Buildings Structural Demolition

Active
1205M618R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract entails the demolition and removal of buildings and structures located on National Forest land within the Mt Baker Snoqualmie National Forest area. The scope of work includes disconnecting, sealing, and capping site utilities, addressing hazardous materials such as asbestos, septic tanks, underground storage tanks, and properly handling and disposing of refrigerants, mercury-containing items, and PCB-containing materials according to all applicable federal, state, and local regulations. All structures, debris, and trash must be removed and legally disposed of. The contractor is responsible for site restoration, including clearance and grading, and must ensure that underground water lines are cut and capped appropriately while all underground and above-ground power lines are removed from junction boxes to the building demolition site. Compliance with all safety and regulatory requirements is mandatory, including OSHA regulations, state occupational safety laws, and hazardous materials handling protocols. The contractor and any subcontractors must be licensed to perform hazardous material activities. The contract is a firm-fixed-price service contract set aside for small businesses, requiring a payment bond covering 100% of the contract price to secure project completion and protection of property. The contractor must provide at least 48 hours’ advance notification before beginning demolition. Facilities for contractor employees, such as portable toilets, are the contractor’s responsibility due to the lack of nearby restrooms at project sites. The Request for Proposal will include applicable wage determinations under service contract labor standards, with separate wage determinations for each county. The solicitation was posted in August 2018, with award details and a possible pre-solicitation conference to be announced in the RFP.

General Info

Demolition of structures on Mt Baker Snoqualmie Forest, hazardous material removal, site restoration, licensed contractors.

NAICS

238910 - Site Preparation Contractors

Place of Performance

USDA Forest Service Mt. Baker-Snoqualmie National Forest 2390 Wetmore Ave., Ste 3A, EVERETT, WA, 98201, USA

Set-Aside

SBA

Documents

1

Attachment_1_-_Building_Locations.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Mt Baker Snoqualmie National Forest
Contacts1 person available
OfficeEVERETT, WA, 98201, USA
Office AddressEVERETT, WA, 98201, USA
Contacts
Brian A. JohnsonContract Specialist/Contracting Officer

Full Description

Show more
GENERAL REQUIREMENTS This project consists of the following, but is not limited to: 1) Demolition and removal of buildings and structures off of National Forest land; 2) Disconnecting, sealing / capping in place site utilities; 3) Hazmat, i.e. asbestos, septic tank / solid waste, underground storage tank (UST), etc. LICENSING REQUIREMENTS The prime contractor and subcontractors, if any, are required to be licensed to perform all required hazmat activities under this contract. DESCRIPTION OF WORK The work will include, but is not limited to: 1) Remove and dispose of all building structures; 2) Remove and haul all trash and debris off of the National Forest; 3) Remove the materials from the demolition site in accordance with federal, state and local laws and regulations; 4) Disconnect all utility services before demolition; 5) Perform site clearance, grading and restoration; 6) Complete demolition work in accordance with technical specifications and as directed by CO / designated COR; 7) All underground water lines will remain in place, shall be cut and capped 5 feet from edge of building with valve box; 8) All under ground and above ground power lines shall be removed from junction box to the building demolition; 9) Remove and dispose of appliances and other items that may contain refrigerants in accordance with 40 CFR, Part 82. Appliances and other items may include, but are not limited to, freezers, refrigerator; etc.; 10) Remove and legally dispose of mercury-containing materials including fluorescent, mercury vapor, metal halide bulbs, and thermostats containing a liquid filled capsule, PCB-containing materials including capacitors, ballasts, and transformers where the component is contained within a metal jacket and does not have a specific, legible label stating no PCBs are present. PROJECT LOCATIONS Refer to Attachment 1 - Building Locations. REGULATORY AND SAFETY REQUIREMENTS The contractor shall comply with all Federal, State, and Local safety laws and regulations applicable to the execution of the work including, but not limited to: 1) Handling, storing and disposal of toxic or hazardous substances and materials; 2) "Call Before You Dig No. 811"; 3) Occupational Safety and Health Agency (OSHA) requirements; 4) Washington Department of Labor (WDOL); 5) Other applicable federal, state, and local codes, laws, and regulations regulating worker safety, transport and disposal of hazardous wastes. Contractor shall post any applicable work place notices as required by Law; 6) Contractor shall provide Government with copies of shipping receipts, manifests, bills of lading, or similar documentation regarding the lawful disposal of all materials and debris generated by the contract. ADVANCED DEMOLITION NOTICE REQUIREMENT The awardee shall be responsible for providing the COR with a minimum of 48 hours advanced notification prior to the beginning of demolition of any structure. EXISTING FACILITIES FOR CONTRACTOR USE There is no public restroom nearby the Camp Silverton and Darrington Seed Orchard sites. The Contractor shall be responsible to provide and maintain a portable toilet for its employees use during performance of all services. CONTRACT TYPE SELECTION Commercial Item, Firm-Fixed-Price (FFP), Service Contract APPLICABLE LABOR STANDARDS In accordance with FAR Subpart 37.3--Dismantling, Demolition, or Removal of Improvements, 37.301--Labor Standards, no follow-on construction activites will take place. This potential contract is solely for the demolition of buildings and associated services required by the awarded contract. Based on this, the Service Contract Labor Standards will apply and the applicable wage determination will be included in the Request for Proposal (RFP) when issued. A separate wage determination will be provided with the RFP for each county where the buildings are located. PAYMENT BOND REQUIREMENT In accordance with FAR Subpart 37.302, the contracting officer (CO) is requiring payment bond coverage in the amount of 100% of the contract price (and modifications, if any) to ensure four primary objectives: 1) Ensure completion of the work; 2) Protect property to be retained by the Government; 3) Protect property to be provided as compensation to the contractor; and 4) Protect the Government against damage to adjoining property. DATE THE RFP WILL BE ISSUED ON FBO Approximately fifteen calendar (15) days after the date of this presolicitation notice. PRE-SOLICITATION CONFERENCE If a pre-solicitation conference is offered by the Forest Service the details of these meetings, i.e. dates/times/locations will be provided in the RFP. TECHNICAL POINT OF CONTACT Thomas Warter, Facilities Engineer, (425) 783-6082, twarter@fs.fed.us.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
Keystone Job Corps Building 14 Demo
Solicitation # keystone-job-corps-building-14-demo
The Keystone Job Corps Building 14 Demo project involves the complete demolition of the old security building and its foundation at the Keystone Red Rock Job Corps Center in Drums, Pennsylvania. The scope of work includes the removal of all debris, trees, and rocks, as well as the demolition of an old septic system. Following demolition, the contractor is responsible for backfilling, grading, and seeding the affected areas. Utility requirements include capping the sewer line and disconnecting power to Building 14 while ensuring uninterrupted power and communications for the guard shack, mountain pump house, and water tank, which may require the installation of new telephone poles. Additionally, the water shut-off valve must be replaced with a straight pipe within a single day, specifically between 8:30 AM and 3:00 PM, to minimize disruption to students. This small business set-aside solicitation requires the contractor to provide all necessary permits and implement traffic control, including flaggers on Foothills Drive. Compliance with the Davis-Bacon Act is mandatory, requiring the submission of certified payroll. Bidders must be active and registered in SAM.gov and are required to provide separate bids for labor and materials. The contractor must also provide chain of responsibility letters for all hauled-off debris and garbage.
Keystone Job Corps

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238910
New
International
Neebing-McIntyre Floodway Clearing Project
Solicitation # LRCA-2026-01
The Neebing-McIntyre Floodway Clearing Project (LRCA-2026-01), issued by the Lakehead Region Conservation Authority, involves vegetation clearing and sediment excavation between the Redwood Ave Bridge and the Diversion Channel Outlet. The scope of work includes the excavation of approximately 6,133 cubic meters of floodway sediment, hauling and disposal of 5,782 cubic meters of material, and the removal of trees 150 mm and greater in diameter. Additional requirements include the installation of geotextile and rip-rap, site dewatering in accordance with OPSS.MUNI 517, traffic control following Ontario Traffic Manual Book 7, and the implementation of environmental controls. The contractor must submit a Dewatering and Water Management Plan for approval prior to starting work and ensure side slope transitions maintain a minimum slope of 2H:1V. Tenders must be submitted digitally via the Bids and Tenders portal by 2:00 PM EDT on October 27, 2026, as a single PDF. Mandatory submission documents include the Tender Form, Agreement to Bond, a 10% bid bond on CCDC Form 220, a Certificate of Insurance, and Supplementary Forms A through D covering subcontractors, alternatives, experience, and supervisory staff. Failure to complete these forms may result in tender rejection. Upon award, the successful contractor must provide a performance bond for 100% of the work value and a labor and materials payment bond for 50%. Payment is processed via progress certificates, contingent upon the submission of a WSIB certificate of clearance and a statutory declaration confirming all liabilities and liens have been discharged. Notably, the owner is not liable for interest on any amount payable to the contractor, and time is strictly of the essence for completion.
bids&tenders

POSTED

about 21 hours ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS