Bridge Expansion Joint Replacement (Preformed Silicone Foam Systems)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract involves the complete replacement of existing bridge expansion joints with new preformed silicone-coated foam systems, strictly following WVDOH Section 627 specifications. This includes the careful removal of all current joints, thorough preparation of the joint openings to ensure proper adhesion and performance, and the precise installation of the new silicone-coated foam systems designed to accommodate thermal movement while providing durability and weather resistance. The work must be executed with attention to structural integrity and long-term functionality to meet state transportation standards. This subcontract is issued by the West Virginia Department of Transportation and is set to be performed in Wayne, West Virginia. The solicitation was posted on August 11, 2026, with the same date set as the response deadline, indicating a simultaneous posting and closing timeline. The North American Industry Classification System code 238990 classifies this as other heavy and civil engineering construction activity, reflecting the specialized nature of the work. The contract will be managed under the state’s infrastructure maintenance and bridge rehabilitation program, with all materials and methods required to conform to WVDOH technical guidelines to ensure compliance and safety.
General Info
Agency
NAICS
Place of Performance
Wayne, WV, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
