Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Brushy Creek MUD Raw Water Pond Liner Replacement

Active
6aa7fb5d2319474eea371f16State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Brushy Creek Municipal Utility District in Texas is soliciting bids for the Raw Water Pond Liner Replacement project located in Round Rock. The scope of work involves replacing the existing geomembrane liner within the Water Treatment Facility raw water pond, which has a total storage capacity of 8 million gallons. Interested parties must submit their responses by the deadline of October 1, 2026. Primary inquiries regarding this solicitation should be directed to Amy Giannini. Detailed specifications, including plans and the project manual, are required for a full understanding of the technical requirements.

General Info

Brushy Creek MUD seeks bids for raw water pond liner replacement by October 1, 2026.

Agency

Texas → Brushy Creek Muncipal Utility DistrictView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Round Rock, TX, 78681, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyTexas → Brushy Creek Muncipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
Texas → Brushy Creek Muncipal Utility District
View Agency Profile
Office AddressN/A
Contacts

Full Description

Show more
Raw Water Pond Liner Replacement (project includes replacing the existing geomembrane liner in the existing Water Treatment Facility raw water pond with a total storage of 8 million gallons). See plans and project manual for details.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure initiative managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of various contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as tie-ins between 54 and 145.5 inches. Additional construction requirements include four surge tanks, two valve vaults, an air compressor yard structure, drainage improvements, electrical upgrades, instrumentation and controls, and associated piping systems. The project also encompasses critical civil and site work, including the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation is open to small businesses, including SBA-certified service-disabled veteran-owned small businesses, minority business enterprises, and women business enterprises. James W. Fowler Co. provides specific support for M/W/DBE subcontractors, including assistance with bonding, insurance, lines of credit, and the procurement of equipment and materials. Bids are due by September 29, 2026, with all negotiations required to be finalized 24 hours prior to the bid opening.
James W. Fowler Co.

POSTED

about 2 hours ago

DEADLINE

in 8 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS