Bus Wash System Modernization
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
WeGo Public Transit is soliciting proposals for the modernization and rebuilding of its bus wash facility at 130 Nestor Street in Nashville, Tennessee. The project requires a turnkey installation of a two-lane, drive-through friction wash system with integrated water reclamation, capable of servicing approximately 400 vehicles daily, including a mixed fleet of 27-foot to 60-foot buses. A key focus of the contract is high reliability, requiring redundant pumps with automatic failover, independent lane operation, N+1 blower redundancy, and predictive maintenance alerts. There is also a potential option in the second or third year of the contract to modernize a second facility located at 430 Myatt Drive. The selected contractor will be responsible for the removal and disposal of old equipment, full installation, commissioning, and staff training. The project is funded through the FTA and T-DOT, requiring strict adherence to federal compliance and performance standards. Proposers must demonstrate that the system meets specific quality and throughput acceptance tests. This solicitation, numbered 2026247, was posted on August 12, 2026, with a response deadline of September 11, 2026.
General Info
Agency
NAICS
Place of Performance
TN, USASet-Aside
Documents
(3)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
