Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 15, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BUILDING 910 REMOVE AND REPLACE ACM VINYL TILE/INSTALL NEW CERAMIC TILE FLOOR COVERING IN DINING AREA OF GODFATHER PIZZA BUILDING 2300

Awarded
FA3047-12-T-0011Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238330
New
SLED
Taylor Center - Bresnan Wood Floor Replacement
Solicitation # SRC-MNSU-2027-000651-RFB
Solicitation SRC-MNSU-2027-000651-RFB is a request for bids from the Minnesota State Colleges and Universities System for the replacement of the wood floor at the Taylor Center Bresnan Arena Court at Minnesota State University, Mankato. The scope of work involves the removal and disposal of existing maple flooring, the installation of 25/32” x 2-1/4” 2nd and better grade maple, and the application of a water-based seal and oil modified gloss finish. The selected vendor will also assist in redesigning graphics and game lines and will be responsible for the final cleaning and protection of the entire arena, including the seating area. Any necessary subfloor repairs will be handled on a time and material basis, requiring the vendor to provide an hourly rate in their bid. The project is scheduled to begin on May 17, 2027, with substantial completion by June 28, 2027, and final completion by July 9, 2027. The contract will be awarded to the lowest priced, qualified bidder who meets all technical requirements, timeline constraints, and terms and conditions. Bidders must submit a lump sum total bid and provide required documentation, including an Affidavit of Non-Collusion, an Affirmative Action declaration, and a Supplier Diversity Form. All submissions must be made electronically through the Minnesota State e-procurement system by the deadline of November 12, 2026. Compliance with prevailing wage standards is mandatory for this project.
Minnesota State Colleges and Universities System

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 238330
New
Federal
USMC Stair Runner Replacement for Home of the Commandant
Solicitation # M0026427RFI002
The Department of Defense, through the Marine Corps, has issued a sources sought announcement under solicitation M0026427RFI002 to conduct market research for the replacement of the stair runner at the Home of the Commandant in Washington D.C. This project requires a custom, like-for-like replacement for three flights of stairs and associated landings, designed to replicate the existing runner's appearance, color, pattern, and texture to maintain the residence's historic architectural character. The scope of work includes field measurements, the provision of material samples for government approval, fabrication of a professional-quality runner with finished edges, and full installation. The project must be completed by April 16, 2027, with work typically performed Monday through Friday from 7:00 AM to 4:00 PM. This opportunity is designated as a total small business set-aside under NAICS code 238330. Interested vendors must demonstrate experience in custom carpet fabrication and professional installation. Key requirements include the use of protective coverings to safeguard historic woodwork and architectural features, the removal of all contractor-generated debris, and compliance with security and access-control protocols at Marine Barracks Washington. Responses must be submitted to Sergeant Jacob Espinosa by 10:00 AM EST on October 22, 2026, and should include the company name, address, phone number, point of contact, CAGE code, company size status, and ownership nationality.
Commander

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

Solicitation FA3047-12-T-0011 is a Department of Defense construction project managed by the 502 Cons Cl at Lackland Air Force Base, Texas. The project consists of two primary scopes of work: the removal and replacement of asbestos-containing material (ACM) vinyl tile and mastic in Building 910, followed by the installation of non-ACM vinyl tile and resilient rubber flooring, and the removal of approximately 1,400 square feet of carpet in the dining area of Godfather Pizza in Building 2300 to be replaced with GunMetal porcelain ceramic tiles and vinyl base molding. The project magnitude is estimated between 25,000 and 100,000 dollars, with a performance period of 30 calendar days for each specific building scope. The contract requires strict adherence to hazardous material handling and asbestos abatement protocols for Building 910 and compliance with Davis-Bacon prevailing wage rates for Bexar County, Texas. Key administrative updates include Amendment 3, which extended the quote due date to September 7, 2012, and corrected the fringe benefit rate for asbestos workers to 8.07. The project involves specific material submittals for VCT, mastic, and cove base, and requires a one-year warranty on all workmanship. Coordination is managed through Contract Specialists Shaun L. Gilbert and Ryan D. Bueno.

General Info

Contract Value

$32,080.28

NAICS

238330 - Flooring Contractors

Place of Performance

1655 Selfridge Ave, Lackland AFB, TX, 78236, USA

Set-Aside

NONE

Award Issued Date

Documents

13

Amendment 0001 to Solicitation FA3047-12-T-0011

PDF, High priority: read this firstamendment
High

FA3047-12-T-0011 Atch 5 B910 Floor Layout

PDF, High priority: read this firstspecifications
High

FA3047-12-T-0011 Attachment 6 - B2300 Floor Layout

PDF, High priority: read this firstspecifications
High

FA3047-12-T-0011: Replace Carpet with Ceramic Tile in dining area of Godfathers Pizza Bldg 2300

PDF, High priority: read this firstrfq
High

FA3047-12-T-0011 Revised SOW for Bldg 910 ACM Vinyl Tile Replacement

PDF, High priority: read this firstsow
High

FA3047-12-T-0011 SOW - Ceramic Tile Installation Bldg 2300

PDF, High priority: read this firstsow
High

FA3047-12-T-0011 SOW for Bldg 910 Remove and Replace ACM Vinyl Tile

PDF, High priority: read this firstsow
High

FA3047-12-T-0011 Wage Determination - Lackland AFB

PDF, High priority: read this firstwage-determination
High

Schedule of Material Submittals - Remove and Replace ACM Vinyl Tile Bldg 910

XLS, High priority: read this first1 page · specifications
High

SOW for Bldg 2300 Ceramic Tile Floor Covering - Lackland AFB

PDF, High priority: read this firstsow
High

FA3047-12-T-0011 Q&A #1

DOC, Low priority1 page · q-and-a
Low

FA3047-12-T-0011 Questions & Answers #1

DOC, Low priority1 page · q-and-a
Low

FA3047-12-T-0011 Questions & Answers #3

DOC, Low priority1 page · q-and-a
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

11 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Aug 31, 2012 to Sep 6, 2012. The notice description changed.

Notice updated

Response deadline changed from Sep 6, 2012 to Sep 8, 2012. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Ryan D. BuenoContract Specialist

Full Description

Show more
Amendment 3: Extension of Quote Due Date until 7 Sep 12 @ 6:00 PM (CST). Incorporation of Section J - Attachment 3A, Supplement to Wage Determination Building. A correction was made on the Wage Determination Building, revising the Fringe Benefits for Abestos from 80.7 to the corrected amount of 8.07.

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 238210
New
Federal
DCF3 PROJECTION SYSTEM
Solicitation # A070977
The Department of Defense, specifically the 502 Cons Cl under the Office of the Air Force, is issuing a sources-sought Request for Information (RFI) for the DCF3 Projection System, solicitation number A070977. The objective is to identify capable providers for the installation of standalone audio-visual (AV) classroom equipment in sixteen classrooms at the BMT DCF3 (Building 9270) located at JBSA-Lackland, Texas. The scope of work includes providing all personnel, equipment, and materials to install laser projectors, zoom lenses, lecterns, scaling switchers, and associated cabling. The system must operate as a standalone solution and is strictly prohibited from interfacing with the Air Force network. Key deliverables include the integration of Apple Government-Furnished Equipment, the provision of technical documentation, and the delivery of user training for staff. Technical requirements specify that projectors and extension columns must be Trade Agreement Act (TAA) compliant, and touch panels must be FCC Class A certified. The contractor is responsible for ensuring high video resolution and sound quality, with final acceptance based on a post-installation walkthrough and inspection at the project site. Security requirements are stringent, requiring criminal history checks and background investigations for all personnel accessing the base, as well as strict adherence to Force Protection Condition procedures and a total prohibition of weapons on site. This RFI is strictly voluntary and is not a formal solicitation for quotes; interested parties must submit their capabilities and open-market pricing via email to Tommie Low by October 27, 2026, at 10 a.m. CST.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

1 day ago

DEADLINE

in 7 days
View Details
NAICS: 811310
New
Federal
Aviation Support Equipment Load Testing
Solicitation # F2MT2M6146AQ01
This Sources Sought Notice, solicitation number F2MT2M6146AQ01, is a market research effort to identify qualified sources capable of providing aviation support equipment load testing and maintenance for the 433rd MXS/AMXS at Joint Base San Antonio-Lackland, Texas. The scope of work involves non-personal services including annual preventive maintenance inspections, load tests, certification, and both scheduled and unscheduled repairs to ensure the safe operation of aircraft support equipment. All services must adhere to OSHA Standards 1910 and 1926, ANSI Standards B30.16 and B30-5, and applicable Air Force Instructions and Technical Orders. Key deliverables include an initial annual preventive maintenance schedule, certification reports due within two workdays of completion, and repair estimates provided within 48 hours of an initial survey. Performance requirements specify that standard preventive maintenance must be completed and equipment returned within 48 hours of pickup, while approved repairs must be returned within three business days. Interested vendors must submit their response, including company details, CAGE code, and a statement of capability with product literature, to Dalwyn Corporan-Polanco by 10:00 AM CDT on October 20, 2026. This notice is for research purposes only and does not constitute a solicitation or a promise to issue one.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in about 2 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS