Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Brown Field Municipal Airport Master Plan Program EIR

Forecast
2025-NOD-0126State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of San Diego

Place of Performance

San Diego, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A

Full Description

Show more
The City of San Diego owns· and operates the Brown Field Municipal Airport (SDM) as a General Aviation (GA) airport located within the Olay Mesa community. Airport planning occurs at the national, state, regional, and local level; and in 2017, the City began developing an Airport Master Plan (Project) to determine the extent, type, and schedule of development needed. An Airport Master Plan presents the community and airport's vision for a 20-year strategic development plan based on the forecast of activity. It is used as a decision-making tool and Is Intended to complement other local and regional plans. The Airport Master Plan consists of a report documenting existing conditions of the airport, a forecast of activity, facility requirements (the airport's needs based on the forecast and compliance with Federal Aviation Administration (FM) Design Standards for airports), development and evaluation of alternatives to meet those needs, and a funding plan for that development. The Airport Master Plan also includes an Airport Layout Plan (ALP) which graphically depicts all planned development at the airport within the 20-year planning period as determined In the Airport Master Plan. This drawing requires approval by the FAA, which makes the airport eligible to receive federal funding for airport Improvements and maintenance under the FAXs Airport Improvement Program. The Project would involve both landside and airslde components. Much of Brown Field has been leased by the City to the proposed developers of the Metro poll tan Airpark Project (MAP), a project which was reviewed previously in a separate EIR (SCH No. 2010071054) and is not part of the scope of this PEIR. The size of the existing terminal building (12,600 SF) Is adequate to serve the projected needs of the Airport. However, due to the age of the building, there are a number of configurations and other environmental Issues for the existing building. Based on City Input and the understanding of the current conditions of the terminal building, the preferred alternative In the AMP proposed the replacement of the terminal building with a larger (approximately 14,000 SF) terminal building In the same location, and the original ATCT would be relocated. However, the terminal building, Including the original ATCT, have been evaluated for their historic potential as described In Section 5.5 of the PEIR. The study concluded that the Integrity of the Auxiliary Naval Air Station Brown Field Historic Dist. and the terminal building (Building 2002) as a contributor to the District are Intact and all resources remain eligible for listing In the SDRHR, the CRHR, and the NRHP. As a result, instead of demolishing the terminal building and moving the ATCT, the currently proposed project Isto be a rehabilitation of the existing building, as defined by the U.S. Secretary of the Interior's Standards for the Treatment of Historic Properties, for use and forecasted demand. All proposed rehabilitation work for the terminal building will need to comply with the U.S. Secretary of the Interior's Standards for the Treatment of Historic Properties. Note that the proposed new Customs facility has received a CEQA exemption and is not part of this Project. The Proposed Airport Plan shows the construction of up to 107 new hangars (111,000 sf); however, the hangars would not be developed by the City until there ls sufficient demand, and net demand may be affected by how fast MAP Is developed, A location for a new wash rack has been Identified at the western end of the airfield, near the proposed western hangar location. Similarly, a location for a new fuel tank has been identified near the terminal building. as well as approximately 83 new automobile parking space vehicle parking spaces adjacent to the western hangar site. Airside Improvements proposed at Brown Field Include a new runup pad (which ls currently lacking for the smaller runway), and would reconfigure several taxiways to bring them into compliance with current FAA design standards.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 11 hours ago

DEADLINE

in 21 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 13 hours ago

DEADLINE

in 25 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS