Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on March 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Brown Farm Agricultural Best Management Practice Installation

Closed
Gulich Township, Clearfield CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days for substantial completion. The contract is administered by the City of Belmont with Willis Engineers serving as the project engineer. Award will be granted to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on the submission of required MWBE documentation, including the Good Faith Efforts Form and Table A. Bidders must adhere to strict material standards, specifically using Class 250 ductile iron pipe with Protecto 401 lining. Contractual requirements include the provision of performance and payment bonds, proof of insurance, and compliance with EJCDC standard general and supplementary conditions. Payment is processed via Applications for Payment, with funds becoming due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including resurfacing, restoration, and the installation of FRP reinforcing systems and access hatches. Mechanical and infrastructure requirements include the relining, modification, or replacement of steel and ductile iron pipes, installation of valves and piping appurtenances, modifications to sluice gates, and the installation of new slide gates and access platforms. Additionally, the project requires the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, and extensive electrical and instrumentation upgrades, including motor control center component replacement. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid. Requested quotes for services and supplies, including lead abatement, metals fabrication, painting, and trucking, are due by November 17, 2026, ahead of the project bid date on November 18, 2026. Any exceptions to standard subcontract documents must be submitted as redlines along with the quote.
Garney Pacific, Inc.

POSTED

about 6 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This contract involves the installation of agricultural and soil best management practices on a property in Gulich Township, Clearfield County, Pennsylvania. The project scope includes construction of fencing, waterline installation, watering facilities, and stabilized heavy use areas for animals. The project owner is the Clearfield County Conservation District (CCCD), with Herbert, Rowland & Grubic Inc. (HRG) serving as the project consultant responsible for managing construction and coordinating project activities. Funding is provided by the Pennsylvania Department of Environmental Protection and the State Conservation Commission, making the project subject to Prevailing Wage requirements. Work must commence by May 30, 2026, achieve substantial completion by November 6, 2026, and be fully completed by November 25, 2026. Bidders must attend a mandatory on-site meeting on April 14, 2025, at the project location, with proposals due by May 7, 2026. A 5% bid bond is required for submission, and the selected contractor will need to provide performance and materials payment bonds. Insurance coverage is mandated with minimum liability limits, naming CCCD, HRG, and the property owners as additional insured. Bids will be evaluated based on price, qualifications, completeness, and mandatory attendance at the site meeting. Contractors must demonstrate experience on similar agricultural BMP projects in Pennsylvania, adhering to USDA-NRCS technical standards. The contract includes requirements for compliance with prevailing wage laws, submission of weekly wage reports, and prohibits awarding the contract to bidders debarred for wage violations. All project administration, including invoice approvals, will be handled by HRG on behalf of CCCD.

General Info

Install agricultural BMPs in Clearfield County by Nov 2026; prevailing wage; mandatory site meeting April 2025.

Place of Performance

Clearfield County, PA, USA

Set-Aside

NONE

Documents

5

2025.08.14 Brown Farm Final Plan Set STAMPED

PDF, High priority: read this firstspecifications
High

26-02541 Brown Farm Agricultural BMP Installation - Prevailing Wage Rates

PDF, High priority: read this firstwage-determination
High

Brown Farm Agricultural BMP Installation - Invite to Bid

PDF, High priority: read this firstitb
High

Brown Farm Design Report - Clearfield County Conservation District

PDF, High priority: read this firstspecifications
High

Weekly Payroll Certification for Public Works Projects (LLC-25)

PDF, Low prioritywage-determination
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Clearfield County
ContactsNo contacts available
OfficeClearfield County, PA, USA
Office AddressClearfield County, PA, USA
ContactsNo contact information available

Interested Companies (36)

Sample Development
Gov AlphaBrooklyn, New York
Zawada Enterprises

See All 36 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Project Summary Installation of agricultural and soil best management practices. The scope of the project includes the installation of fencing, waterline, watering facilities, and stabilized animal heavy use areas.
PROJECT OWNER Clearfield County Conservation District (CCCD) 6395 Clearfield Woodland Highway, Suite 2 Clearfield, PA 16830
PROJECT CONSULTANT Herbert, Rowland & Grubic Inc. (HRG) 220 West Kensinger Drive, Suite 100 Cranberry Township, PA 16066
BIDS DUE 5/7/2026
SITE MEETING A mandatory bidders’ meeting will be held on site on 4/14/2025 at 9:30 AM Site Address: 1145 Viola Pike, Smithmill, PA 16680 Geographic coordinates: 40.75532, -78.41242 Proposals will not be accepted from Bidders that don’t attend the Site Meeting. Each Bidder must sign in at the Site Meeting to verify attendance.
SITE PLANS Plans will be made available to bidders at https://pennbid.bonfirehub.com/ and also the pre-bid meeting.
INSURANCE The chosen contractor will provide a Certificate of Insurance showing a minimum of $2 million in general liability, $1 million in automobile liability, and workman’s compensation insurance. CCCD, HRG, Molly and Dakota Brown to be named as additional insured.
BONDING A 5% bid bond is required. The contractor awarded the bid will be required to post a performance and materials payment bond.
FUNDING This project is funded by the Pennsylvania Department of Environmental Protection (PADEP) and the State Conservation Commission (SCC) and is subject to Prevailing Wage requirements.
PROJECT TIMELINE Work must begin by 5/30/2026 Substantial completion of the project by 11/6/2026 Final completion by 11/25/2026.
Location The project site is located in Gulich Township Clearfield County. Access to the site will be from the landowner’s private drive at 1145 Viola Pike, Smithmill, PA 16066.
Geographic coordinates of project location: 40.75532, -78.41242
Project Management The property affected by the project is owned by Molly and Dakota Brown. The project owner is Clearfield County Conservation District (CCCD) who funded the project with grants from the Pennsylvania Department of Environmental Protection and State Conservation Commission . All funding is in place. The selected Contractor will enter into a contract with CCCD. HRG is the CCCD’s consultant for the project and is responsible for managing construction activities, project coordination, and approval of invoices for payment.
Points of Clarification and Corrections Any questions or comments must be submitted by 5/1/2026 at noon to the Clearfield County Conservation District. Phone inquiries will not be accepted.
Bonding A 5% bid bond is required. A certified check is acceptable. The chosen Contractor will provide the CCCD with a Performance and Materials Payment Bond. The Contractor is responsible for securing all road bonds necessary to complete the project.
Evaluation of Bids and Award of Contract Bids will be evaluated based on bid price, qualifications and experience, attendance at the pre-bid meeting, and bid completeness. A complete bid includes: a complete detailed bid form, statement of qualifications, 5% bid bond, and rate sheet. The CCCD reserves the right to reject any or all bids including nonconforming, nonresponsive, unbalanced, incomplete, or conditional bids. CCCD will make the project award to the Contractor deemed lowest responsible bidder based on the evaluation criteria above.
Bidder Qualifications: Attach a one-page description of prior experience on at least three similar projects in Pennsylvania. At least one project should include installation of agricultural Best Management Practices (BMPs) that meet USDA-NRCS PA Tech Guide Standards and Specifications. Include project name, client name and contact information, project location, date of completion and description.
Project Schedule The Project may be started as soon as contracts are signed. Work must begin by 5/30/2026. Substantial completion is 11/6/2026. Date of final completion is 11/25/2026.
Prevailing Wage This project is funded by PADEP and SCC and is subject to Prevailing Wage regulations. The project is registered with the Department of Labor and Industry. A Wage Determination Schedule is included in the Bid Documents and Construction Contract. The chosen Contractor will submit Weekly Wage reports to CCCD that document compliance with Prevailing Wage rules. The CCCD will not award a contract to a Bidder that has been debarred by the PA Dept. of Labor and Industry for noncompliance with the PA Prevailing Wage Act.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS