Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Building Envelope Repairs/Exterior Insulation Finish System (EIFS)

Open
PE-55612-NONST-2027-000000041State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bulloch Board of Education is soliciting bids for building envelope repairs and replacement at four schools in Statesboro, Georgia: Southeast Bulloch High School, Julia P. Bryant Elementary School, Sallie Zetterower Elementary School, and Nevils Elementary School. The scope of work involves selective repairs of the Exterior Insulation Finish System (EIFS) where base or finish coats have deteriorated, the installation of a fluid-applied waterproofing system over prepared EIFS or stucco surfaces, and repairs to associated sheet metal components and sealants. The project requires pressure washing and surface preparation, with all materials installed according to manufacturer instructions. The performance period allows 135 calendar days for substantial completion and up to 30 days for final punch list items. Bidders must be properly licensed in Georgia and provide at least three references for similar projects. Submissions must include a bid security equal to 5 percent of the bid amount, and the successful contractor will be required to provide performance and payment bonds along with a certificate of liability insurance including workers' compensation. Evaluation factors for award include licensure status, quality of previous work, financial management, and personnel qualifications. Payment is processed via an application for payment reviewed by the architect, with options for paper check or EPay. There is no specified set-aside status for this solicitation.

General Info

Bids for building envelope repairs and waterproofing at four Georgia schools.

Documents

1
PDF, High priority: read this firstitb
High

Read the document

Due in 43 days

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 43 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 1 solicitation documentRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → Bulloch Board of Education
Contacts1 person available
OfficeN/A

Full Description

Show more
Scope of work includes building envelope repairs/replacement at four schools in Statesboro, Ga. This includes selective repairs of EIFS (exterior insulation finish system), and a fluid applied waterproofing system over existing/new prepared EIFS/Stucco surfaces. Associated sheet metal components and accessories are included. See attachment for full documentation. Contact Consultant Joe Baker via email at Sign up to see this detail

Similar Contracts

Same NAICS industry code

NAICS: 238190
New
International
Glasshouse Fields Estate – External Fire Safety Improvement Scheme
Solicitation # ocds-h6vhtk-07c0cb
Newlon Housing Trust is seeking contractors for the Glasshouse Fields Estate External Fire Safety Improvement Scheme to bring external facades into compliance with the Building Safety Act and Building Regulations. The project focuses on remediating defects identified in the FRAEW report, including the installation of fire stopping around vent and duct penetrations, providing cavity barriers at the parapet level for masonry and rendered facades, and removing combustible insulation from curtain walls on compartment wall lines. The scope of work involves stripping back facades in localized areas to fit new sheathing boards, fire cavity barriers, and insulation before reinstating the external leaf. The procurement is organized into three lots with a total estimated value of £2,750,000 including VAT. Lot 1 covers fire safety works for five buildings under 18 meters (£1,700,000), Lot 2 involves contributions to the Gateway 2 Building Safety Regulator submission (£50,000), and Lot 3 covers works for buildings over 18 meters (£1,000,000), with the award of Lot 3 being dependent on the success of Lot 2. This is a below-threshold open competition with an award criteria weighting of 60% for quality and 40% for price. The response deadline is January 15, 2027, and the performance periods extend through May 2029.
Newlon Housing Trust

POSTED

3 days ago

DEADLINE

in about 2 months
View Details
NAICS: 238190
New
SLED
Construction, CCSO Subsurface Water Intrusion
Solicitation # 2026-404
Invitation for Bid 2026-404 is a solicitation issued by Collin County, Texas, for construction repairs to address subsurface water intrusion and moisture-related deterioration at the lower level of the south building of the Collin County Justice Center. The project involves a comprehensive scope of work including selective demolition, exploratory openings, and structural steel repairs, such as the installation of supplemental wide flange beams and concrete repair. The probable construction cost is estimated at 200,000 dollars, which includes a not-to-exceed 100,000 dollar allowance for unknown conditions discovered after demolition. The contract will be awarded to the lowest and best responsible bidder based on compliance, pricing, schedule, and qualifications. Bidders must provide a 5% bid security and, upon award, furnish performance, payment, and two-year maintenance bonds within ten calendar days. The contractor is required to commence work within ten days of a written Notice to Proceed and must adhere to strict material storage and packaging standards to prevent moisture exposure. Key requirements include a professional engineer-sealed trench safety plan and full compliance with ADA regulations. Mandatory pre-bid meetings were scheduled for November 2 and 5, 2026, with a final bid response deadline of December 3, 2026.
Construction and Projects

POSTED

3 days ago

DEADLINE

in 10 days
View Details

More opportunities from Georgia → Bulloch Board of Education

Same awarding agency

NAICS: 238220
SLED
HVAC Controls Project #FY2027-PH# HVAC
Solicitation # FY2027-PH3 HVAC
Bulloch County Schools is soliciting proposals for the replacement of HVAC controls at Stilson Elementary School, Langston Chapel Elementary School, and Langston Chapel Middle School in Georgia. The scope of work includes the installation of ethernet cabling, servers, and control devices to provide individual and universal HVAC control, customizable scheduling, and peak demand limiting. The project requires the use of backnet points for integration into the existing Building X application and the installation of wall-mounted thermostats that allow local users to override settings. The vendor must also remove and preserve all existing terminal equipment controllers for return to the owner. Proposals must be submitted in a sealed envelope to Ryan Macy by December 17, 2026. The award will be based on the most advantageous proposal, with scoring heavily weighted toward cost (70 points), demonstrated ability (20 points), proposed warranty (5 points), owner training (2.5 points), and the submission of a bid bond (2.5 points). A bid bond of 5 percent per location is required, along with performance and payment bonds equal to 100 percent of the contract sum. All work must be completed by July 16, 2026. Payment terms are net 30 days from acceptance, with a 10 percent retainage withheld until final project completion and inspection. There is no set-aside status for this solicitation.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

17 days ago

DEADLINE

in 24 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS