Brookside Cottages Emergency Sleeping Shelters, Project No. WH148A, CP#25-24
Forecast
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Documents
0No documents available
Documents will appear here when they are available.
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Get what you need to respond
No documents were posted with this contract.
- Buyer contactEmail and phone
- Original solicitationLink to the source posting
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
PhaseForecast
Posted
forecast
Organization & Contact Information
Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → Contra Costa County
Office AddressN/A
Contacts
Christian MontoyaProject Manager
Syd SotoodehSenior Planner
Full Description
Show more
The Brookside Modular Housing (project) consists of the construction of non-congregate emergency sleeping shelters that will serve as a “Low-Barrier Navigation Center”, which utilizes a Housing First approach that provides temporary living facilities while case managers connect individuals experiencing homelessness to income, public benefits, health services, shelter, and housing.
The proposed project will add a total of approximately 42 prefabricated emergency sleeping shelters that will be either single occupant units (approximately 70 square feet) or double occupant units (approximately 120 square feet). Each shelter will have an asphalt concrete pavement foundation alongside an additional concrete pedestrian walkway, sidewalk, curb ramp and other Americans with Disabilities Act (ADA) improvements. Site improvements such as lighting, native drought-resistant landscaping, signs, fencing, gates, parking, and site furnishings (i.e., tables, benches, trash cans, and bicycle racks) will be installed. Electrical, security, and fire alarm systems will also be added and two monitoring wells will be cleaned, filled, and abandoned in-place.
The proposed project will be constructed in two phases. Phase I will implement construction of approximately 22 prefabricated shelters (18 single and 4 double occupant units); pedestrian, ADA, and site improvements; electrical, security, and fire alarm systems; utility extensions; in-place well abandonment; a new concrete pad for PG&E utility equipment; and general grading, paving, and off-haul of excess soil. Phase II will implement construction of approximately 20 additional prefabricated shelters; two prefabricated accessible toilet and shower units; an approximately 400-square-foot prefabricated community space with two offices for support staff; additional landscaping and site furnishings; and a trash enclosure.
Construction for Phase I and Phase II is anticipated to begin in October 2027 and March 2029, respectively. Construction is anticipated to take approximately 180 working days for completion of each phase. Utility relocations may be necessary to support this project. Utility connections to existing water, electrical, and storm drain lines in the project area will be required. Ground disturbance and excavations to a maximum depth of 6 feet are anticipated for utility trenching. Vegetation trimming and removal is anticipated. Appropriate Best Management Practices for water pollution control will be implemented. Emergency vehicles will have access at all times.
More opportunities from California → Contra Costa County
Same awarding agency
Research this forecast and prepare for the solicitation
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
