Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 30, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Buildings 004,005 & 015 HVAC Replacement Project 23-413 (REPOST #2)

Closed
23-413State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333413
New
DIBBS
41--FAN,VANEAXIAL
Solicitation # SPE8E9-27-T-0554
This contract is a Request for Quotations (RFQ) issued by DLA Troop Support, Construction & Equipment MRO SVC I for the procurement of nine vane axial fans, identified by NSN 4140-00-289-8885 and part number M18953-AA02WA4W6NANANA. The hardware must meet specific technical requirements, including a 440V AC three-phase power supply, a nominal air flow rate of 2000 cubic feet per minute, and clockwise rotation with outward flow. The item is designated as a critical application item and must comply with basic specification MIL-PRF-18953C(1) and quality assurance provision QAP 13873 QAP-EQ003. Additionally, the manufacturer must be Qualified Products List (QPL) approved at the time of award. Delivery is required within 318 days after order, with an original required delivery date of November 16, 2026, shipped FOB Destination to the DLA Distribution DDSP New Cumberland facility in Pennsylvania. The contract mandates strict adherence to MIL-STD-2073-1E for packaging and MIL-STD-129 for marking. Quality inspection will occur at the destination using sampling methods per MIL-STD-1916 or ASQ H1331, with a zero-non-conformance requirement for acceptance. Environmental restrictions prohibit the intentional use of mercury or Class I ozone-depleting chemicals. Administrative requirements include the use of the Wide Area WorkFlow (WAWF) system for invoicing and compliance with various FAR and DFARS clauses regarding cybersecurity, sustainable products, and small business representations.
CONSTRUCTION & EQUIPMENT MRO SVC I

POSTED

1 day ago

DEADLINE

in 10 days

AI Contract Overview

Show more

The project involves comprehensive HVAC system replacements across three campus buildings: the Corporation Yard, Gymnasium, and Fieldhouse. In the Corporation Yard, the existing packaged and split air conditioning units, including heat pumps and natural gas furnaces, will be removed and replaced with a central rooftop air handler that provides chilled water cooling and heating, integrated into the existing building management system. New ductwork, terminal boxes with reheat, and zone controls will be installed, along with replacements of ductless mini split units serving data closets. Any ceiling modifications necessary for mechanical access are included. For the Gymnasium and Fieldhouse, the scope includes decommissioning existing HVAC equipment, removing ductwork, and installing three new chilled/heating water air handlers, zone-level terminal boxes with reheat, exhaust fans, and an exterior mechanical yard. The new systems will be connected to the existing controls for centralized monitoring and control. The work is divided into additive alternate bids as specified in the plans. The project is scheduled for solicitation with a response deadline of June 4, 2024, and is managed by Stanislaus CSU in California, with Rhonda Willson serving as the primary contact.

Documents

1
PDF, High priority: read this firstrfb
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • FAN, TUBEAXIALOpen now, due in 11 days
  • FAN, TUBEAXIALOpen now, due in 11 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Stanislaus CSU
Contacts1 person available
OfficeN/A

Full Description

Show more
The project consists of replacement of the HVAC systems in three buildings: the Corporation Yard (004), Gymnasium (015), and the Fieldhouse (005). The details for building specific project descriptions are below.
¿ Corporation Yard: Existing packaged and split AC systems with either heat pump or natural gas furnace will be removed, as well as selected ductwork. The new HVAC system will be a central station rooftop air handler with chilled water cooling and heating was heating connected to the points of connection provided in Phase 1, which is complete. New ductwork and terminal boxes with reheat will provide zone level temperature control. Two ductless mini split AC units serving data system closets will also be replaced. All air handler and zone level controls shall be incorporated into the existing building management system per plans. Any ceiling work required to provide access for mechanical construction shall be included as generally indicated on the plans.
¿ Gymnasium & Fieldhouse: The Work includes modifications to the mechanical systems and controls of the campus Gymnasium/Fieldhouse building, as delineated on the project drawing set. Demolition includes decommissioning and removal of the existing dx and HHW air moving equipment, exhaust fans, and portions of ductwork. New work includes three new chilled/heating water air handlers, zone level terminal boxes with HHW reheat, exhaust fans, a new exterior mechanical yard, additions to the chilled water and heating water distribution, & all associated controls.
¿ All new controls shall be connected to the existing systems for control and monitoring by central plant facility staff.
¿ Scope of work shall be separated into additive alternate bids, as noted on plans.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS