Burch Creek Sewer Force Main Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Corning Public Works Department is initiating the Burch Creek Sewer Force Main Replacement Project in Tehama County, California. The primary objective is to replace the existing sewer main crossing the Burch Creek bridge, which was damaged by debris during previous storm events. This critical infrastructure repair is necessary to ensure the continued reliability of sewage utilities for local residents and businesses. To prevent future damage and mitigate elevated water levels, the project scope also includes the removal of sediment from the creek bed that is currently restricting water flow. The project is classified under NAICS code 237110 and is located in Corning, California, at coordinates 39.913016, -122.197591. According to the Notice of Exemption, the project qualifies for a Categorical Exemption under Class 2, Section 15302(c), as the replacement occurs in the same location with negligible or no expansion of capacity. Christina Meeds, Planner II, serves as the primary point of contact for the agency.

General Info

City of Corning project to replace Burch Creek sewer main and remove creek sediment.

Agency

California → City of Corning

Place of Performance

Loleta Ave, Corning, CA, 96021

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Corning
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Corning
Office AddressN/A
Contacts
Christina MeedsPlanner II

Full Description

Show more
The proposed Project involves the replacement of the existing sewer main that runs along the bridge crossing Burch Creek. It has been damaged by debris at the Burch Creek Bridge during previous storm events and needs to be repaired. If the sewer force main at Burch Creek is not operational, residents lose sewage utility. The project will also remove sediment from the creek bed that is restricting creek flows and causing elevated water levels that could result in further damage to the sewer force main. The purpose of the project is to provide reliable sewage utilities for businesses and residents of the City of Corning.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a substantial completion timeline of 560 calendar days. Bidders must provide a bid bond using form EJCDC C-430 and submit required MWBE documentation, including a Good Faith Efforts Form and Table A. The project is administered by Willis Engineers, who serve as the Owner's Representative. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and ASTM C 1093 for masonry testing.
Don Moorhead Construction, Inc.

POSTED

about 3 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to motor control center components, and the installation of new instrumentation, electrical systems, and slide gates. Key deliverables for the project include lead abatement, metals fabrication, painting and coatings, concrete resurfacing, and the installation of FRP reinforcing systems and access hatches. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Interested parties must submit their quotes, including their bond rate and any redlines to standard subcontract forms, by November 17, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS