Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on September 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

BUTTON, PUSH / PULL ETS | ref 63-003-923

Closed
2095057 [SS]State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423710
Federal
Replace Exterior Cipher Locks and Exit Hardware Retrofit, Hawaii
Solicitation # W912CN27QA010
The US Army is requesting quotes for the replacement of exterior cipher locks and the retrofit of exit hardware at Building 768, Schofield Barracks, in Honolulu, Hawaii. This project involves the removal of obsolete hardware and the installation of 17 DoD-approved standalone electronic 10-PIN pushbutton cipher locks, heavy-duty vertical rod panic exit hardware, and high-security Small Format Interchangeable Cores (SFIC). The scope includes specialized conversion trim for both standard and bullet-resistant door assemblies, ensuring all installations meet DoD physical security requirements and NFPA 101 Life Safety egress regulations. Key deliverables include the fully operational hardware, master override and control keys, DPW key custody documentation, programming guides, and a two-year warranty on workmanship and hardware. This solicitation is a total set-aside for Women-Owned Small Businesses under NAICS 432710. The government will utilize the Lowest Price Technically Acceptable (LPTA) evaluation method, requiring offerors to provide detailed technical specifications, a compliance crosswalk, and proof that installation personnel are GSA-certified and manufacturer-authorized. The period of performance is 30 calendar days from the date of award, with shipping terms set as FOB Destination. Invoicing must be processed electronically through the Wide Area WorkFlow (WAWF) system. Quotations are due by November 24, 2026, and must include a firm-fixed-price proposal and a comprehensive technical approach.
0413 Aq Hq Contract Augmented

POSTED

7 days ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The Dallas Area Rapid Transit Authority (DART) is soliciting bids under solicitation number 2095057 for the procurement of Push/Pull ETS Buttons (ref 63-003-923). This solicitation, posted on September 7, 2025, requires responses to be submitted electronically via the Bonfire portal by September 26, 2025. The scope of work involves the supply and delivery of goods in strict accordance with technical requirements and manufacturer specifications, with performance taking place in Texas. Key contractual terms mandate FOB Destination shipping, meaning freight costs must be included in the overall price. Delivery timelines are considered of the essence, and failure to meet specified rates or times may result in rejection or termination for default. Payment terms are Net 30, with invoices submitted in triplicate to [email hidden]. The Authority maintains the right to inspect and accept deliverables at the destination to ensure they are of merchantable quality and suitable for their intended use. The agreement includes several critical compliance certifications, including an anti-boycott certification regarding Israel and a certification against supporting foreign terrorist organizations. DART reserves the right to terminate the order for either convenience or default and may unilaterally modify the contract scope or specifications. The Authority is exempt from Texas state and local sales and use taxes.

General Info

DART solicits bids for Push/Pull ETS Buttons due September 26, 2025, in Texas.

Place of Performance

TX, USA

Set-Aside

NONE

Documents

1
PDF, High priority: read this first4 pages · contract-document
High

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Industrial Piping and Valve SupplyOpen now, due in 13 days
  • Proprietary Door Parts SupplyOpen now, due in 7 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Dallas Area Rapid Transit
Contacts1 person available
OfficeTX, USA

Full Description

Show more
--- ***BONFIRE REGISTRATION IS REQUIRED TO ACCESS DETAILS / BIDTABLE*** *To access details / BidTable, please initiate the "Prepare Your Submission" process at the bottom of the page -- Thereafter, locate the in-browser BidTable window and scroll right for project details and vendor response fields.*
--- **PURCHASE ORDER TERMS AND CONDITIONS** -- All purchase orders are subject to Dallas Area Rapid Transit Authority's Terms and Conditions. The complete PO Terms and Conditions PDF is available for download in the "Supporting Documentation" section below.
**Freight Terms Notice -** Please ensure that all bids/quotes reflect FOB Destination shipping terms with the freight cost included in the overall price. DART does not typically accept FOB Origin or Prepay and Add terms.
**Delivery Terms Notice -** Time and rate of deliveries are of the essence of this order. Seller's failure to deliver at the time and rate specified shall be the basis for rejection and default termination by the Authority (*Dallas Area Rapid Transit Authority*).
**Payment Terms Notice -** All vendors are advised that DART's payment terms are Net 30. Invoices shall be submitted (Sign up to see this detail) in triplicate (one copy shall be marked 'Original"), unless otherwise specified, and shall contain the following information: purchase order number; item number; purchase order description of supplies, services, or construction; sizes; quantities; unit prices; and extended totals. Unless otherwise specified, payment will be made on partial deliveries accepted by the Authority when the amount due on such deliveries so warrants. *Invoices will be paid 30 days from receipt of the invoice or 30 days from receipt of the order, whichever is later, unless other payment terms have been agreed upon in writing.*
**Termination for Default Notice -** The Contracting Officer may by written notice terminate this order, in whole or in part, for failure of the Seller to perform any of the provisions hereof within the time periods specified. In such event, the Seller shall be liable for damages, including the excess cost of reprocuring similar supplies or services or completing construction; provided that, if (i) it is determined for any reason that the Seller was not in default, or (ii) the Seller's failure to perform is without his and his subcontractor's control, fault, or negligence, the termination shall be deemed to be a termination for convenience under paragraph 12. As used in this provision, the term "subcontractor" and "subcontractors" means subcontractors, vendors, and suppliers at any level.

More opportunities from Texas → Dallas Area Rapid Transit

Same awarding agency

NAICS: 492110
New
SLED
Parcel Shipping Services
Solicitation # 2100763
Dallas Area Rapid Transit (DART) is soliciting bids under RFQ 2100763 for a qualified vendor to provide domestic and international parcel shipping services for a three-year term. The selected contractor will handle small packages weighing between 1 and 150 lbs, originating from the DART headquarters mailroom at 1401 Pacific Avenue in Dallas, Texas. Service requirements include overnight express, second-day, and ground delivery to destinations across the United States, Puerto Rico, Canada, and Mexico. Pick-up operations are scheduled Monday through Friday from 4:00 p.m. to 11:00 p.m., with DART retaining responsibility for all packaging and the coordination of shipping labels or Bills of Lading. Qualified firms must have at least three years of experience in freight shipping and ensure all personnel possess the necessary licenses and insurance. The contractor is responsible for the security and accountability of all assets during transit and must provide signed delivery receipts for every shipment. Invoices are payable within 30 days of receipt or order fulfillment, whichever is later. Bids must be submitted via the Bonfire portal by November 20, 2026, at 2:00 p.m. Central Time, and must include a signed pricing schedule, a business questionnaire, and representations and certifications. All submitted offers must remain firm for 180 calendar days.
Couriers and Express Delivery Services

POSTED

4 days ago

DEADLINE

in 3 days
View Details
NAICS: 326112
New
SLED
KIT,INSTALLATION,FILM,SLRV | 2101823
Solicitation # 2101823
The Dallas Area Rapid Transit Authority is soliciting bids for a film installation kit for SLRV under solicitation number 2101823. The response deadline is November 18, 2026, with the posting date set for November 12, 2026. This procurement is subject to the Authority's standard purchase order terms and conditions, which mandate that all bids reflect FOB Destination shipping terms with freight costs included in the overall price. Time and rate of delivery are critical, and failure to meet specified delivery schedules may result in rejection or termination for default. Payment terms are Net 30, with invoices paid 30 days from the receipt of the invoice or the order, whichever is later. Invoices must be submitted in triplicate to the designated email and include the purchase order number, item description, quantities, and extended totals. The seller is responsible for ensuring all supplies are of merchantable quality and conform to specified drawings and technical requirements, with inspection and acceptance occurring at the destination. Additionally, the seller must certify compliance with equal opportunity employment standards, confirm they do not boycott Israel, and warrant that no Authority officials have a pecuniary interest in the order. The Authority is exempt from Texas state and local sales and use taxes.
Plastics Packaging Film and Sheet (including Laminated) Manufacturing

POSTED

5 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS