities Act of 1990, and New Jersey Prevailing Wage Act requirements. Bids must be submitted electronically via the OpenGov Procurement Portal by November 10, 2026, at 10:30 AM. The contract will be awarded to the lowest qualified responsible bidder. Submission requirements include a bid bond of 10 percent not to exceed 20,000 dollars, a notarized Non-Collusion Affidavit, a Certificate of Non-Debarment, and signed acknowledgments for Addenda 01 and 02. The successful contractor must provide a performance bond within three days of the contract award. The initial contract period is one year, with a possible one-year extension upon mutual agreement. Payment will be processed through the Township Governing Body following certification by the Township Engineer and the submission of itemized invoices and certified payrolls.
Procurement

POSTED

about 14 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

The Brevard County Shore Protection Project is a beach restoration and renourishment effort in Florida managed by the U.S. Army Corps of Engineers, Jacksonville District. The project involves the placement of beach-compatible material along 16 miles of coastline, divided into three segments: the Mid-Reach (7.8 miles), the South Reach (3.8 miles), and an option bid for the Patrick Air Force Base segment (3.7 miles). Work includes hydraulic and mechanical placement of sediment, turbidity monitoring, endangered species observation, marine turtle nesting surveys, and the removal of derelict concrete rubble. To facilitate these efforts, Memoranda of Agreement authorize the extraction of up to 1.9 million cubic yards of sand from the Canaveral Shoals II Borrow Area. This opportunity is restricted to contractors previously awarded contracts under solicitation W912EP18R0029, Group 1 - Unrestricted. The estimated magnitude of construction is between 25 million and 35 million dollars, with awards determined based on the Lowest Price Technically Acceptable (LPTA) criteria, focusing on price, past performance, and the availability of acceptable plant and equipment. Contractors must adhere to strict environmental monitoring and security protocols, particularly for work conducted at Patrick Air Force Base, which requires specific personnel access clearances and coordination with base civil engineering.

General Info

Contract Value

$48,176,861.4

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL, USA

Set-Aside

NONE

Award Issued Date

Documents

27

Base Civil Engineering Work Clearance Request

PDF, High priority: read this firstwork-clearance-request
High

Brevard Mid and South Reach 2019 Geotechnical Data Report

PDF, High priority: read this firstgeotechnical-data-report
High

Draft Memorandum of Agreement for Brevard Mid-South Reach Shore Protection Project

PDF, High priority: read this firstmemorandum-of-agreement
High

Draft Memorandum of Agreement for Use of OCS Sand Resources at Patrick Air Force Base

PDF, High priority: read this firstmemorandum-of-agreement
High

G1J003 Shore Protection Project Specs Revision 0005 Dated 23 Aug 2019

PDF, High priority: read this firstspecifications
High

GROUP1-18-R-J003 Brevard County FY19 Revision 0002 Plans

PDF, High priority: read this firstplans
High

GROUP1-18-R-J003 Brevard Mid-South Reach Construction Baseline Plans Part 2 of 5

PDF, High priority: read this firstspecifications
High

GROUP1-18-R-J003 Brevard Mid-South Reach Plans Part 1 of 5

PDF, High priority: read this firstspecifications
High

GROUP1-18-R-J003 Brevard Mid-South Reach Plans Part 3 of 5

PDF, High priority: read this firstspecifications
High

GROUP1-18-R-J003 Brevard Mid-South Reach Plans Part 4 of 5

PDF, High priority: read this firstspecifications
High

GROUP1-18-R-J003 Brevard Mid-South Reach Plans Part 5 of 5

PDF, High priority: read this firstspecifications
High

GROUP1-18-R-J003 Brevard Mid-South Reach RTA 2019 Task Order Line Items and Pricing

PDF, High priority: read this firsttask-order-award
High

GROUP1-18-R-J003 Brevard Mid-South Reach RTA 2019 Task Order Specs

PDF, High priority: read this firsttask-order-award
High

GROUP1-18-R-J003 Brevard Mid-South Reach Specs Revision 0001 July 22

PDF, High priority: read this firstmodification
High

GROUP1-18-R-J003 Brevard Mid-South Reach Specs Revision 0003

PDF, High priority: read this firstamendment
High

Revision 0004 - Shore Protection Project Beach Restoration Specs

PDF, High priority: read this firstamendment
High

SF30 Amendment 0002 for GROUP1-18-R-J003 Shore Protection Project

PDF, High priority: read this firstamendment
High

45 SFS Badge/Visitor Request Form

PDF, Low priorityform
Low

Brevard County FY19 Mid Reach Plans Revision 0005

PDF, Low priorityother
Low

Brevard County FY19 Plans Revision 0001

PDF, Low prioritycontract-document
Low

GROUP1-18-R-J003 Brevard Mid-South Reach Plans Revision 0003

PDF, Low priorityplans
Low

GROUP1-18-R-J003 Brevard Mid-South Reach Plans Revision 0004

PDF, Low priorityother
Low

PAFB Access Restrictions

PDF, Low priorityother
Low

Survey_18-060.zip

ZIP

Survey_18-141.zip

ZIP

Survey_18-237.zip

ZIP

Survey_19-010.zip

ZIP

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 20, 2019 to Aug 27, 2019. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts
William WallaceContract Specialist
Timothy HumphreyContract Specialist

Full Description

Show more
NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER W912EP18R0029, GROUP 1 - UNRESTRICTED: Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc. (W912EP19D0029); Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc. (W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034); The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037). PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED DREDGING MATOC POOL. A Pre-Proposal Conference will be held on 8 August 2019 @ 10:00am, Local Time via teleconference. The call-in number is: +1 (555) 000-0000, the ACCESS CODE is: 6546236, and the SECURITY CODE is: 5480. It is requested that an email be sent to contact@example.gov to confirm attendance by your organization. DESCRIPTION OF WORK: Project consists of placement of beach compatible material along 16 miles coastline in Brevard County Florida. The project is broken into three segments: Mid-Reach, South Reach, and Patrick Air Force Base (PAFB). Mid-Reach and South Reach segments are the base bid and PAFB segment is the option bid item. The Contractor shall also conduct turbidity monitoring at the beach fill site, endangered species observers and monitoring aboard the dredge, night-time surveys for marine turtle nesting, collection and analysis of as-built sediment samples, and related tasks described and detailed in these specifications. The Mid-Reach project is a 7.8 mile beach fill project and between FDEP Monuments R-75.4 and R-118.3 ending just north of the Town of Indialantic. Hydraulic placement within Mid-Reach is prohibited. Beach quality sediment can be attained from a South-Reach beach stock pile area as shown on the plans, or approved upland sources. The South Reach stockpile area is constructed for the purpose of supplying sand to the Mid-Reach placement area, and is approximately 8 miles south of the Mid-Reach placement site with a maximum and minimum distance of 11.6 miles and 4 miles, respectively. The stockpile area can be hydraulically filled and then mechanically transferred to the placement area along Highway A1A only. Once delivered to the Mid-Reach sand will be offloaded at construction access/staging areas before being distributed by off road dump truck. After the truck haul is completed, a residual beach fill will be constructed within the entire stockpile area as shown on the drawings. The Contractor has an option of obtaining 80,000 CY from Contracting Officer approved upland sand sources containing beach quality sand meeting these specifications. For the plans, the feature identifier precedes the discipline designator in the drawing number as A. The South Reach is a 3.8 mile long project between R-monuments R-118.3 and R-139. The placement of material will be uniform alongshore in accordance with the elevations and slopes indicated on the drawings and can be constructed using conventional hydraulic placement. For the plans, the feature identifier precedes the discipline designator in the drawing number as B. PAFB is a 3.7 mile long beach fill project between FDEP range monuments R- 55 and R-75.4. The northern 1.9 mile PAFB segment (R-55 to R-65) can be hydraulically place. Hydraulic placement south of R-65 to R-75.4 cannot occur due to the presence of emergent nearshore rock outcrops. Therefore, a stockpile area on the beach is provided between R-61 to R-65 which can be hydraulically stockpiled with up to 90,000 CY being stored. The stored material can then be mechanically transferred via truck haul on the beach or A1A to place approximately 115,000 CY as beach and dune fill between R-65 and R-75.4 and to install native dune plants, and to remove exposed derelict concrete rubble. The use of upland mine for a sediment source is prohibited. For the plans, the feature identifier precedes the discipline designator in the drawing number as C. MAGNITUDE OF CONSTRUCTION: Between $25,000,000 and $35,000,000. The request for proposal will be issued on or about 19 July 2019 and proposals will be due on or about 29 August 2019. The award of the task order will be made on the basis of Lowest Price Technical Acceptable (LPTA). The technical evaluation factors are availability of technically acceptable plant and equipment that meet the requirement of the Notice of Intent and Past Performance previously submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029). See attached request for proposal for submission requirements. The Request for Proposal will be issued in electronic format only and will be posted on the Federal Business Opportunities website (Fed Biz Opps) at https://www.fbo.gov. In order to receive notification of any issued amendments, interested parties must register as an interested vendor on the Federal Business Opportunities website at http://www.fedbizopps.gov/. Please be advised, if you are not registered, the Government is not responsible for providing you with notification to any changes to this solicitation. You must be registered in the System for Award Management (SAM) in order to be eligible to receive an award from this solicitation. For additional information, please call +1 (555) 000-0000 or visit the SAM website at https://www.sam.gov/.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

3 days ago

DEADLINE

in 12 days
View Details
NAICS: 237990
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS