This Solicitation opportunity from New York was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Brooklyn Bridge Park Pier 1 Pavilion Stair Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Brooklyn Bridge Park is seeking proposals from a general contractor for the stair replacement project at the Pier 1 Pavilion located at 20 Furman Street. The project involves the remediation of three sets of stairs that currently feature inconsistent tread and riser dimensions. The selected contractor will be responsible for removing and chipping out existing concrete to expose and evaluate rebar, replacing rebar as necessary, constructing formwork, and pouring new concrete to ensure full compliance with BC 1011.5.4 requirements. This solicitation, identified by number 20260909003, was posted on September 15, 2026, with a response deadline of October 5, 2026. Interested parties should direct inquiries and proposals to the primary point of contact, John Zhang, via the provided agency email.
General Info
Place of Performance
Not specifiedSet-Aside
Documents
0No documents available
Documents will appear here when they are available.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Brooklyn Bridge Park (the Park) is an eighty-five (85) acre waterfront park in Brooklyn, NY. The Pier 1 Pavilion (20 Furman Street) is the newest addition to the Park and has three (3) sets of stairs that require remediation due to inconsistent stair tread & riser dimensions. The Park is seeking proposals for a general contractor to remove and chip out all existing concrete to expose the rebar, verify the condition of the rebar and replace if needed, create formwork to pour new concrete, and verify that the newly poured stairs comply with the requirements of BC 1011.5.4.
PIN: BBP Pier 1 Pavilion
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
