Bypass Water Supply Pipeline
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Weed is advancing improvements to its water supply infrastructure in the Bel Air area and along N. Weed Boulevard through an amended environmental review process, originally initiated with an Initial Study and Mitigated Negative Declaration adopted in December 2016, followed by three addenda in 2017, 2018, and 2023. The latest proposed amendment, dated August 2025, introduces critical upgrades to address insufficient water pressure and outdated infrastructure, including installation of a new 8-inch-diameter water main along Terrace Street and replacement of approximately twelve aging two-inch water service lines that currently supply residences and businesses adjacent to N. Weed Boulevard. These new services will connect to the existing 8-inch main in N. Weed Boulevard, while the obsolete two-inch line will be decommissioned. Each new service connection will include an individual pressure regulating valve to ensure consistent and safe water pressure for customers. The project also involves replacing twelve water meters and their associated boxes. All work is confined to previously disturbed urban areas with no expansion of impervious surfaces or removal of vegetation, and construction activities are limited to temporary disturbances that comply with environmental and traffic management standards. Environmental compliance is governed by the California Environmental Quality Act (CEQA), with all project components subject to specific mitigation measures designed to ensure less-than-significant impacts on air quality, water resources, cultural resources, and wildlife. Construction must adhere to the California Manual on Uniform Traffic Control Devices for traffic safety, implement erosion and dust control protocols, and follow protocols for avoiding disturbance of potential cultural resources, including immediate work stoppage and notification requirements if human remains are uncovered. Utility coordination is required to prevent service disruptions, and all engineering designs must be performed by licensed professionals. The project is not subject to federal acquisition regulations, as it is a municipal infrastructure initiative with no federally funded components or FAR-compliant contract clauses. There is no publicly disclosed contract value, delivery schedule, or formal procurement process outlined, and all project information is managed through environmental documentation accessible via the State Clearinghouse. The City of Weed serves as the lead agency, with PACE Engineering and ENPLAN providing technical support, and the work is to be performed exclusively within the city limits of Weed, California, at the designated project corridors. There is no information on procurement methods, bid requirements, vendor certifications, or payment procedures, indicating that this phase of the project is being handled under local environmental and engineering oversight rather than a competitive federal or state contracting process.
General Info
Agency
NAICS
Place of Performance
Various, Weed, CA, 96094Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
