Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

BURLINGTON SKYWAY WWTP CHEMICAL SYSTEM UPGRADES

Open
S-3487A-26International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Region of Halton is soliciting bids for the Burlington Skyway WWTP Chemical System Upgrades (Contract S-3487A-26), a project focused on modifications and additions to the chemical systems at the Burlington Skyway Wastewater Treatment Plant. The scope of work includes the removal and disposal of five sodium hypochlorite pumps and their associated concrete bases and spill containment curbs, the installation of fiberglass reinforced plastic (FRP) items and grating, and the sealing of floor and wall openings to ensure gas tightness. The project is based on the CCDC 2 – 2020 standard form, with a ready-for-takeover timeline of 52 weeks from the commencement date and a final completion date set for 6 weeks after the ready-for-takeover date. The contract will be awarded to the lowest compliant bidder based on the total bid price. Bidders must submit a digital bid bond using form CCDC 220-2024, a Domestic Supply Chain Plan, and a Vendor Code of Conduct acknowledgement. Mandatory requirements include CPO-Accredited OHSMS Certification, a WSIB clearance certificate, and the completion of the Owner’s Construction Health and Safety training module. Technical specifications mandate adherence to CSA-S269.1 and CAN/CSA-S269.3 for concrete forming, and all equipment must be received directly from the manufacturer. The project also involves managing hazardous building materials, including asbestos and lead, as identified in the site assessment report.

General Info

Halton Region seeks bids for Burlington Skyway WWTP chemical system upgrades and modifications.

Documents

6
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High

Read all 6 documents

Due in 6 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 6 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 6 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

2 updates
PhaseSolicitation
Posted

Solicitation

Deadline changed

Response deadline changed from Nov 3, 2026 to Nov 17, 2026.

Deadline changed

Response deadline changed from Nov 17, 2026 to Nov 24, 2026.

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyRegion of Halton
ContactsNo contacts available
OfficeCAN
Organization / AgencyRegion of Halton
Office AddressCAN
ContactsNo contact information available

Full Description

Show more
Refer to project document

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a solicitation issued by Garney Pacific, Inc. for the East Bay Municipal Utility District. The scope of work involves extensive infrastructure rehabilitation, including the repair of covered and open concrete structures, the relining or replacement of small and large diameter steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, and the replacement of motor control center components. The project also encompasses the modification of sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Key deliverables include lead abatement, metals fabrication, painting, coatings, and FRP reinforcing systems. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026.
Garney Pacific, Inc.

POSTED

about 8 hours ago

DEADLINE

in 13 days
View Details

More opportunities from Region of Halton

Same awarding agency

NAICS: 541330
International
PROVISION OF ENGINEERING SERVICES FOR CAPITAL NEEDS ASSESSMENTS AT THE BIOSOLIDS MANAGEMENT CENTRE AND NORTH WATER TREATMENT PLANTS
Solicitation # P-1352-26
The Region of Halton is soliciting engineering services for capital needs assessments at the Biosolids Management Centre and North Water Treatment Plants under solicitation P-1352-26. The scope of work involves developing an asset assembly inventory at Level 5, conducting field condition assessments to determine remaining useful life, and creating a strategic 20-year capital renewal plan. Key deliverables include completed assembly lists, capital planning workshops, and a final Capital Needs Assessment Report with replacement cost estimates compliant with the Sustainable Water and Sewage Systems Act, 2002. The contract is structured as a time-based agreement to an upset limit, with invoicing completed electronically on a monthly basis. Proposals must be submitted electronically via the Bids and Tenders system by November 13, 2026. The award will be based on the highest overall score out of 100 points, with the technical proposal weighted at 80 points and the cost proposal at 20 points. To be considered, technical proposals must meet a minimum threshold of 70%. Required personnel include a Project Manager with at least five years of experience and Professional Engineers licensed in Ontario. Additionally, the contract mandates strict adherence to accessibility standards, specific occupational health and safety training for field staff, and the disclosure of any AI tools used in project deliverables. There is no set-aside status for this solicitation.
Engineering Services

POSTED

about 1 month ago

DEADLINE

in 8 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS