Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on August 31, 2005. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

C -- A&E Serices

Awarded
NRCS-05-RI-05Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
On-Call Structural and Seismic/Disaster Engineering Services
Solicitation # FAS 2026-037
The City of Seattle Finance and Administrative Services Capital Development division is seeking to establish two on-call contracts for professional structural and seismic/disaster engineering services under solicitation FAS 2026-037. The selected consultants will provide technical expertise on an as-needed basis for small to medium projects throughout the planning, design, procurement, and construction phases, utilizing delivery methods such as Design-Bid-Build, Job Order Contracting, and the Small Works Roster. The scope of work includes structural engineering studies, seismic evaluations, confidence testing, fall protection design, and the preparation of construction documents stamped by a licensed engineer. All deliverables must adhere to specific CAD standards, including software compatibility with AutoCAD 2025.1.3 and AIA/US National CAD Standard V5. Eligible firms must be licensed to practice in Washington State and the City of Seattle, demonstrate experience with current code compliance, and provide three relevant projects completed within the last seven years. The contract features an initial one-year term with up to four optional one-year renewals, for a maximum duration of five years. Evaluation of proposals is based on relevant technical experience (40 percent), approach and methodology (30 percent), and an inclusion plan (15 percent) focusing on women and minority-owned businesses. Responses are due by December 2, 2026, via the OpenGov portal, with a target contract execution date of December 15, 2026. Consultants are required to maintain Commercial General Liability insurance and comply with various local and federal regulations, including ADA and City of Seattle labor ordinances.
Finance and Administrative Services

POSTED

about 14 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 15 hours ago

DEADLINE

in 20 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 16 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Natural Resources Conservation Service is seeking qualifications for two to three Indefinite Delivery/Indefinite Quantity contracts to provide Architecture and Engineering services throughout Rhode Island. These contracts will utilize firm-fixed price task orders for engineering planning, surveys, design, and construction inspection services to implement soil and water conservation practices. The total value for any single award will not exceed 2,000,000 dollars over a five-year period, consisting of one base year and four option years. Individual task orders will range from a minimum of 500 dollars to a maximum of 300,000 dollars. Eligible firms must be unrestricted in size and maintain a project office within 70 miles of the Rhode Island State Office. Key personnel requirements include a project manager who is a Registered Professional Engineer in Rhode Island with ten years of experience, a surveyor or civil engineering technician with ten years of experience, and a draftsperson with five years of CAD experience. Selection will be based on professional qualifications, specialized experience, capacity to perform the work, past performance, and geographic location. Interested firms must submit Standard Form 330 by October 7, 2005.

General Info

Agency

N/A

Contract Value

$500

NAICS

541330 - Engineering Services

Place of Performance

State of Rhode Island, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Sources Sought

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Alan M LetaContract Specialist

Full Description

Show more
Description of Work This is a request for SF-330 for multiple Indefinite Delivery/Indefinite Quantity (IDIQ), Architecture &Engineering services contract, utilizing Firm-Fixed Price delivery task orders in accordance with FAR 16.500 for work throughout the State of Rhode Island to be performed for the Natural Resources Conservation Service (NRCS). The contract will include one base year and up to four option year periods. Work under this contract will be subject to satisfactory negotiation of individual task orders. The price of any single task order shall be at least $500.00 but shall not exceed $300,000. The total orders placed against this contract shall not exceed $2,000,000 over a five year period (one base year and four option year periods combined) for any one successful award. The guaranteed minimum is $500.00 for the base year only. There shall be no guaranteed minimum for option years, if exercised. Task orders could include performance of any part or all operations necessary to provide solutions to natural resource problems by performing engineering planning, engineering surveys, engineering designs, and construction services for the installation of projects funded through the Wildlife Habitat Incentives Program (WHIP), the Wetland Reserve Program (WRP) or other USDA, Natural Resources Conservation Service administered programs to implement soil and water conservation practices. All engineering and non-engineering soil and water conservation practices shall be designed in accordance with Section IV of the NRCS Field Office Technical Guide (FOTG) for the State of Rhode Island. This procurement will be evaluated using Brooks Act procedures, Public Law 92-582. This procurement is unrestricted and is therefore open to all businesses regardless of size. The primary North American Industrial Classification System Code (NAICS) is 541330, which has a size standard of $4.0 million in annual average receipts. Firms will be selected for negotiation based on selection criteria for the required work. Contracts may be negotiated and awarded up to one year after completion of the selection process. The government contemplates the award of two to three Indefinite Delivery, Indefinite Quantity (IDIQ), A&E services contracts utilizing Firm-Fixed Price delivery /task orders type contracts. The period of performance for the base year will run from contract award through September 30, 2006. The government may, at its option, extend the contract to a maximum of five years by exercising each of the four one year renewal options. Work under each of the contracts will be subject to satisfactory negotiation of individual task orders. Task orders will be negotiated as firm-fixed price procurements for individual or clusters of soil and water conservation practices. The A&E services could include performance of any part or all operations necessary to provide solutions to natural resource problems by performing services as required for the preparation of plans, specifications, cost estimates, and related studies for the engineering planning (conceptual designs), engineering surveys, engineering design, and construction inspection services for the installation of soil and water conservation practices at various locations in the State of Rhode Island. Engineering planning activities required may consist of, but are not limited to: - Any part of the preparation of engineering planning documents for scheduling the installation of selected alternatives with associated cost estimates and quantity estimates for the installation of soil and water conservation practices; - Provide resource information and technical requirements; - Develop alternatives to protect resources and meet other objectives of the landowner. Inform the landowner of potential operation and maintenance requirements; - Conducts site investigation and preliminary surveys as needed. Inform landowner of potential construction requirements, and needed permits; and - Prepare damage survey reports (DSR) for emergency recovery work. Engineering surveys required may consist of but are not limited to any part or all of the following activities: topographic / planimetric surveys, photogrametric surveys, magnetometer surveys, hydrographic/ bathymetric surveys, horizontal and vertical control surveys, survey quality GPS surveys, design surveys, development of graphical representations of survey data collected, construction layout and certification surveys, and surveys for quantity computations; Engineering design activities required may consist of but are not limited to any part or all of the following activities: preliminary field investigations, geologic and soils investigations, design of soil and water conservation practices, designing of emergency recovery work, repair and replacement of existing systems, prepare construction specifications, prepare engineering and construction plans (drawings), prepare land rights work maps, prepare quantity and cost estimates, prepare bid schedules, quantity computation checks and certifications, prepare breach analysis, prepare water surface profiles, prepare hydrologic and hydraulic designs of soil and waters conservation structures, and prepare design documentation folders. The typical project will require knowledge and experience in all aspects of engineering planning, engineering surveys, engineering design, and construction services associated with the design and construction of; deep and shallow foundations (bearing capacity, consolidation, seepage, etc.), earth embankments, grassed waterways, structures for water control, critical area shaping and planting, grade stabilization structures, Fish Passage including: design of steep-pass and denil fish ladders, dam removal and rock ramps, wetland restoration or creation including: fresh water and coastal wetlands, vernal pool creation, roller compacted concrete structures, diversions, earthwork, reinforced concrete structures, automated and manual water control gates, rock riprap placement, timber structures, steel structures and structural fabrication, timber, steel and concrete piling, sheet piling and channel bank stabilization measures, and preparing documents for submittal of applicable permits. Construction Services required may consist of, but are not limited to, any part of construction layout, construction inspection, construction quality control (inspection), construction checkout and certification of completed soil and waters conservation practices including emergency recovery work. Construction services do not include actual construction of the soil and water conservation practices. The firm will be required to perform engineering planning, engineering surveys, engineering designs, and construction services, as indicated above, for the installation of soil and water conservation practices in accordance with NRCS standards as listed in Section IV of the Field Office Technical Guide and certify that all engineering planning documents, engineering surveys, engineering designs, and construction services meet NRCS standards, specifications, policy, handbooks, and documentation requirements. The firm will be required to interpret geotechnical reports and accurately apply the data to the design of the soil and water conservation practice measures were available. The design work will be civil, agricultural, or environmental. The A&E services may involve direct consultation, inspection of construction for a specific project, including reviews of shop drawings, material selections, and quality control testing such as those associated with concrete placement and earthfill compaction. A&E services are required to provide solutions to natural resource problems by providing engineering planning, engineering surveys, engineering design, and construction inspection services for the installation of any soil and water conservation practices as listed in Section IV of the Field Office Technical Guide. Applicable references include Section IV of the Field Office Technical Guide, National Engineering Handbook Series, the Engineering Field Handbook, the National Engineering Manual and Rhode Island supplements to the referenced documents. More information may be found at the following website: http://www.nrcs.usda.gov/technical. The Field Office Tech Guide can be located at: http://www.nrcs.usda.gov/technical/efotg/. All drawings will be computer generated in *.dwg format. All reports shall be *doc, *pdf, or *xls formats. All CAD related data shall be generated using the most updated version of AUTOCAD unless specific arrangements are made with NRCS-RI engineering staff. Electronic copies and original hard copies are to be furnished to NRCS. These contracts could include design for repair and replacement of existing systems and review of services provided by other A&E firms. Responses should include proposed sub-consultants for all disciplines for engineering planning, surveying, civil, hydrology, hydraulics, environmental, geotechnical and soil mechanics engineering, and biological knowledge of wetland science. Responses should also include the qualifications of personnel and descriptions of facilities, materials, equipment, and services to perform the type of tasks described by this notice. The estimated construction cost of the proposed individual construction projects for the installation of soil and water conservation practices will typically be between $2,000 and $500,000. PRESELECTION CRITERIA: Firms must meet the following criteria in order to be considered for an award under this requirement. (1) Have a project office located within 70 miles of the Rhode Island State Office (2) Have a minimum of two engineers as key personnel for this contract. The project manager must be a Registered Professional Engineer in the state of Rhode Island with a minimum of ten years experience in engineering planning, engineering surveys, engineering designs, and construction services for soil and water conservation practices as listed in the Section IV of the Field Office Technical Guide or equivalent standards and specifications, and must have direct experience with the design and implementation of soil and water conservation practices or equivalent experience. (3) Have a minimum of one surveyor or one civil engineering technician (CET) or as key personnel for this contract with a minimum of ten years experience in engineering surveys and construction services for soil and water conservation practices or equivalent experience. (4) Have a minimum of one draftsperson as key personnel for this contract, with a minimum of five years CAD experience. (5) Demonstrate a knowledge of NRCS engineering policies and guidlines and the National Engineerinng Handbooks. SELECTION CRITERIA: Firms meeting the pre-selection criteria will be evaluated and ranked using the following selection criteria: (1) Professional qualifications necessary for satisfactory performance. Evaluation will be based upon the number of qualified personnel and their knowledge and level of experience associated with the requirements above, and their availability to perform work on this contract. (2) Specialized experience and technical competence in the type of work required. Evaluation will be based on the extent of directly related experience in performing engineering planning, engineering surveys, engineering designs, and construction services of the types of projects described; specialized education at the university level, and all other applicable education, training, and certifications. Consideration will be given to those firms with knowledge of and direct experience in the application of the described requirements in all phases of engineering planning, engineering surveys, engineering design, and construction services for application of soil and water conservation practices in Rhode Island or equivalent practices. Evaluation will include experience using SITES, HEC-RAS, TR66, TR20, WINTR55, EFH2 computer models, following design criteria and guidelines as outlined in the Section IV of the Field Office Technical Guide or equivalent standards and specifications, hydrologic and hydraulic design of simple and complex soil and water conservation practices, designing complex foundation and drainage features, designing emergency recovery work, and previous experience in the engineering planning, engineering survey, engineering design, construction services of NRCS soil and water conservation practices. Evaluation will include experience and technical competence in the areas of soil mechanics, hydrology, hydraulics, surveying, structural design, CADD, fish passage including: design of steep-pass and denil fish ladders, dam removal and rock ramps, culvert modification, wetland restoration or creation including: fresh water and coastal wetlands, vernal pool creation, grade stabilization structures, structures for water control, critical area shaping and planting, wetland science, other erosion control practices, diversions, previous experience with NRCS standards and specifications as outlined in Section IV of the Field Office Technical Guide or equivalent standards and specifications, and previous experience in construction services including construction layout, construction inspection, construction checkout and certification of completion of equivalent conservation practices. Examples of work shall be documented for review, as well as a description of the type work performed. These work descriptions will be evaluated based on documented complexity of work performed. Examples of work shall be documented for review, as well as a description of the type work performed on SF-330. These work descriptions will be evaluated based on documented complexity of work performed. (3) Capacity to accomplish the work. Evaluation will be based upon the number of personnel available in the disciplines described above, the quantity of existing work under contract, the schedules for completion of the existing work, and the capacity to provide personnel for multiple contracts. (4) Past performance on contracts with other government agencies and private industry. Evaluation will be based upon the firm's past experience with other government agencies and the private sector in performing the requirements described; the quality and timeliness of performance under previous contracts. References with name and telephone numbers must be provided. (5) Location in the general geographic area and knowledge of the locality and the natural resource concerns. Evaluation will be based upon the firm's proximity to the State of Rhode Island and the knowledge of specific natural resource concerns or conditions that affect conservation practice design in the indicated State. Firms must clearly indicate the office location where the work will be performed and the qualifications of the individuals proposed to work on this contract. The above evaluation factors listed in their order of importance, (1) Professional Qualifications (30%) (2) Specialized Experience (20%) (3) Capacity to accomplish the work (20%) (4) Past Performance (20%) (5) Geographic Location (10%) SUBMITTAL REQUIREMENTS: Firms, which meet the requirements described in this announcement, are invited to submit 5 copies of a Standard Form 330, Architect-Engineer Qualifications. Interested firms must submit their SF-330 not later than October 7, 2005, 4:30 p.m. EST, to the attention of the Contracting Officer. Clearly indicate the office location where the work will be performed and the qualifications of the individuals and subcontractors proposed to work on the contract and their geographical location. Include an organizational chart, and qualifications of key personnel. Firms responding to this announcement before the closing date will be considered for selection, subject to any limitations indicated with respect to size and geographic location of the firm, specialized technical expertise, or other requirements listed. Only those firms responding by the time listed above will be considered for selection. After an initial evaluation, which takes approximately 30 days, the most highly rated firms will be selected. Selected firms will then be sent a solicitation to provide their proposals. Firms must provide a customer reference list with addresses and telephone numbers for all projects listed as related experience and a project workload schedule showing proposed personnel members for the project period. Interviews for the purpose of discussing prospective firm's qualifications will be conducted either in person or by teleconference. All firms must be registered in the Central Contractor Registration (CCR) to be considered for an award of a federal Contract. For information regarding registration, contact the CCR Web Site at www.ccr.gov. This is not a Request for Proposal. Any questions should be addressed to the Contracting Officer.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS