This Sources Sought opportunity from Department Of Defense was posted on January 10, 2019. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C-44 Intake Canal Bank Stabilization Martin County, Florida

Closed
W912EP19Z0019Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 12 hours ago

DEADLINE

in about 18 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 17 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL

Set-Aside

NONE

Documents

1

Acceptance_Criteria_for_Riprap_Chart.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts2 people available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts
Tonya M. RogersContract Specialist
Timothy HumpheryContract Specialist

Full Description

Show more
The U.S. Army Corps of Engineers, Jacksonville District is issuing this sources sought synopsis as a means of conducting market research to identify parties having an interest in and the resources to support this requirement for the C-44 Intake Canal - Bank Stabilization (ICBS) project. The project is located in Martin County, FL just north of the C-44 Canal (St. Lucie Canal) between Lake Okeechobee and the Atlantic Ocean. The C-44 Intake Canal is located about 3 miles east of Indiantown, FL along CR 726 (Citrus Boulevard). The project is scheduled to be awarded in the spring/summer of 2019.The result of this market research will contribute to determining the method of procurement. There is no solicitation at this time. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the government assumes no financial responsibility for any costs incurred. The purpose of this synopsis is to gain knowledge of interest, capabilities and qualifications of various members of industry, namely the Small Business Community to include Section 8(a), Service-Disabled Veteran-Owned Small Business (SDVOSB), Women-Owned (WOSB) and Historically Underutilized (HUBZone) concerns. The Government must ensure there is adequate competition among the potential pool of responsible contractors. Description of Project: The work consists of minor grading of the slopes of the C-44 Intake Canal starting from the north side of the Citrus Boulevard Bridge up to the crossing in the Intake Canal at approximately 4.4 miles north and placing geotextile fabric with a 12 to 18 inch thick layer of riprap on top. Since most of the proposed geotextile and riprap will be placed under water (18 inches thick up to elevation 13.0', NAVD) hydrographic and topographic surveys shall be secured by the contractor before, during and after construction. The bottom toe and the 1V:3H side slopes of the canal shall be graded for placement of the geotextile and riprap to the design top elevation of 15.3' NAVD. Most of the placement will be done in the wet and dewatering is not allowed. The material removed from the grading of the slopes shall be placed in the nearby designated disposal area. The performance period for the work is 24 months from the date of award. Specific Project Challenges: Dewatering is not allowed. Water levels in the C-44 Intake Canal are mainly affected by rainfall, evaporation, local runoff, and the operation of Lake Okeechobee which is managed by the Jacksonville District U.S. Army Corps of Engineers (Corps) in accordance with the 2008 Lake Okeechobee Regulation Schedule. The water levels in the C-44 Canal, which affect the water levels in the C-44 Intake Canal, is controlled by structures S-308 and S-80, which control the easterly discharge of Lake Okeechobee water to tidewater. In addition, S-80 provides means for passing boat traffic through the C-44 Canal. When S-308, is closed, S-80 will maintain an upstream elevation from 14.0 to 15.0 ft., NGVD29 in so far as is possible. Stone Requirement: Contractor will be required to furnish stones that are sound, durable and angular in shape. Stones shall have an elongation (ratio of greatest dimension to least dimension) less than 3:1 and no stone shall have and elongation greater than 4:1. Material shall be free from cracks, seams, non-mineralized or other defects that would tend to increase its deterioration from natural causes. Stones shall be graded in size to produce a dense interlocking mass. Riprap shall consist of dense, natural rock fragments. Stones shall be free from quarry fines, soil, shell material, organic material, and shale seams. Rounded boulders or cobbles shall not be used. Riprap shall conform to the following gradation: Type A (6-inch average size) - diameter 12-in 95-100 percentage passing, diameter 6-in 25-75 percentage passing, and diameter 3-in 0 to 10 percentage passing. SEE THE ATTACHED ACCEPTANCE CRITERIA FOR RIPRAP CHART. General Execution of Work: Base Preparation - Areas on which geotextile and riprap are to be placed shall be graded to conform to cross sections shown on the contract drawings. Excavation and subgrade preparation shall be in accordance with contract earthwork requirements. Clear the subgrade of sticks, stones, debris and other materials that could puncture the overlying geotextile. The prepared base will be inspected by the Contracting officer prior to placement of geotextile. No geotextile shall be placed on the subgrade, above or below water, without prior acceptance of subgrade conditions by the Contracting Officer. Geotextile - Place Type 1 Geotextile in accordance with contract geotextile requirements. The geotextile must be in intimate contact with the subgrade. Geotextile shall be placed only on subgrade approved by the Government. Placement of Riprap - Place riprap in a manner which produces a well-graded mass of rock with the minimum practicable percentage of voids. Riprap shall only be placed by equipment or means that are identified in the Work Plan. No equipment shall be operated directly on the completed stone protection system. Riprap shall be placed to its full course thickness in one operation and in such manner as to avoid displacing or damaging the geotextile. The large stones shall be well distributed and the entire mass of stones in their final position shall be graded to conform to the gradation specified. Placement shall begin at the bottom of the area to be covered and continue up slope. Subsequent loads of material shall be placed against previously placed material in such a manner as to ensure a relatively homogenous mass. The finished riprap shall be free from objectionable pockets of small stones and clusters of larger stones. Placing riprap in layers will not be permitted. Placing riprap by dumping it into chutes, or by similar methods likely to cause segregation of the various sizes, shall not be permitted. Placing riprap by dumping it at the top of the slope and pushing it down the slope shall not be permitted. The desired distribution of the various sizes of stones throughout the mass shall be obtained by selective loading of the material at the quarry or other source; by controlled dumping of successive loads during final placing; or by other methods of placement which will produce the specified results. Each truckload shall meet the gradation requirements. Rearranging of individual stones shall be required to the extent necessary to obtain a well-graded distribution of stone sizes as specified above. However, manipulating stone by means of dozers or other blade equipment shall not be permitted. Riprap shall be placed in conjunction with the construction of the ground surface, canal slopes or other adjacent features, earthen features, and with only sufficient lag in construction of the stone protection as may be necessary to prevent mixing of subgrade and stone protection materials. Excavation and Placement - All excavation and placement of geotextile, riprap, fill, and sod in a given work section shall be completed prior to starting a new work section. Tolerance for riprap - A tolerance of plus 6 inches and minus 3 inches from the slope lines and grades shown on the contract drawings will be allowed in the finished surface of the riprap, except that the extreme of this tolerance shall not be continuous over an area greater than 200 square feet. The average tolerance of the entire job shall have no more than 50 percent of the tolerances specified above. The Estimated Magnitude of construction is between $15,000,000 and $25,000,000. The Estimated Period of Performance is 730 from the date of Notice to Proceed. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990, Other Heavy and Civil Engineering Construction. The Small Business Size Standard for this project is $36.5 million. Firm's response to this Synopsis shall be limited to 5 pages and shall include the following information: 1. Firm's name, address, point of contact, phone number, website, and email address. 2. Firm's interest in bidding on the solicitation when it is issued. 3. Firm's capability to perform a contract of this magnitude and complexity (include firm's capability to execute comparable work performed within the past 10 years. Brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project) - provide at least 2 example. Emphasis should be on projects that included similar environmental conditions and stone requirements. 4. Firm's Business category and Business Size - Small Business, 8(a), SDVOSB, WOSB, or HUBzone. If your firm is a Small Business, be sure you understand the performance of work requirements for your specific socioeconomic category. i.e. SB, 8(a), SDVOSB, WOSB, or HUBZone. 5. If significant subcontracting or teaming is anticipated in order to deliver technical capability, firms should address the structure of such arrangements to include Joint Venture information if applicable - existing and potential. 6. Firm's Bonding Capability (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from bonding company. 7. Specify the magnitude of riprap placement (total amount of dollars and weight or volume) done in the wet, from canals or river banks performed in previous projects. 8. Experience in placing riprap on top of geotextile in both dry and wet conditions. 9. Indicate if you are anticipating the use of barge(s) for this project or the work will be performed from the canal banks. 10. Name and locations of nearby quarries and whether or not the quarries have availability of stones for this project (estimated amount of Type A riprap required is 87,000 cubic yards). All responses to this sources sought notice/market research will be evaluated and used in determining acquisition strategy. NOTE: DO NOT SUMBIT A RESPONSE TO THIS SYNOPSIS IF YOU DO NOT INTEND TO BID ON THIS PROJECT. DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENTIAL DATA. Submission Instructions: Interested parties who consider themselves qualified to perform the above-listed project are invited to submit a response to this Sources Sought Notice by no later than 08 February 2019 by 2:00PM Local Time. All responses under this Sources Sought Notice must be emailed to tonya.m.rogers@usace.army.mil. Prior Government contract work is not required for submitting a response under this sources sought synopsis. You must be registered with the System for Award Management (SAM) in order to receive a Government contract award. To register go to www.sam.gov.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 237990
New
Federal
Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, Florida
Solicitation # W912EP26BA019
The US Army Corps of Engineers, Jacksonville District, is soliciting bids for the rehabilitation of the South Jetty at Palm Beach Harbor in Palm Beach County, Florida. This firm-fixed-price construction project, identified by solicitation number W912EP26BA019, has an estimated magnitude between $1,000,000 and $5,000,000. The scope of work involves substantial manipulation of new and existing stones to achieve required interlocking and the execution of concrete repairs. All mobilization and construction activities must be water-based using marine construction methods and equipment, as land-based access to the project site is strictly prohibited. The project has an estimated period of performance of 330 calendar days following the Notice to Proceed, which includes 60 days to commence work. Critical environmental and safety requirements include a mandatory pre-construction benthic community survey and the relocation of corals by Florida Fish and Wildlife Conservation Commission qualified contractors prior to the start of jetty work. The project adheres to EM 385-1-1 safety standards and requires the use of Coast Guard-certified equipment. Contractual terms include liquidated damages of $2,818 per calendar day of delay and a bid guarantee of 20 percent of the bid price or $3,000,000, whichever is less. This unrestricted procurement falls under NAICS code 237990, and all eligible offerors must be registered in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS