Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Montana was posted on September 6, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Butte-Silver Bow County Detention Center Mechanical Cooling Addition

Closed
233State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 922140
SLED
Operation and Management of Contractor-Operated Correctional Facilities – Blackwater CF
Solicitation # FDC ITN-27-022
The Florida Department of Corrections is issuing Invitation to Negotiate FDC ITN-27-022 to secure a vendor for the operation and management of the Blackwater River Correctional Facility in Santa Rosa County, Florida. This facility houses adult males in minimum, medium, and close custody-security settings with a total capacity of 2,000 beds. The selected contractor will be responsible for comprehensive facility management, including the delivery of academic, behavioral, and vocational programmatic services, such as GED classes and mandatory literacy programs. The contract features an initial term of three years with the possibility of successive two-year renewals, with a targeted service commencement date of July 1, 2027. Award selection is based on the best value to the state, with the overall score weighted as 70 percent for the technical reply and 30 percent for the price reply. The technical evaluation focuses heavily on the proposed technical solution, including security, health services, and operations plans, as well as the vendor's experience and ability. To ensure financial security, the winning vendor must provide a performance bond or irrevocable letter of credit of 8 million dollars or the average annual contract price within ten business days of execution. All responses must be submitted electronically via the MyFloridaMarketPlace portal by the December 8, 2026, deadline, adhering to strict formatting and page limit requirements across three specific tabs.
Florida Department of Corrections

POSTED

14 days ago

DEADLINE

in about 1 month
NAICS: 922140
SLED
Operation and Management of Contractor-Operated Correctional Facilities – South Bay CF
Solicitation # FDC ITN-27-023
The Florida Department of Corrections is soliciting proposals under ITN-27-023 for the operation and management of the South Bay Correctional Facility in Palm Beach County, Florida. This facility has a capacity of 1,948 beds and houses adult males in minimum, medium, and close custody-security settings. The contract is for an initial term of three years, with the possibility of successive two-year renewals based on funding and satisfactory performance. The estimated annual spend for these services is approximately 51.6 million dollars. Award selection is based on best value, with 70 percent of the score derived from a technical reply and 30 percent from the price reply, specifically the total blended per diem. Technical evaluations focus on experience and ability, as well as detailed plans for operations, security, health services, inmate programmatic services, and transition. To be considered responsive, vendors must demonstrate at least ten years of corporate experience, maintain a specific Dun and Bradstreet financial stress score, and provide a five percent bid bond. Additionally, the successful contractor must furnish a performance bond or irrevocable letter of credit of 8 million dollars or the average annual contract price within ten business days of execution. The contractor is responsible for comprehensive facility management, including adherence to Department of Corrections policies, ACA standards, and HIPAA regulations. Key deliverables include a transition plan with a service commencement date of July 1, 2027, and the maintenance of various inmate programs such as academic, vocational, and substance abuse treatment. Performance will be monitored via a Contract Performance Indicator Tool and quarterly performance measures. Vendors must also certify compliance with Florida statutes regarding forced labor, drug-free workplaces, and non-collusion.
Florida Department of Corrections

POSTED

23 days ago

DEADLINE

in about 1 month
NAICS: 922140
SLED
Remote Interdiction Pilot Program
Solicitation # FDC ITN-27-015
The Florida Department of Corrections is soliciting replies for a Remote Interdiction Pilot Program to be implemented at the Suwannee Annex Correctional Institution. The program aims to enhance institutional security and reduce the frequency and severity of inmate-led violent acts and disturbances through the use of non-lethal Artificial Intelligence and other modern technologies. The selected contractor will install equipment and infrastructure within one inmate housing unit, integrate the solution with the facility's security operations center, and ensure the system meets US FDA requirements. The initial contract term is for up to one year, with the possibility of up to three additional one-year renewals. Award decisions will be based on best value, with a final evaluation score comprising a weighted Technical Reply (up to 750 points) and a Cost Reply (up to 250 points). Vendors must submit their replies in specific tabbed formats, with the Cost Reply provided in a separate sealed envelope and on a flash drive. The contract includes strict compliance requirements, including adherence to the Americans with Disabilities Act, the Prison Rape Elimination Act, and CJIS standards. Performance is tied to a Pilot Project Plan, with financial consequences of 500 dollars per day for late deliverables or system unavailability, and a 100,000 dollar penalty per occurrence for unauthorized or unnecessary use of force.
Florida Department of Corrections

POSTED

about 2 months ago

DEADLINE

in about 1 month

General Info

Place of Performance

MT, USA

Set-Aside

NONE

Documents

2

Butte Detention Center Mechanical Cooling Addition Drawings

PDF, High priority: read this firstspecifications
High

Butte Silverbow Detention Center DX Cooling Project Manual September 2024

PDF, High priority: read this firstproject-manual
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMontana → Butte-Silver Bow County
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
INSTRUCTIONS TO BIDDERSProposals must be made in accordance with these Instructions to Bidders.1. DOCUMENTS: Bona fide bidders may obtain Drawings and Specifications from theEngineer: ASSOCIATED CONSTRUCTION ENGINEERING, INC.12 North BroadwayBelgrade, MT 59714Phone: (406) 388-3320Fax: +1 (555) 000-0000 2. EXAMINATION: Bidders shall carefully examine the documents and the constructionsite to obtain first hand knowledge of existing conditions. Contractors will not be givenextra payments for conditions which can be determined by examining the site anddocuments. 3. QUESTIONS: Submit all questions about the Drawings and Specifications to theEngineer. Replies will be issued to all prime bidders of record as Addenda to theDrawings and Specifications and will become part of the Contract. The Engineer and theOwner will not be responsible for, nor can they give oral clarification. Questionsreceived less than 96 hours before the bid opening may be clarified via Facsimiletransmission if determined necessary by the Engineer. During the time period betweenthe Bid Opening and Bid Award, Engineer may only make representations specificallyauthorized by Owner. 4. SUBSTITUTIONS: In order to establish a basis of quality, certain materials or articlesare specified by designating one or more manufacturer's names, brands or numbers. It isnot the intent of the Specifications to exclude other materials or articles that measure upto the standard of those specified. Where equipment, materials, or articles are referred toin the Specifications, Contractor shall furnish to the Engineer for his approval the nameof the manufacturer of the material, machinery, mechanical, and other equipment whichhe contemplates incorporating into the work, together with their performance capacities,physical size and characteristics and other pertinent information. All considered andspecified materials, machinery, mechanical, and other equipment shall be installed asspecified. Subsequent rejection by the Engineer of an installation without approvedsubstitutions shall be at the risk of the Contractor. 5. BASIS OF BIDS: The Bidder must include all units cost items and all alternates shownon the Proposal forms; failure to comply may be cause for rejection. No segregatedproposals or assignments will be considered. 6. PROPOSALS: Owner invites following proposals: General Contract.The bid proposal form included in this bound volume shall be submitted as the biddocument. The blank spaces in the form if any, must be filled in correctly for each item.Bidder must state the prices in words and in figures for each item of work contemplatedas indicated. All bid proposals must be totaled, and in cases of errors or discrepancies theprices written in words shall govern. Any information written in areas outside the blankspaces will not be considered and may cause the entire bid to be rejected. Any bid notdisplaying the above information will be considered incomplete and may not be read.Where bidder is a corporation, bid proposals must be signed with the legal name of thecorporation followed by the name of the state of incorporation and the legal signature ofan officer authorized to bind the corporation to a contract. Envelopes and Bid shall bear the Montana State Contractor's Registration Number of theBidder. Bids shall be received no later than September 25, 2024 @ 4:00PM Address the opaque sealed envelope: To: Butte Silver Bow County Courthouse155 W Granite, Room 208Butte, MT 59701 Project: Butte Silver Bow County - Detention Center DX CoolingButte, Montana                                        From: Contractor's NameMontana Public Contractor's Registration No. 7. MODIFICATION AND WITHDRAWAL OF BIDS: Proposals may not be modifiedafter submittal, except as herein after provided. Bidders may withdraw Proposals at anytime before bid opening but may not re-submit them. No proposal may be withdrawn ormodified after the bid opening except where the award of Contract has been delayed for30 days. Bidder may modify his bid by facsimile communication at any time prior to thescheduled closing time for receipt of bids, provided such communication is received bythe Owner prior to the closing time, and provided further, the Owner receives a writtenconfirmation of the modification with the signature of the Bidder one day prior to theclosing time of the bid.                    8. QUALIFICATIONS: The Owner may make such investigations as he deems necessaryto determine the ability of the bidder to perform the work, and the bidder shall furnish tothe Owner all such information and data for this purpose as the Owner may request. TheOwner reserves the right to reject any bid if the evidence submitted by, or investigationof, such bidder fails to satisfy the Owner that such bidder is properly qualified to carryout the obligations of the Contract and to complete the work contemplated therein.Conditional bids will not be accepted. 9. DISQUALIFICATION: The Owner reserves the right to disqualify Proposals, before orafter opening, upon evidence of collusion with intent to defraud or other practices uponthe part of the Bidder. 10. OPENING: Proposals will be opened as announced in the Invitation to Bid. 11. AWARD OR REJECTION OF BIDS: The contract will be awarded to the lowestresponsible bidder, including full consideration of any alternates. Owner reserves theright to reject any and all bids and to waive any informality or irregularity in any bidreceived. The lowest responsible bidder shall be determined on the basis of the lowest Base Bid orthe lowest combination of Base Bid and Alternate Bids, if Alternate Bids are included.Owner may request additional references if deemed necessary. The Owner shall award such contract to the lowest responsible bidder in accordance withthe applicable resident bidding statutes of the State of Montana. The selection ofcontractor and award of bids is subject to approval by the Government Building Manager. Bidder agrees if, within twenty-four hours after the bids are opened, any Bidder files aduly signed, written notice with Owner and promptly thereafter demonstrates to thereasonable satisfaction of Owner, that a material and substantial mistake in thepreparation of the bid was made, the Owner may allow the Bidder to withdraw its bid andthe Bid Security will be returned. Thereafter that Bidder will be disqualified from furtherbidding on the work provided hereunder. Failure to claim a mistake as set forth hereinshall constitute a waiver to assert the mistake at a later time. 12. EXECUTION OF CONTRACT: The American Institute of Architects Standard FormAgreement, referenced herein, will be used as the contracting instrument.The contract form shall be signed by the proper representative of the contracting firm. 13. PERFORMANCE, LABOR AND MATERIAL PAYMENT SECURITY: The Ownershall require the successful contractor to furnish a Performance Bond in the amount of100% of the contract price as security for the faithful performance of his contract.The Owner shall require the successful contractor to furnish a Labor and MaterialPayment Bond in the amount of 100% of the contract price as security for the payment ofall persons performing labor and furnishing materials in connection therewith.The bonds shall be executed on the American Institute of Architects Performance Bondand Payment Bond (AIA Form A312-1984) as issued by the Owner and bound herein. 14. CERTIFICATE OF INSURANCE: Certificates of Insurance, for the limits describedelsewhere in these Contract Documents, will be required to be submitted to the Engineerand Owner prior to the issuance of the Notice to Proceed. 15. POWER OF ATTORNEY: Attorneys-in-fact who sign contract bonds must file witheach bond a certified and effectively dated copy of their power of attorney: One original copy shall be furnished with each set of bonds. Others furnished with a set of bonds may be copies of that original. Attorneys-in-fact who have their current Power of Attorney on file with the State Auditordo not need to submit these copies with contract bonds. 16. LAWS AND REGULATIONS: The bidder's attention is directed to the fact that allapplicable federal and state laws, municipal ordinances, and the rules and regulations ofall authorities having jurisdiction over the project shall apply to the contract throughoutand will be deemed to be included in this contract the same as though herein written infull.                                                                                                                       1. All Contractors and Subcontractors performing work on this project must havea Butte Silver Bow County Business License. 17. CONDITIONS OF WORK: Each bidder must inform himself fully of the conditionsrelating to the construction of the project and the employment of labor thereon. Failure todo so will not relieve a successful bidder of his obligation to furnish all materials andlabor necessary to carry out the provisions of his contract. 18. INTERPRETATION OF CONTRACT DOCUMENTS:Bidder shall promptly notify the Engineer of any ambiguity, inconsistency, or error whichthey may discover upon examination of the Contract Documents or of the site and localconditions. 19. ASBESTOS:All materials, products, or equipment used for the construction of this work shall betotally free of asbestos. Check all materials with the shelters asbestos coordinator beforeremoval to prevent exposure to asbestos. The Contractor shall certify in writing atcompletion of the work that all materials, products, and equipment installed do notcontain asbestos. It will be the Contractor's responsibility to ascertain frommanufacturers, suppliers, and subcontractors that all materials, products, and equipmentused are asbestos free.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS