Bundled Road Projects
Forests, Parks and Recreation
Design Build Services
Various Locations
INVITATION TO BID
DEPARTMENT OF BUILDINGS AND GENERAL SERVICES
STATE OF VERMONT
Contractors are invited to bid on the Bundled Road Projects, Forests Park and Recreation – Design Build Services
for Buildings and General Services on behalf of the Agency of Natural Resources – Forests, Parks and Recreation at
various locations in Vermont.
This project consists of, but is not limited to:
Design/build construction project to upgrade up to 42.8 miles of forest roads on state lands to standards that
ensure sustainable and durable surfaces that reduce or eliminate sedimentation and pollution runoff into
streams. The majority of the project is focused on sections of road that are ‘hydrologically connected’ to waters
of the State such as lakes and streams, and any interconnecting ‘non-hydrologically connected’ segments.
Inventory and assessment data has been collected only on hydrologically-connected segments by 100-meter
segment to assess any deficiencies in the segment from meetings standards. The scope of this project is to use
the assessment data in combination with field investigation and planning to develop detailed plans for
addressing any deficiencies, seek approval of those plans from the State, and then execute the upgrade plans.
See Attached "Clean Water Bundled Project Design Build Scope of Work.pdf" and associated attachments
referenced in that document for the detailed scope of work and specifications.
Bidder must complete the Bid Qualification Form and submit with Bid Proposal.
Sealed Bids accompanied by proper Bid Security shall be received by email to
contact@example.gov, until
August 5, 2024 at 4:30 PM.
Documents may be obtained from Blueprints Etc, 20 Farrell Street, South Burlington VT 05403, by phone at 802-
865-4503, by fax at
+1 (555) 000-0000 or email to:
contact@example.gov. Project Manuals and Plans are available
for preview at: http://www.blueprintsetc.com in the Public Plan Room. Any and all notifications, releases and
addendums associated with this project will be posted at http://www.blueprintsetc.com. There is a non-refundable
fee for each set of documents purchased.
Fee to Include one (1) Hard Copy & one (1) Digital CD-ROM Copy: $TBD
1. Please be advised that all notifications, releases, and addendums associated with this RFP will be
posted on-line in the plan room where the original solicitation resides unless otherwise
determined that a hard copy is necessary. The state will make no attempt to contact contractors
with updated information. It is the responsibility of each contractor to periodically check the
posting site for any and all notifications, releases and addendums associated with the RFP.
2. NOTE: On occasion hard copy addendums may be required due to size or type of media/requirements.
If applicable and as determined by the Department of Buildings and General Services, addendums that
require hard copy distribution, a copy of such addenda will be mailed or delivered for each set of plans
and specifications issued to the bidders, prior to the bid date. However, it is the responsibility of the
bidder to be sure they have received all addenda, and must so state the number of addenda they have
received on the proposal.
3. If Bidders choose to pull information from other third-party sites, Bidders’ do so at their own risk as
there is one official source of information for documents as indicated above.
There will be a mandatory pre-bid meeting at the site on July 22, 2024 at 9:00 AM. Meet at parking area on west
side of Little River Road, Waterbury, VT, 1.7 miles from Rt 2 intersection (44.3716406, -72.768971).
QUESTION AND ANSWER PERIOD: Any vendor requiring clarification of any section of this RFP or
wishing to comment or take exception to any requirements of the RFP must submit specific questions in writing
to
contact@example.gov no later than 4:30 PM on July 29, 2024. All questions should include
Bundled Road Projects, Forests Park and Recreation – Design Build Services in the subject line. Any comments,
questions, or exceptions not raised in writing on or before the last day of the question period are waived. At the
close of the question period a copy of all questions or comments and the State's responses will be posted at
http://www.blueprintsetc.com. Every effort will be made to post this information as soon as possible after the
question period ends, contingent on the number and complexity of the questions.
Bidder’s attention is directed to:
1. General Conditions for Construction Contracts. It is the Bidder’s responsibility to thoroughly read and
comply with all requirements. Please pay close attention due to the changes that have been made.
2. Funding Source:
This project is being funded, in whole or in part, through the American Rescue Plan Act (ARPA) funds
and/or Vermont Capital Construction Act funds.
Socioeconomic affirmative steps per 2 C.F.R. § 200.321: Placing qualified small and minority
businesses and women’s business enterprises on solicitation lists;
1. Assuring that small and minority businesses and women’s business enterprises are solicited
whenever they are potential sources;
2. Dividing total requirements, when economically feasible, into smaller tasks or quantities to
permit maximum participation by small and minority businesses, and women’s business
enterprises;
3. Establishing delivery schedules, where the requirement permits, which encourage
participation by small and minority businesses, and women’s business enterprises;
4. Using the services and assistance, as appropriate, of such organizations as the Small
Business Administration and the Minority Business Development Agency of the
Department of Commerce; and
5. Requiring the prime/general contractor, if subcontracts are to be let, to take the same
affirmative steps as listed in numbers 1 through 5.
3. BYRD ANTI-LOBBYING CERTIFICATION
Contractor has provided the certification required by the Byrd Anti-Lobbying Amendment, 31 U.S.C. §
1352 (as amended, and will follow the requirements for certification of each lower tier (subcontract) to
disclose any lobbying with non-federal funds that takes place in connection with obtaining any federal
award. Such disclosures will be forwarded from tier to tier up to the Contractor who in turn will forward
the certification(s) to the federal awarding agency.
4. DOMESTIC PREFERENCE FOR PROCUREMENTS
As appropriate, and to the extent consistent with law, the contractor should, to the greatest extent
practicable, provide a preference for the purchase, acquisition, or use of goods, products, or materials
produced in the United States. This includes, but is not limited to iron, aluminum, steel, cement, and
other manufactured products. For purposes of this clause: Produced in the United States means, for iron
and steel products, that all manufacturing processes, from the initial melting stage through the
application of coatings, occurred in the United States. Manufactured products mean items and
construction materials composed in whole or in part of non-ferrous metals such as aluminum; plastics
and polymer-based products such as polyvinyl chloride pipe; aggregates such as concrete; glass,
including optical fiber; and lumber.”
5. NOTICE TO BIDDERS – PROHIBITION OF RUSSIAN GOODS: The Contractor is hereby notified
that, pursuant to Vermont Executive Order No. 02-22, dated March 3, 2022, the purchase of Russian-sourced
goods and goods produced by Russian entities (defined as institutions or companies that are
headquartered in Russia or have their principal place of business in Russia) is prohibited. The awarded
Contractor must fill out and sign the Executive Order 02-22 Vendor Certification as part of the Contract
awarding process. This certification is required for all subcontracts for work performed solely for the
State of Vermont and subcontracts for work performed in the State of Vermont.
6. BIDDER QUALIFICATION PROCESS DOCUMENT: The Department of Buildings and General
Services is requiring that all contractors meet certain minimum qualifications to be eligible to bid on this
project.
7. BID SUBMISSION INSTRUCTIONS:
a. CLOSING DATE: Bids must be received by the State by the due date specified on the front page of
this RFP. Late bids will not be considered.
i. The State may, for cause, issue an addendum to change the date and/or time when bids are
due. If a change is made, the State will inform all bidders by posting it on the webpage
indicated on the front page of this RFP.
ii. There will not be a public bid opening. However, the State will record the name, city and
state for any and all bids received by the due date.
b. BID DELIVERY INSTRUCTIONS:
i. ELECTRONIC: Electronic bids will be accepted.
ii. E-MAIL BIDS. Emailed bids will be accepted. Bids will be accepted via email submission to
contact@example.gov . Bids must consist of a single email with a single, digitally
searchable PDF attachment containing all components of the bid. Multiple emails and/or
multiple attachments will not be accepted. There is an attachment size limit of 40 MB. It is
the Bidder’s responsibility to compress the PDF file containing its bid, if necessary, in order
to meet this size limitation. It is also the Bidder's responsibility to ensure that their own email
system can send and receive messages up to this size.
iii. FAX BIDS: Faxed bids will not be accepted.
iv. PAPER BIDS: Paper format bids will not be accepted.
8. Full Bonding is required for this job.
9. SUBMITTAL EXCHANGE®: Contractor shall obtain a license for the State to utilize Submittal
Exchange for the purposes of this project. The State and its representatives will have full control of the
use of Submittal Exchange by authorized users of the State.
Submittal Exchange®, a web-based collaboration software system, shall be used to provide an on-line
database and repository, which shall be used to transmit and track project-related documents. Based on
an existing contract between the State and Submittal Exchange, the State anticipates that training and
support during this project will be provided by Submittal Exchange at no additional cost to the selected
contractor(s).
10. CONSTRUCTION CONTRACTOR EVALUATION FORM: The Department of Buildings and
General Services (BGS) may require contractor evaluations on construction projects over $100,000 or at the
discretion of the BGS Director. Evaluations will be used to compile contractor’s performance on BGS
projects to provide a history and assessment of the contractor’s performance
11. It is the Bidder’s responsibility to thoroughly read and comply with all instructions and requirements of
this bid solicitation.