Burning Tree Dr Waterline Replacement

Closed
460-375-02State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with a project estimate of $16,690,000. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, odor control equipment, and stormwater facilities. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a substantial completion timeline of 560 calendar days. Bidders must provide a bid bond using form EJCDC C-430 and submit required MWBE documentation, including a Good Faith Efforts Form and Table A. The project is administered by Willis Engineers, who serve as the Owner's Representative. Payment is processed via Applications for Payment, with payments becoming due 30 days after presentation to the owner. Technical standards for the work include compliance with AWS D1.2 for welding, NEMA standards for motors, and ASTM C 1093 for masonry testing.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 13 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, the relining or replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Additional requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to motor control center components, and the installation of new instrumentation, electrical systems, and slide gates. Key deliverables for the project include lead abatement, metals fabrication, painting and coatings, concrete resurfacing, and the installation of FRP reinforcing systems and access hatches. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond premiums reimbursed by Garney Pacific. Interested parties must submit their quotes, including their bond rate and any redlines to standard subcontract forms, by November 17, 2026, at 2:00 PM PT.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of dual 14 to 16-inch diameter HDPE DR 11 pipelines from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of a new Mountain Avenue Lift Station featuring a concrete wet well and submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operation. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and electrical and instrumentation and control. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on DBE participation. Bids are due by 2:00 PM on October 29, 2025. The primary point of contact for this opportunity is Julia Masaitis.
Filanc

POSTED

about 2 hours ago

DEADLINE

in about 16 hours

AI Contract Overview

Show more

Orange Water and Sewer Authority is soliciting sealed bids for the "Burning Tree Water Line Replacement" project under CIP No. 375-02, with bid submissions due by 3:00 P.M. local time on May 14, 2026. The project involves the removal and replacement of approximately 4,634 linear feet of 8-inch restrained joint polywrapped ductile iron water pipeline, along with the installation of 831 linear feet of 2-inch SDR 17 PVC water main and 90 linear feet of 2-inch type “K” hard copper water main. The contractor will also be responsible for abandoning roughly 5,470 linear feet of 8-inch AC water pipe using cellular concrete or grout fill, as well as completing all required temporary and permanent water services, traffic control, restoration, erosion and sediment control, and permitting to meet local codes and contract specifications. Contractors and subcontractors must hold valid North Carolina General Contractor’s Licenses appropriate for the scope and value of work. The contract documents will be available beginning April 10, 2026, and can be accessed electronically by request; no printed copies will be provided. A mandatory Pre-Bid Conference will be held at 3:00 P.M. on April 28, 2026, at OWASA's Administration building in Carrboro, NC. Bidders must also submit a Non-Collusion Affidavit and comply with North Carolina General Statutes regarding contracting practices. There is a minimum 10% minority business participation goal for this project, aligned with state statutory requirements. To stay informed about any updates or addenda, bidders are required to notify the designated contact via email expressing their intent to submit a bid. Failure to do so may result in disqualification.

General Info

OWASA seeks bids for Burning Tree water line replacement, requiring licenses, minority participation, pre-bid attendance.

Documents

1

CIP # 375-02 Burning Tree Water Line Replacement

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNorth Carolina → Orange Water & Sewer Authority
Contacts1 person available
OfficeNC, USA
Office AddressNC, USA
Contacts
David Moore

Full Description

Show more
Pursuant to Section 143-129 of the General Statutes of North Carolina, sealed Bids will be received by Orange Water and Sewer Authority from Bidders until 3:00 P.M., local time, on THURSDAY, MAY 14, 2026 for CIP No. 375-02, Project: “Burning Tree Water Line Replacement” at the OWASA Administrative Offices, 400 Jones Ferry Road, Carrboro, North Carolina 27510, at which time the Bids received will opened and read aloud. Bids will be received for a Unit Price General Construction Contract. The Contractor and all Subcontractors shall have valid North Carolina General Contractor’s Licenses for the type and value of the work to be performed. The Project consists of furnishing all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete and operable installation of: Complete and operable installation of approximately 4,634 linear feet of 8-inch restrained joint polywrapped ductile iron water pipeline from the intersection of Raleigh Road and Burning Tree Drive through the intersection of Burning Tree Drive and Pinehurst Drive. Installation of approximately 831 linear feet of 2-inch SDR 17 PVC water main and 90 linear feet of 2-inch type “K” hard copper water main to be installed via open cut. Installation of all temporary and new permanent water services and interconnections, required to install complete and operable water lines meeting local requirements and requirements as described in the contract documents. Abandonment of approximately 5,470 linear feet of 8-inch AC water pipe by cellular concrete or grout fill. Applicable traffic control, restoration, erosion and sediment control, permitting, and other items required to meet local requirements and requirements as described in the contract documents. The foregoing description shall not be construed as a complete description of all work required. Beginning on FRIDAY, APRIL 10, 2026, the Contract Documents will be made available to perspective bidders. Printed copies of the Contract Documents are not available. Electronic copies will be transmitted to bidders by request through email, free of charge, by emailing contact@example.gov. The Contract Documents may be viewed free of charge at the OWASA Administrative Offices, 400 Jones Ferry Road, Carrboro, North Carolina, Mondays through Fridays, between the hours of 8:00 A.M. and 5:00 P.M. Bidders shall attend a mandatory Pre-Bid Conference at 3:00 P.M., local time, on TUESDAY, April 28, 2026 at the 400 Jones Ferry Road, Carrboro, North Carolina OWASA Administration building. Orange Water and Sewer Authority has adopted a minimum ten (10%) percent goal for participation by minority businesses in the total value of the work for this project in accordance with Section 143-128.2 of the General Statutes of North Carolina. Each Bidder shall be licensed under Chapter 87 of the North Carolina General Statutes. Bidders are notified that “An Act to Regulate the Practice of General Contracting,” was ratified by the General Assembly of North Carolina on March 10, 1925, and that this Act and subsequent Amendments, will be observed in receiving and awarding Contracts. Each bidder is required to submit a Non-Collusion Affidavit pursuant to Section 133-30 of the General Statutes of North Carolina. To ensure that all Bidders are kept up to date on any Addenda, changes, or information notices, please send an e-mail to: contact@example.gov indicating your intention to prepare a Bid for the Project. Failure to complete this step may render your Bid as non-responsive.

More opportunities from North Carolina → Orange Water & Sewer Authority

Same awarding agency

New
SLED
Jones Ferry Road WTP Rapid Mix Improvements
Solicitation # 272-55
The Jones Ferry Road WTP Rapid Mix Improvements project, solicitation number 272-55, is a Single Prime Lump Sum General Construction Contract issued by the Orange Water and Sewer Authority in North Carolina. The scope of work involves furnishing all necessary materials, labor, and equipment for the complete installation and replacement of seven 24-inch butterfly valves, six slide gates, a polymer application point, and all associated appurtenances at the facility located in Carrboro, North Carolina. The project follows a strict timeline, with substantial completion required within 410 consecutive calendar days and final completion within 450 consecutive calendar days from the Administrative Notice to Proceed. Mobilization is scheduled to commence 260 days after the Administrative Notice to Proceed. To be considered responsive, bidders must have been licensed under Chapter 87 of the North Carolina General Statutes and must have attended the mandatory pre-bid conference held on November 19, 2026. Submissions require a Non-Collusion Affidavit pursuant to Section 133-30 of the North Carolina General Statutes and a bid security deposit of 5 percent of the bid amount via certified check or bid bond. Sealed bids were due by 3:00 P.M. on December 3, 2026. The procurement is conducted in accordance with Section 143-129 of the General Statutes of North Carolina, and the successful contractor and all subcontractors must maintain valid North Carolina General Contractor licenses for the specific type and value of the work performed.

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
SLED
Jones Ferry Road WTP Rapid Mix Improvements
Solicitation # 272-55
The Jones Ferry Road WTP Rapid Mix Improvements project, solicitation number 272-55, is a single prime lump sum general construction contract issued by the Orange Water and Sewer Authority in North Carolina. The scope of work involves the complete and operable installation of seven 24-inch butterfly valves, six slide gates, a polymer application point, and all associated appurtenances at the facility located in Carrboro, North Carolina. The contractor is responsible for providing all necessary materials, labor, equipment, and tools. Performance timelines are structured around the Administrative Notice to Proceed, with substantial completion required within 410 consecutive calendar days and final completion within 450 consecutive calendar days. A mobilization notice to proceed is scheduled to commence 260 days from the administrative notice. Bidders must attend a mandatory pre-bid conference on November 19, 2026, and submit sealed bids by 3:00 P.M. on December 3, 2026. To be considered responsive, bidders must email the designated address to receive addenda and provide a non-collusion affidavit pursuant to North Carolina General Statute Section 133-30. Required bid security consists of a certified or cashier's check or a bid bond equal to five percent of the bid amount. Additionally, the contractor and all subcontractors must hold valid North Carolina General Contractor’s Licenses under Chapter 87 of the state statutes. The successful bidder will be required to provide performance and payment bonds upon execution of the contract.
Water and Sewer Line and Related Structures Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 423720
SLED
Construction
Solicitation # 460-275-20 E
The Orange Water and Sewer Authority (OWASA) is soliciting bids for the procurement and delivery of new water pipe materials for the Booker Creek Rd. Water Main Replacement Project. The scope includes the supply of various materials such as 8-inch and 6-inch RJ DI pipe, 2-inch SDR 17 pipe, EPDM gripper gaskets, tracer wire, blue water tape, and associated fittings like tapping saddles and fire hydrants. All materials must be new and strictly conform to the OWASA Plans and the January 2025 Manual of Standards, Specifications, and Design. Bidders are required to provide all necessary parts to ensure a fully functioning assembly. The contract will be awarded to the lowest responsive and responsible bidder. Key requirements for responsiveness include the submission of a notarized bid with a total lump sum price, a detailed price breakdown, and a proposed pipe delivery schedule that ensures construction can proceed without delay starting in January 2026. All materials must be delivered to OWASA by December 14, 2026. Additionally, bidders must submit several mandatory certifications, including E-Verify, Non-Collusion, Conflict of Interest, and certifications regarding the Iran Divestment Act and the Companies Boycotting Israel Divestment Act. The deadline for questions is November 2, 2026, and the final response deadline is November 10, 2026.
Plumbing and Heating Equipment and Supplies (Hydronics) Merchant Wholesalers

POSTED

9 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS